Golden Predator Mining — Investor Presentation (January 2017)
29 slides from Golden Predator Mining's investor presentation, January 2017
Slide 1: Advancing a District Scale Gold Project in Canada's Yukon
Advancing a District Scale Gold Project in Canada’s Yukon CORPORATE PRESENTATION January 2017 TSXV:GPY OTCQX:NTGSF
Slide 2: Disclaimer
Disclaimer ©2017 Golden Predator Mining Corp. All rights reserved. Unless otherwise noted, “Golden Predator” and all other marks used in this presentation are trademarks of Golden Predator (the “Company”). Any reproduction or dissemination of any feature of this presentation, in whole or in part, or
Slide 3: Corporate Overview
Corporate Overview 3 Aces project – high grade gold project in Yukon, Canada 2016 program completed which include drill results (11): - 7.54 m of 32.65 g/t gold - Discovery of new blind vein at depth of 71.63 m with 3.23 m of 10.04 g/t gold 3 Aces Project - 25,000 m drill program planned for 2017 Se
Slide 4: Capital Structure
Capital Structure $57.5 MM 45% $9.0 MM Market Capitalization Of Shares Held by Top 5 Cash Position Shareholders Reporting Insiders Partially (+10% Shareholders) Outstanding Diluted* William M. Sheriff 15.79% 18.61% Eric Sprott 13.55% 19.04% FCMI Parent Co.** 4.43% 9.50% McEwen Mining Inc. 6.27% 10.9
Slide 5: Market Metrics
Market Metrics Shares Issued and Outstanding 76.73MM Current Cash & Marketable Securities 9.0 MM Stock Options 5.93 MM Potential Proceeds from Warrants 16.5 MM Warrants ($0.15 - $1.00 strike price) 40.44 MM Share Price $ 0.75 Fully Diluted Shares 123.1 MM Long Term Debt (2017 – 19 Maturities) 3.2 MM
Slide 6: Board of Directors
Board of Directors William M. Sheriff, MSc| Executive Chairman • Chairman and founder of enCore Energy Corp. & Golden Predator • Co-founder and Chairman of Energy Metals Corporation, NYSE listed company sold to Uranium One for $1.8 billion dollars in 2007 Jesse Duke| Director • Principal of Ibex Val
Slide 7: Management
Management Janet Lee-Sheriff Chief Executive Officer • Previously served as Executive Vice-President of Golden Predator, and as President of Tigris Uranium Corp. • Successfully negotiated and implemented a number of socio-economic and exploration agreements between the Company and several Yukon Firs
Slide 8: Focused First Nation Relations
Focused First Nation Relations Accomplishments • Socio Economic Accord (SEA) for Brewery Creek Project • Kaska Nation Exploration Accord • Focused on employment and contracting including business formation and major contracts • Yukon First Nation Trade Mission to northern Saskatchewan uranium mines
Slide 9: Brewery Creek Project
BREWERY CREEK PROJECT TSX.V:GPY -9-
Slide 10: Brewery Creek Project – Established Ounces
BREWERY CREEK PROJECT – Established Ounces Brewery Creek Indicated & Inferred Resources (1) Indicated Resources Inferred Resources Contained Contained Au Tonnes Au (g/t) Tonnes Au Au (ounces) (g/t) (ounces) Oxide 14,152,000 1.27 577,000 9,309,000 0.93 279,000 Sulfide 3,459,000 1.28 142,000 12,408,00
Slide 11: Brewery Creek Project – Established Ounces
BREWERY CREEK PROJECT – Established Ounces Preliminary Economic Assessment (PEA) completed in Q4, 2014 Metallurgical and Geotechnical Drilling completed in September 2016, preliminary results include: • 8.2 m of 21.3 g/t gold including 5.1 m of 32.1 g/t gold from the east side of the Lucky pit. • 17
Slide 12: 3 Aces Project, Yukon
3 ACES PROJECT, YUKON TSX.V:GPY -12-
Slide 13: 3 Aces Project – Orogenic Gold Model
3 ACES PROJECT – Orogenic Gold Model Orogenic gold districts are well documented in Western North America. They include the California Mother Lode Belt, the Juneau Gold Belt, and the Fairbanks Gold Belt including the Pogo deposit. The 3 Aces project shares all of these defining features typical of t
Slide 14: Flagship Property: 3 Aces Project
FLAGSHIP PROPERTY: 3 Aces Project 3 Aces Gold District • 225 km2 (23,000 hectares) land package with visible gold occurrences • Year-round road access via the Cantung Mine Road and bridge over Little Hyland River • Major exploration program commenced August 2016; drill program completed in December
Slide 15: 3 Aces Project – Central Core Area
3 ACES PROJECT – Central Core Area TSX.V:GPY -15-
Slide 16: 3 Aces Project
3 ACES PROJECT Shear Hosted Orogenic Vein System with Bonanza Grade Gold • Potential for multiple high grade deposits over large +225 km2 property with 10.5 sq km Central Core Area defined by highly anomalous gold in soil anomalies • Gold values through 762 meters (2,500 feet) of vertical elevation
Slide 17: 3 Aces Project – Initial Drill Results – Spades Zone
3 ACES PROJECT– Initial Drill Results – Spades Zone(11) Drilled True Hole ID* From (m) To (m) Width (m) Width (m)2 Au g/t3 3A16-032 16.76 27.43 10.67 7.54 32.86 including 16.76 24.38 7.62 5.39 45.18 and 71.63 76.20 4.57 3.23 10.04 3A16-036 10.57 14.38 3.81 3.12 13.18 3A16-037 7.62 16.00 8.38 8.09 4.
Slide 18: 3 Aces Project – Initial Drill Sections – Spades Zone
3 ACES PROJECT– Initial Drill Sections – Spades Zone(11) Sections A & C TSX.V:GPY -18-
Slide 19: The Discovery Process
The Discovery Process Systematic exploration focused on advancing a large high-grade gold district Infrastructure Soil Sampling Trenching Geologic Mapping Airborne Geophysics Year round road access (18 anomalies to date) Discovery of Gold Bearing Quartz Veins Drill Testing of New Veins Bulk Sample o
Slide 20: 3 Aces Project – 2016 Work Completed
3 ACES PROJECT- 2016 Work Completed Soil Geochemical & Geophysical Surveys 2013 • Approximately 25 km2 of grid soil survey was completed in 2013 highlighting more than 10 km2 of significant gold-in-soil anomalies providing the basis for Golden Predator’s expansive exploration program • In addition,
Slide 21: 3 Aces Project – 2016 Work Completed
3 ACES PROJECT- 2016 Work Completed Improved Year-Round Infrastructure and Road Access • Installed 90 foot bridge; winterized and expanded 3 Aces camp • Completed 8 km of access roads to Spades, Clubs and Hearts Zones in Central Core Area • Acquired Class IV Mining Land Use Permit for expanded explo
Slide 22: 3 Aces Project – Discoveries
3 ACES PROJECT– Discoveries Central Core Area: CLUBS ZONE Queen of Clubs: • New discovery of mineralized quartz veins from trenching • Channel and composite grab sample results include 67.1, 91.1, and 111.0 g/t Gold(10) Nine of Clubs: • New discovery of multiple veins made through trenching • Panel
Slide 23: 3 Aces Project – Discoveries (cont'd)
3 ACES PROJECT– Discoveries (cont’d) Central Core Area: SPADES ZONE Ace of Spades: • Initial 2016 drilling in 28 of 31 RC drill holes included: • 11.43m of 31.82 g/t Gold from a depth of 12.8m and 10.36m of 14.30 g/t Gold from depth of 10.0m(4) • Multiple gold bearing veins Jack of Spades: • New dis
Slide 24: 3 Aces Project – Winter 2016 Drill Program
3 ACES PROJECT– Winter 2016 Drill Program Reverse Circulation and Core Drilling • Commenced October 2016; Completed 4,315m as of December 2016 • Close spaced large sample size drilling required due to coarse gold nugget effect • 80-85% of drilling - 5.5 inch RC with sample interval of 2.5 feet; enti
Slide 25: 3 Aces Project – Bulk Sample Program
3 ACES PROJECT – Bulk Sample Program Continuing Bulk Sample Program • Bulk sample gold recovery in progress, gravity recovery in line with previous metallurgical testing by SGS which indicated gravity gold recoveries of approximately 80%(7) • Secondary recovery could boost overall recovery to 93.5 t
Slide 26: 3 Aces Project – 2017 Work Plan
3 ACES PROJECT – 2017 Work Plan • 2017 drill budget of $ 4,500,000 • Additional soil sampling to be conducted in 2017; road access, trenching and follow up drilling to be conducted on newly identified anomalies from 2016 • Additional trenching planned to expose additional veins & road work to expand
Slide 27: Investment Highlights
Investment Highlights • Systematically exploring the 3 Aces with a fully-funded exploration budget • 2016/2017 Drilling program underway to follow-up on high-grade gold discoveries • Seeking a joint venture partner to advance the Brewery Creek project • Exceptional shareholder base and strong treasu
Slide 28: Endnotes
Endnotes 1) NI 43-101 Technical Report on Preliminary Economic Assessment for the Brewery Creek Property, Yukon Territory, Canada, Tetra-Tech EBA dated November 19, 2014 and filed on SEDAR. 2) Golden Predator News Release October 12, 2010 3) Golden Predator News Release dated October 8, 2012 4) Gold
Slide 29: Contact
555 – 701 W. Georgia Street Vancouver, BC Canada V7Y 1G5 604-260-5029 TSXV:GPY OTCQX:NTGSF info@goldenpredator.com 3 Aces Project Night Drill Program
Golden Predator Mining — Investor Presentation (January 2017) on 6ix