Slide 1: CIBC Institutional Investor Conference
CIBC Institutional Investor Conference Whistler, BC Brian Vaasjo, President & CEO January 24, 2013
Slide 2: Capital Power's strategy creates value throughout business cycle
Capital Power’s strategy creates value throughout business cycle Independent power producer (IPP) strategy consistent since IPO Market We develop, acquire and focus operate larger facilities, Balance of Consistent contracted maintaining discipline on access to geography, technology and and low cos
Slide 3: Fleet aligned with business strategy in 2012
Fleet aligned with business strategy in 2012 Commission 292 MW from two wind projects on time and under budgets Quality Wind - COD Nov/12 and ~10% under budget Halkirk - COD Dec/12 and ~3% under budget Rationalized fleet and sharpened focus Divested small hydro facilities Announced major expan
Slide 4: Alberta market
Alberta market Positive long term supply dynamics Projected reserve margin signals Forecast spark spreads the need for new capacity in the above historical average 2017-2020 timeframe AB market design expected to continue to provide timely pricing signals for the addition of new supply Source: AESO
Slide 5: Shepard Energy Centre
Shepard Energy Centre Excellent fit with our strategy and will strengthen our position in Alberta Provides stable cash flows 20-year tolling agreement on 50% of owned capacity with ENMAX Additional 25% contracted for 2015-17 which increases cash flow certainty during an expected period of low po
Slide 6: Capital Power Energy Centre to be built to meet Alberta's power needs
Capital Power Energy Centre to be built to meet Alberta’s power needs Expands our market share in the attractive Alberta market Working with General Electric in the development of the project, and would utilize GE’s latest gas turbine technology • Looking to partner with 3rd party in the developme
Slide 7: We will own the best fleet in the fastest growing power market in North America
We will own the best fleet in the fastest growing power market in North America Expansion plans will increase our Alberta portfolio to ~3,100 MW 3,000 Best peaking responsiveness 2,500 Best coal reliability Lowest environmental 2,000 (MW) impact and lowest cost 1,500 Most competitive natural
Slide 8: Modern fleet
Modern fleet Helps keep availability high and reduces risk of unplanned outages Average weighted facility age of the current fleet is 12.1 years(1) 2 new wind projects (195 MW) begin commercial operations in 2013 - 2014 CBEC 3 Facility age CBEC 2 Remaining life CBEC 1 Island Generation Gas Joffr
Slide 9: Balanced portfolio of merchant and contracted generation
Balanced portfolio of merchant and contracted generation(1) Today - 2012 Year-end 2015E 15 facilities (3,603 MW) 17 facilities (4,048 MW(2)) • 43% capacity contracted • 48% capacity contracted 4% 3% 13% 16% 29% 26% 26% 29% 28% 26% AB commercial US Northeast commercial Mid-Atlantic contracted AB cont
Slide 10: Investor Relations Contacts
Investor Relations Contacts Randy Mah Chris Williams Senior Manager Senior Analyst (780) 392-5305 (780) 392-5105 rmah@capitalpower.com cwilliams@capitalpower.com