Yancoal Australia Ltd. · ASX:YAL

Yancoal Australia — Corporate Update (November 2016)

34 slides from Yancoal Australia's corporate update, November 2016

  1. Slide 1: HVOCCC Presentation - November 2016, Appendix D

    Hunter Valley Operations South - Modification 5 — Environmental Assessment | Main Report and Appendices A – D HVOCCC PRESENTATION - NOVEMBER 2016 Appendix D www.emmconsulting.com.au

  2. Slide 2: Appendix D - HVOCCC Presentation November 2016

    Hunter Valley Operations South - Modification 5 — Environmental Assessment | Main Report and Appendices A – D Appendix D ― HVOCCC PRESENTATION - NOVEMBER 2016 D www.emmconsulting.com.au

  3. Slide 3: HVO South Modification 5 Environmental Assessment Report

    HVO South Modification 5 Environmental Assessment Report November 2016

  4. Slide 4: Overview

    2 Overview • A modification is proposed to the Hunter Valley Operations South development consent PA 06_0261. • An Environmental Assessment Report (EAR) that considers the social, environmental and economic impacts and benefits of the proposal is expected to be available for public exhibition early

  5. Slide 5: Timeline

    OJUTLON] Timeline Consultation and prepare Environmental Assessment (EA) Adraft EA is prepared in accordance with the relevant policies. Lodgement of application & EA Coal & Allied will lodge the application with the EA to the Department of Planning and Environment. Public Exhibition of EA The EA wi

  6. Slide 6: Proposed Modification

    4 Proposed Modification • Mining depth extension in Riverview Pit from Vaux to Bayswater seam. • Mining depth extension in South Lemington Pit 2 from Bowfield to Vaux seam. • Increase in maximum height of Cheshunt overburden emplacement from RL155 to 240 m AHD in the northern section only. • Ability

  7. Slide 7: Proposed Modification

    Proposed Modification w E awesviewer ceesHUNT er Overburden Current approved mining depth <—_____ Advancing through “ rview Pit PROPOSED MODIFICATION Current approved mining depth COAI Mine sequencing d NLLIED Hunter Valley Operations South Modification 5

  8. Slide 8: Proposed Modification

    6 Proposed Modification • Mine plan review process that considered avoidance and minimisation of environmental impacts. • No extension of State-approved disturbance footprint. • Micro-relief incorporated into overburden emplacement area. • Overburden height increased to RL240M in Northern Cheshunt.

  9. Slide 9: Proposed Modification Indicative Final Landform

    7 Proposed Modification Indicative Final Landform

  10. Slide 10: Proposed Modification Indicative Final Landform

    8 Proposed Modification Indicative Final Landform

  11. Slide 11: Proposed Modification Indicative Final Landform

    9 Proposed Modification Indicative Final Landform

  12. Slide 12: Proposed Modification Indicative Final Landform

    10 Proposed Modification Indicative Final Landform

  13. Slide 13: Visual Amenity

    11 Visual Amenity • Moderate impacts in the short to medium term to the east until rehabilitation can be completed in nominally Year 2022 (Stage 2). • Approx 700m of the existing rehabilitated face of the emplacement area seen from approx. 2.6km to horizon Shearers Lane at Maison Dieu will be retain

  14. Slide 14: Visual Amenity Mitigation

    12 Visual Amenity Mitigation • The emplacement of overburden has been designed to the northern end of Cheshunt Pit to preserve the viewshed through to the Wollemi National Park. • The current setback distance from Maison Dieu is maintained Final landform behind (approx. 2.6km). ridgeline • Overburde

  15. Slide 15: Visual Amenity Additional Viewshed of Emplacement

    13 Visual Amenity Additional Viewshed of Emplacement

  16. Slide 16: Cheshunt Overburden Emplacement - Build Concept and Management Principles

    Cheshunt Overburden Emplacement – Build Concept and Management Principles To Maison Dieu

  17. Slide 17: Cheshunt Overburden Emplacement - Build Concept and Management Principles

    15 Cheshunt Overburden Emplacement – Build Concept and Management Principles Hauling ramp alignment Material placement First lift in the overburden sequenced in areas emplacement begins with adjacent to ramps to outer edge to provide minimise exposure to truck sound barrier while noise while hauling

  18. Slide 18: Cheshunt Overburden Emplacement - Build Concept and Management Principles

    Cheshunt Overburden Emplacement – Build Concept and Management Principles Second lift in the First lift progresses inwards emplacement begins at after outer protection is outer edge and progresses provided. inwards.

  19. Slide 19: Cheshunt Overburden Emplacement - Build Concept and Management Principles

    Cheshunt Overburden Emplacement – Build Concept and Management Principles Emplacement complete

  20. Slide 20: Visual Amenity Interactive Application

    18 Visual Amenity Interactive Application Following the last HVO CCC, it was agreed to modify the HVO South flyover to show earlier stages plans rather than Stage 4 only.

  21. Slide 21: Noise

    19 Noise Noise and vibration study in accordance with NSW Industrial Noise Policy and Voluntary Land Acquisition and Mitigation Policy (VLAMP) • No additional properties are significantly impacted due to the proposed modification. • Ten properties along Jerrys Plains Road (all east of Jerrys Plains

  22. Slide 22: Noise Mitigation

    20 Noise Mitigation • HVO will progressively attenuate all the haul truck fleet to minimise noise impacts. • Continued operational management measures such as the relocation or shutting down of equipment during adverse weather conditions. • Haul roads to the proposed higher emplacement area to be co

  23. Slide 23: Noise Services Road Closure

    21 Noise Services Road Closure Noise

  24. Slide 24: Air Quality

    22 Air Quality Air quality and greenhouse gas assessment in accordance with NSW Approved Method and Voluntary Land Acquisition and Mitigation Policy. • Similar air quality conditions modelled for Maison Dieu and Jerrys Plains as what is already approved for the existing operation. The proposal will

  25. Slide 25: Air Quality Mitigation

    23 Air Quality Mitigation Continued implementation of air quality management plan, including: • Use of water carts to manage wheel generated dust. • Altered or reduced operations in periods of high winds / elevated PM10. • Use of lower / more protected dumping locations during adverse conditions. •

  26. Slide 26: Noise and Air Quality modelling

    24 Noise and Air Quality modelling

  27. Slide 27: Groundwater

    25 Groundwater A groundwater assessment was undertaken against the Aquifer Interference Policy including a groundwater model peer reviewed by Dr Frans Kalf. • Groundwater take from Permian, alluvium and surface aquifers within previous predicted peak takes. • No private bores will be affected by >2m

  28. Slide 28: Surface Water

    26 Surface Water A surface water assessment determined: • No extension of State-approved disturbance footprint. • HVO South will not increase the cumulative impacts of salinity within the Hunter River due to continued participation in the HRSTS. • Any water taken from the Hunter River Regulated Wate

  29. Slide 29: Ecology and Cultural Heritage

    27 Ecology and Cultural Heritage • Proposal limited to within existing State-approved disturbance footprint. • No additional impacts to the ecology or heritage features.

  30. Slide 30: Socio-economic

    28 Socio-economic • Sustains mine employment at current levels and generates additional economic activity including $243 million in royalties and $160 million in taxes. • It does not result in social impacts arising from workforce influx, population change and associated impacts on infrastructure.

  31. Slide 31: Feedback

    ovUILOTY Feedback 29

  32. Slide 32: Visual Amenity Rehabilitation progression

    30 Visual Amenity Rehabilitation progression – nominally 2019

  33. Slide 33: Visual Amenity Rehabilitation progression

    31 Visual Amenity Rehabilitation progression – nominally 2022

  34. Slide 34: Slide 34

Yancoal Australia — Corporate Update (November 2016) on 6ix