Independence Gold Corp. · TSXV:IGO

Independence Gold — Investor Presentation (December 2024)

20 slides from Independence Gold's investor presentation, Dec 11, 2024

  1. Slide 1: Independence Gold Corp. – 3Ts Gold & Silver Project

    INDEPENDENCE GOLD CORP. 3TS GOLD & SILVER PROJECT Central British Columbia INGOLD.CA | TSX.V: IGO OTCQB: IEGCF 1

  2. Slide 2: Forward Looking Statement

    FORWARD LOOKING STATEMENT Certain of the statements made and information contained herein is "forward-looking information" within the meaning of the British Columbia Securities Act. This includes statements concerning the Company's plans at its mineral properties, which involve known and unknown ris

  3. Slide 3: Notes on Mineral Resource Assumptions Made in This Presentation

    NOTES ON MINERAL RESOURCE ASSUMPTIONS MADE IN THIS PRESENTATION 1. The classification of the current Mineral Resource Estimate into Inferred Resource is consistent with current 2014 CIM Definition Standards - For Mineral Resources and Mineral Reserves. 2. All figures are rounded to reflect the relat

  4. Slide 4: Corporate Summary

    A NI 43-101 compliant resource estimate with 4,469,297 tonnes at 3.64 g/t gold and 96.26 g/t silver (at a 0.4 g/t gold equivalent (“AuEq”) cut off for in-pit and 2.0 g/t AuEq CORPORATE underground), containing 522,330 ounces of gold and 13,831,415 ounces of silver; SUMMARY 4,470,000 tonnes at 4.72 g

  5. Slide 5: Financings, Share Structure, Ownership

    JUNE 2016 (Newmont) 10,884,00 FT @ $0.18 / share FINANCINGS Proceeds: $1.96m JULY 2020 14,285,714 FT @ $0.07 / share $1.00m DECEMBER 2020 4,285,714 NFT @ $0.14 / share 9,687,500 FT @ $0.16 / share Proceeds: $2.15m DECEMBER 2021 2,700,000 NFT @ $0.10 / share 15,175,000 FT @ $0.10 / share Proceeds: $1

  6. Slide 6: Leadership

    LEADERSHIP RANDY TURNER, PGeo. DARCY MARUD, PGeo. President & CEO, Director Director Mr. Turner is a Professional Geologist with over 50 years of experience in Canadian and international exploration, business Mr. Marud is a Professional Geologist with more than 35 years of experience in the Americas

  7. Slide 7: 3Ts Project Location

    3TS PROJECT LOCATION 3TS PROJECT | 100% Interest Advanced exploration project in the Nechako Plateau, BC Located 16 km south of the Blackwater Gold Project (Artemis Gold Inc.) Project road accessible from Prince George. Vancouver to Prince George is 9 hours by vehicle or 1hr 20mins by direct flight.

  8. Slide 8: 3Ts Project – Location & Highlights

    3TS PROJECT – LOCATION & HIGHLIGHTS • Mineral tenure is 100% owned, with 15 claims over 5,200 hectares of the Nechako VANDERHOOF PRINCE GEORGE Plateau region in central British Columbia. • Over 66,000m of diamond drilling in 337 holes since the mid-1990’s. • Other work includes soil grids, geophysic

  9. Slide 9: Known Veins and Blue Sky Potential

    KNOWN VEINS AND BLUESKY POTENTIAL LAYMAN & DOBBY (1KM WEST) 4.5 KILOMETRES TOMMY DIXIE TED-MINT CARDIFF JOHNNY IAN LARRY GOOFY / BUTCH DAISY BALROG ALF RINGER OOTSA BILLY TARGET STATUS Vein – In Resource Vein – Outside Resource Copper-Silver Target Drilled Target Prospected Target 9 INGOLD.CA | TSX.

  10. Slide 10: Primary Targets

    PRIMARY TARGETS Vein Status Confirmed Notes Strike Ted-Mint Drilled – 1,000 m Open at depth Resource Tommy Drilled – 1,025 m Open at depth Resource Johnny Drilled 240 m Open along strike and at depth Billy Prospected 135 m Open along strike Ian Drilled 160 m Open along strike and at depth Larry Dril

  11. Slide 11: Epithermal Deposits

    EPITHERMAL DEPOSITS 0m Paleosurface GREY REPRESENTS ERODED MATERIAL FROM PALEOSURFACE TOP OF SYSTEM ERODED AWAY Upper volatile zones are missing. Veins likely formed at slightly different times and METAL ZONES burial depths which contributes to the levels mineralization occurs. -200m Modern Surface

  12. Slide 12: Ted-Mint Vein System

    TED-MINT VEIN SYSTEM The Ted-Mint vein system strike north-south for 1,000m on surface and remains open at depth. The vein is surrounded by wider zones of stockwork and breccia that creates dilational zones with broad mineralization. Drill Details • TT13-073 at NAD83 Zn10 365055E / 5876604N Az 255de

  13. Slide 13: Tommy Vein System

    TOMMY VEIN SYSTEM VEIN The Tommy Vein System is currently the largest vein at the 3Ts project, with a strike Microdiorite Sill of 1,025m and remaining open at depth. Recent work has identified a series of narrower accessory veins to the east of the main vein, similar to what we see in the Ian Vein S

  14. Slide 14: New Discoveries – Ian Vein System

    NEW DISCOVERIES IAN VEIN SYSTEM The Ian Vein System was discovered in 2023 and produced the highest project grades in early 2024 with samples up to 131 g/t gold and 927g/t silver**. The Ian Veins are proximal to the Tommy Pit model and may be included in a future resource estimate. The system remain

  15. Slide 15: 3Ts Project – Current Inferred Resource

    3TS PROJECT – CURRENT INFERRED RESOURCE • The current inferred resource estimate was completed by SGS Laboratories in 2022. • New resource model includes an open pit and underground extraction component divided over three sites – Tommy, Ted and Mint. • The new inferred resource calculations do not i

  16. Slide 16: Metallurgy

    METALLURGY COMPOSITE 1 Tommy Vein System COMPOSITE 2 Ted-Mint Vein System Total Gold Total Silver Total Gold Total Silver Recovery Recovery Recovery Recovery Gravity Concentrate 1.46% 0.57% 27.6% 3.62% Metallurgical testing Floatation Concentrate 76.0% 74.8% 64.1% 84.8% returned recoveries up to 97.

  17. Slide 17: Ootsa Copper-Silver Target

    OOTSA COPPER-SILVER TARGET The Ootsa target is early in its exploration phase and may 0.36% Cu 70.9 g/t Ag represent the top of a copper-silver porphyry system. These types of deposits serve as a source of fluids 0.17% Cu for the epithermal veins we see at 18.9 g/t Ag 2.69% Cu 189 g/t Ag 3Ts. 0.51%

  18. Slide 18: Ootsa Copper-Silver Target

    OOTSA COPPER-SILVER TARGET Sample from Ootsa showing quartz Surface rubble from around the main Drill core from inaugural vein with malachite, azurite, bornite showing with malachite and azurite 2023 (3TS-24-34*) drilling and native copper. on surfaces. with magnetite alteration in microdiorite. Cha

  19. Slide 19: 2024-2025 Exploration Program

    2024-2025 EXPLORATION PROGRAM • A 10,000m drill program commenced on 2nd November 2024 and is due to run into April 2025, with an estimated budget of approximately $5.0 million. • Targets include: • Resource infill drilling along the Tommy and Ted-Mint Vein. • Depth testing mineralized extents at th

  20. Slide 20: Contact

    CONTACT PHONE: +1 (604) 687 3959 EMAIL: info@ingold.ca WEB: www.ingold.ca TICKER: TSX:V IGO OTCQB: IEGCF Andrew Randell, P.Geo., is the Qualified Person, as defined by National Instrument 43-101 has reviewed the technical information in this presentation 20

Independence Gold — Investor Presentation (December 2024) on 6ix