Tlou Energy Ltd · ASX:TOU

Tlou Energy — Investor Presentation (July 2018)

23 slides from Tlou Energy's investor presentation, July 2018

  1. Slide 1: Southern African Power Market Study

    Slide 1: Southern African Power Market Study

    . , “ in ‘ ay , ¥ 4. 3 & 4 4 t ~ ay of, WY ‘ 3 7a ‘ 4, . a . ‘ a wet. 2 5 “ene, TLO F ' - ee f= % i‘, . £ * @ 5 ‘aie a es y ants $s «Res “ ' re * ' s -] ‘ Bee ' ' sa xy Fe ae ern African Power ~~ Market Study Prepared by Tlou Energy Limited Soll in association with the Mott MacDonald Group July 2018

  2. Slide 2: Annual energy and peak demand growth by country

    Slide 2: Annual energy and peak demand growth by country

    Annual energy (GWh) +43% by 2030, by country Peak demand (MW) +52% by 2030, by country Source: regional government planning documents, official forecasts

  3. Slide 3: Botswana average daily demand versus Morupule B output

    Slide 3: Botswana average daily demand versus Morupule B output

    Botswana average daily demand was 400-500MW Morupule B operated <300MW for most of 2016 in the same period Source: Data obtained by Mott MacDonald staff from the National Control Centre (NCC) at Segoditshane Substation in Gaborone, Botswana on 4th August 2016

  4. Slide 4: Botswana native generation supply and imports, 2015-16

    Slide 4: Botswana native generation supply and imports, 2015-16

    Botswana native generation supply and imports, 2015-16 Source: Data obtained by Mott MacDonald staff from the National Control Centre (NCC) at Segoditshane Substation in Gaborone, Botswana on 4th August 2016

  5. Slide 5: Botswana demand projected to grow strongly

    Slide 5: Botswana demand projected to grow strongly

    Botswana demand projected to grow strongly Morupule B hourly generation curve plotted against load forecasts 1,800 1,600 1,400 1,200 Balance will need to be met by reliable new capacity or MW 1,000 imports 800 600 400 200 0 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2

  6. Slide 6: Traditional capacity planning approach

    Slide 6: Traditional capacity planning approach

    Traditional capacity planning approach (dispatchable power only) • Match long-term growth in peak demand against committed dispatchable capacity. • Non-dispatchable capacity (such as solar or wind power) is often not considered in capacity planning as it may not be available at system peak • Demand-

  7. Slide 7: Botswana supply options

    Slide 7: Botswana supply options

    Botswana supply options * Botswana will need to add up to 500MW of committed, dispatchable ee generating capacity by 2040, in order to keep pace with eman * If projects slip in schedule, imports will increasingly be relied upon * As shown in the following slides, it is expected that the supply-deman

  8. Slide 8: Regional planned power investment by country

    Slide 8: Regional planned power investment by country

    90,000 • Zimbabwe USD8.8bn (50% of 2016 80,000 GDP) 70,000 • South Africa USD57.4bn 60,000 • Namibia USD4.2bn 50,000 • Zambia USD5.9bn USD M • Botswana USD1.8bn: 40,000 • 100MW solar w. storage 2019 30,000 • Morupule B (5&6) 2020 20,000 • 100MW gas CCGT 2021 10,000 0 2016 2017 2018 2019 2020 2021 20

  9. Slide 9: Regional supply

    Slide 9: Regional supply

    Regional supply * Historically, new power generation projects in the region have not been rolled out in a timely fashion * Many are currently stalled, and may not proceed * It is unclear how ~USD80bn of new power capacity in these countries will be financed * For example, USD8.8bn of new investment

  10. Slide 10: Delays to new capacity could cause severe shortages

    Slide 10: Delays to new capacity could cause severe shortages

    450,000 We analysed 3- and 5- year delays to new capacity , which could lead to 400,000 severe power shortages in the next 350,000 decade 300,000 Power markets move in cycles of 1) 250,000 GWh supply surplus, 2) under-investment, 200,000 then 3) deficit. The current Eskom supply overhang and cheap t

  11. Slide 11: Reliance on Eskom for long-term supply security is unsustainable

    Slide 11: Reliance on Eskom for long-term supply security is unsustainable

    Reliance on Eskom for long-term supply | security is unsustainable ae = Q Search “Sine Bloomberg the Company & Its Products | Bloomberg Anywhere Login | Bloomberg Terminal Demo Request Business What Is South Africa Doing to Tackle Its Electricity Crisis? By Michael Cohen and Paul Burkhardt 8 Septemb

  12. Slide 12: Summary of SAPP Tariffs

    Slide 12: Summary of SAPP Tariffs

    As part of the study, estimates of local and import tariffs were calculated in USD-equivalent terms (Table 1-1). Noting that legacy tariff structures are typically sub-economic, and that some utilities are in financial distress and have sought redress from their regulators in the form of future tari

  13. Slide 13: BPC tariff levels versus operating costs

    Slide 13: BPC tariff levels versus operating costs

    BPC tariff levels versus operating costs Tariffs would need to rise by up to 80% for BPC to recover costs Source: BPC Annual Report, 2017

  14. Slide 14: BPC net operating profit/loss and Government tariff subsidy grant

    Slide 14: BPC net operating profit/loss and Government tariff subsidy grant

    BPC net operating profit/loss and Government tariff subsidy grant BWP 10bn (USD 1bn) required during 2017-2020 Source: BPC Annual Report, 2017

  15. Slide 15: Eskom's claw back

    Slide 15: Eskom's claw back

    Eskom’s claw back * On 14 June 2018 NERSA advised that it will allow Eskom to recover R32.6g9bn (USD~2.8bn) in non-recovered costs from the three years 2014-2016 * The costs are to be recovered through tariff increases to standard and international customers, and customers on ‘special pricing agreem

  16. Slide 16: Summary of MM Market Study

    Slide 16: Summary of MM Market Study

    Summary of MM Market Study * Electricity demand is projected to grow strongly across Southern Africa over the next 20 years * New industry in the region will be seeking reliable base load electricity supply * While the system is currently in surplus, due mainly to Eskom, this situation is not expen’

  17. Slide 17: Tlou Lesedi Project

    Slide 17: Tlou Lesedi Project

    Tlou Lesedi Project * Onshore Gas-to-Power Developer in Botswana * Market with huge future demand * 1st mover advantage (Upstream EIA and Mining Licence in place) * Ideal location in Botswana * Significant Gas Reserves and Contingent Resource — — Wy

  18. Slide 18: Botswana Project Map

    Slide 18: Botswana Project Map

    Botswana Project Map Letlhakane > 90MW Orapa Power Station Selemo Pilot - flowing gas since Aprl “16 Morupule Power Station Proposed Gas & Power Plant Pilot Pod rn Tlou Field Camp Tlou Laydown Yard Transmission Network 4 Bistiog Proposed mr 400 KV 220KV A me 132KV f — ww P — BV Proposed Power Mining

  19. Slide 19: Tlou's CBM extraction method

    Slide 19: Tlou's CBM extraction method

    The Company extracts CBM natural gas from coal, using horizontal drilling techniques. This CBM gas can then be used for electricity generation. ➢ Tlou’s CBM extraction method ✓ Dual Lateral Pods, each comprising one vertical and two horizontal wells ✓ Proven technology ✓ Minimum footprint allowing a

  20. Slide 20: Company milestones timeline

    Slide 20: Company milestones timeline

    2012 2014 2016 2018 First Contingent First Gas Upstream Significant Increase in Gas Resources Environment Gas Reserves and approval Contingent Resources First Gas Reserves 2009 2013 2015 2017 Botswana ASX Listing Increased First gas fired power operations Contingent produced for field use commenced

  21. Slide 21: For Investors and For Botswana

    Slide 21: For Investors and For Botswana

    ➢ For Investors ➢ For Botswana ❖ Leading CBM project in the region ❖ Creates vital direct and indirect employment ❖ Significantly de-risked ❖ Energy security by removing the need to import expensive power ❖ Enormous potential upside as the project moves into development and generates first revenue ❖

  22. Slide 22: Gas reserves and contingent resources in place

    Slide 22: Gas reserves and contingent resources in place

    ✓ Sufficient Reserves already in place for initial project development ✓ Further Reserves and Resources in place for significant expansion 2P Gas Reserves in place: 3P Gas Reserves in place: 3C Contingent Resources ~41 BCF ~427 BCF ~3,043 BCF • a 10 MW project for 25 • a 100 MW project for 25 • This

  23. Slide 23: Develop up to 10 MW of power

    Slide 23: Develop up to 10 MW of power

    ➢ Develop up to 10 MW of power: ❖ Targets first revenue while minimising initial capex requirement ❖ Sufficient gas reserves already in place ❖ Achieves grid connection and facilitates simple expansion ❖ Easily integrate solar generation ➢ Strategy: ❖ Drill pilot wells sufficient for the first 2 MW

Source: Internet Archive copy of tlouenergy.com