Enagas Sa · BME:ENG
Enagas Sa — Call for Interest webinar for a renewable hydrogen network in Spain (September 2023)
21 slides from Enagas Sa's conference presentation, Sep 14, 2023
Slide 1: Call for Interest for the development of a renewable hydrogen network in Spain
Call for Interest for the development of a renewable hydrogen network in Spain September 14 th , 2023
Slide 2: Index
Index 1 Europe sets the path for hydrogen and decarbonization 2 Enagás, a key player in the new hydrogen scenario 3 Hydrogen Day: vision of the future H2 network 4 Call for Interest launch process 5 An additional step for the deployment of a hydrogen infrastructure network 6 Launch process: Septembe
Slide 3: Europe sets the path for H2 and decarbonization
1 Europe sets the path for H2 and decarbonization REPowerEU Plan and PNIEC draft update Reduce Russian dependence Diversify energy sources Energy saving Promote the energy transition Accelerate H2 consumption with 20 Mt in 2030 10 Mt domestic production 10 Mt imports Smart investments Developmen
Slide 4: Enagás, a key player in the new hydrogen scenario
2 Enagás, a key player in the new hydrogen scenario Catalyst for a hydrogen market Enagás Infraestructuras de Hidrógeno: HNO Experts in transmission networks with European TSO prepared to be operator of the more than 11,000 km of gas pipelines future hydrogen network Knowledge and necessary tool
Slide 5: Hydrogen Day: Vision of the future H2 network
3 Hydrogen Day: Vision of the future H2 network Theoretical prospective of the hydrogen market in Spain Potential production and demand at national level, as well as potential import and export of H2, with a 2030 and 2040 vision Preliminary network proposal, which 2030 definition matches the vis
Slide 6: Hydrogen Day: vision of the future H2 network - Spanish Backbone
3 Hydrogen Day: vision of the future H2 network Estimated maximum investments Segments Technical specifications Investment Axis 1 Cantabrian Coast Axis Approx. length: ≈ €1,650 M Valle del Ebro Axis 1,500 km Levante Axis Approx. length: Spanish Backbone Vía de la Plata Axis Axis 2 * Galicia Connecti
Slide 7: Call for Interest launch process
4 Call for Interest launch process Enagás’ main objectives for the process Contrast, in a non-binding process, the needs of the H2 market as well as those for ammonia, oxygen and CO2 A process which is coordinated with the key stakeholders of the sector, to contextualize national and international B
Slide 8: An additional step for the deployment of a hydrogen infrastructure network
5 An additional step for the deployment of a hydrogen infrastructure network 2023 2024 2025 CALL FOR NON-BINDING BINDING Open INTEREST Open Season Season • Attracting interest • Collection of additional information • Information analysis • Analysis of the information • Analysis of the information •
Slide 9: How to participate?
6 Launch process: September 22nd, 2023 How to participate? Visit the Enagás website to access the web form: www.enagas.es If you have any questions about the process, please contact us: callforinterestH2@enagas.es The web form will be available from September 22nd until November 17th. We would a
Slide 10: What information will be requested?
6 Launch process: September 22nd, 2023 What information will be requested? Categories Information to be analysed • Fundamental aspects such as positioning in the hydrogen market value chain (producer, User consumer, marketer), main shareholders of the entity and/or partners for the characterisation
Slide 11: How to participate?
6 Launch process: September 22nd, 2023 How to participate? 1 Access the Enagás website www.enagas.es 2 Click on “I want to participate” 11
Slide 12: Click on Register
6 Launch process: September 22nd, 2023 3 Click on “Register” 12
Slide 13: Fill in the required fields
6 Launch process: September 22nd, 2023 4 Fill in the required fields (*) and click “Next” 13
Slide 14: Click on Add project
6 Launch process: September 22nd, 2023 5 Click on “Add project” and add all the projects you want to participate in. (Indicate your name and role in each of them: producer, consumer, trader or a combination of them) 14
Slide 15: Attach confidentiality agreement and power of attorney
6 Launch process: September 22nd, 2023 6 Attach a signed copy of the Confidentiality & Non- Disclosure Agreement and the Signatory Power of Attorney and click on “Submit” Note: The draft confidentiality agreement will be available on the home page 15
Slide 16: Receive username and password
6 Launch process: September 22nd, 2023 7 You will receive an email with your username and password to participate in the Call for Interest process 16
Slide 17: Access to the platform
6 Launch process: September 22nd, 2023 Access to the platform 8 Register with your username and password to provide, through the questionnaires, the information on your associated profile (producer, consumer, trader or a combination of them), as well as the information related to the projects you ha
Slide 18: Customer profile characterization form
6 Launch process: September 22nd, 2023 Customer profile characterization form 9 Create a new form for your characterization 18
Slide 19: Project information form
6 Launch process: September 22nd, 2023 Project information form 10 Click on each of the projects you have registered for to fill in the associated information. 19
Slide 20: Project information form
6 Launch process: September 22nd, 2023 Project information form 11 Once the information for each project has been filled out, click on “Close and send Call for Interest”. 20
Slide 21: Thank you
Thank you iferay Red Troncal Espanola de Hidrégeno
Enagás — Call for Interest webinar for a renewable hydrogen network in Spain (September 2023) on 6ix