Slide 1: Unleashing Jaguar: Delivering a new generation of low-carbon nickel supply from Brazil
Unleashing Jaguar: Delivering a new generation of reliable, low- carbon nickel supply from Brazil Darren Gordon, Managing Director

Slide 2: Disclaimer
Disclaimer ● This presentation does not constitute investment advice. Neither this presentation nor the information contained in it constitutes an offer, invitation, solicitation or recommendation in relation to the purchase or sale of shares in any jurisdiction. This presentation does not take into

Slide 3: Centaurus Metals Investment Overview
Centaurus Metals World-class Resource with significant growth Investment overview potential Developing a globally significant nickel Extremely low carbon sulphide asset footprint Favourable Targeting production of infrastructure-rich +20ktpa of nickel over location in Brazil’s +15 year mine life Car

Slide 4: Corporate Summary
Corporate Summary 495m A$148m Centaurus is developing one of the world’s premier new near-surface nickel sulphide projects, with class-leading GHG emission credentials. Shares on issue Market cap at A$0.30 66.3% A$34.7m Highly Experienced Board Top-20 holders Cash (31/12/23) 5.8m Broker Coverage Unl

Slide 5: Western Gigafactory Development Pipeline
Western Gigafactory Development Pipeline Over ~2,350GWh of capacity growth in the pipeline with ~1,950GWh Ni-based North American & European Gigafactory Pipeline (1) Gigafactory Capacity (GWh) (2) Europe North America 3,000 N O 2,500 L L N N 2,000 N N O N 1,500 N N N L N N O N N N 1,000 L N N L N N

Slide 6: GHG Emissions – Forecast to be a Class-leader
GHG Emissions – Forecast to be a Class-leader Powered by renewables & high-grade nickel sulphides GHG Intensity Curve – Nickel (E1 GHG Emission Metrics®) Jaguar Nickel Sulphate Project 7.27t of CO2/t of NiEq Jaguar is currently net sequester of Carbon Life-of-mine CO2 footprint forecast to be lower

Slide 7: Brazil
Brazil Responsible Mining in an emission-friendly jurisdiction STRATEGIC MINERALS POLICY ENVIRONMENTAL ROAD MAP TO MINING Recently-created to assist in Approval Process clearly defined Well-Established Mining Regulation approval process for strategic with Jaguar EIA Approved and and Tenement System

Slide 8: Brazil's Carajás Mineral Province
Brazil’s Carajás Mineral Province A Tier-1 global mining province The Carajás contains one of the world’s largest known concentrations of large-tonnage world-class mineral deposits 8

Slide 9: Brazil's Carajás Mineral Province: Infrastructure and logistics
Brazil’s Carajás Mineral Province Outstanding infrastructure and logistics ● High-Voltage (230kV) grid power within 40km of Project ● Brazil’s national power grid runs on +80% renewables ● Low cost, clean power ● Project located 40km north of Tucumã and Ourilândia do Norte (pop +70,000) – mining com

Slide 10: Jaguar Project – World-Class Resource
Jaguar Project – World-Class Resource Large-Tonnage, High-Quality JORC MRE: 109.2Mt @ 0.87% Ni for 948,900 tonnes of contained nickel ● Measured & Indicated 86.6Mt @ 0.85% Ni for 737,800t Ni metal - 83% of Global MRE ● +500kt of M&I Ni metal within 200m of surface ● Over 50km of diamond drilling com

Slide 11: Jaguar Project – High-grade nickel sulphides from top to bottom
Jaguar Project – World-Class Resource High-grade nickel sulphides from top to bottom 1000m 800m Jaguar South Onça Preta 20.4m @ 3.94 % Ni 11

Slide 12: Jaguar Project – A unique deposit with sustainable growth
Jaguar Project – World-Class Resource A unique deposit with sustainable growth One of the world's largest high-grade nickel sulphide orebodies ● 165,000t of Ni metal added to the MRE per year over the last three years ● Over 50,000m of successful drilling in 2023 that is not yet included in MRE ● Ta

Slide 13: Jaguar Project – Processing Circuit
Jaguar Project – Processing Circuit A traditional flotation plant 13

Slide 14: Jaguar Project – Feasibility Study
Jaguar Project – Feasibility Study Feasibility Study Nearing Completion Anticipated low operating cost project Mining ● Jaguar pits coalescing into one – strike extent of +3km, up to 1km width and depths that extend to over 300m ● Mining contractor proposals received with costings used for pit optim

Slide 15: Jaguar Project - Approvals & Stakeholder Engagement
Jaguar Project - Approvals & Stakeholder Engagement Environmental Approvals On-Track ● Preliminary Licence (LP) ISSUED ● Mining Lease Application (PAE) APPROVED ● Preliminary (LP) and Installation Licences (LI) for 230kV power line APPROVED ● Issue of Mining Lease only conditional on the issue of th

Slide 16: Jaguar Project Targeted Development Timeline
Jaguar Project Targeted Development Timeline 2027 – First Production 2025/2026 – Construction Phase H1/2025 – Final Investment Decision - FID Q2/2024 – Definitive Feasibility Study Q1/2024 – Preliminary Licence (LP) Issued Q1/2024 – Mining Lease Application Approved Q2/2023 – 100% Offtake Rights Sec

Slide 17: Boi Novo Project – Copper-Gold Exploration
Boi Novo Project – Copper-Gold Exploration The Carajás is the world’s premier IOCG address With Jaguar moving into pre-development, our exploration team has shifted focus to building a pipeline of organic and inorganic growth opportunities in strategic minerals in Brazil ● Only 30km from Parauapebas

Slide 18: Key Investment Takeaways
Centaurus Metals Key Investment Takeaways ● Focus on strategic minerals in Brazil ● Jaguar Nickel Sulphide Project ● Extremely low carbon footprint ● Favourable infrastructure-rich location ● Tier-1 JORC Resource, long-life project ● Anticipated strong returns and cash flow generation ● Horizon II B

Slide 19: Unleashing Jaguar
Unleashing Jaguar: Delivering a new generation of reliable, low- carbon nickel supply from Brazil Authorised for release by Darren Gordon – Managing Director +61 8 6424 8420 : office@centaurus.com.au : Centaurus Metals : @CentaurusMetals

Slide 20: November 2022 JORC MRE
Centaurus November 2022 JORC MRE Grade Contained Metal Deposit Classification Mt Ni % Cu % Co ppm Zn % Ni Cu Co Zn Indicated 28.5 0.87 0.05 199 0.13 247,800 13,500 5,700 37,400 Jaguar South Inferred 7.3 1.08 0.06 258 0.09 79,100 4,800 1,900 6,500 Total 35.8 0.91 0.05 211 0.12 327,000 18,000 7,600 44

Slide 21: Data and references for comparison of global nickel sulphide deposits
Centaurus Data and references for comparison of pre-mined resources of global nickel sulphide deposits and camps Pre-Mined Resource MI&I Ni Metal Camp / Deposit Country Deposit Type Resource Date Mt Ore % Ni Mt Norilsk (Talnakh Camp) Russian Federation Low-MgO NiS 31-Dec-19 2,433 1.02 24.7 Sudbury C
Source: company website
More decks from Centaurus Metals Limited
Australia Metals & Mining Conference 202624 slides · Nov 13, 2026
Investor Presentation (September 2026)21 slides · Sep 9, 2026
Diggers & Dealers 202621 slides · Aug 3, 2026
Rule Symposium on Natural Resource Investing 202640 slides · July 2026
Shareholder Meeting (May 2026)44 slides · May 28, 2026
Shareholder Meeting (May 2026)41 slides · May 28, 2026