Nine Mile Metals Ltd. · CSE:NINE
Nine Mile Metals — Investor Presentation (September 2026)
21 slides from Nine Mile Metals's investor presentation, Sep 2, 2026
Slide 1: Unlocking New Brunswick's Historic Critical Minerals Camp
HIGH-GRADE VMS DISCOVERY · BATHURST MINING CAMP · NEW BRUNSWICK, CANADA Unlocking New Brunswick's Historic Critical Minerals Camp Using Modern Data, AI-Driven Targeting & Advanced Exploration Technologies Positioned at the intersection of copper, critical minerals, and the infrastructure buildout of
Slide 2: Legal Disclaimer
Legal Disclaimer This material includes “forward-looking” statements or information within the meaning of Canadian securities legislation and the missing expected timelines, and the fact that the Company may not be able to identify additional mineral properties for United States Private Securities L
Slide 3: The Camp Is Proven. The Technology Is New. The Results Are In.
The Camp Is Proven. The Technology Is New. The Results Are In. WH Y N I N E M I L E, WH Y N O W 3.49% CuEq 10.12% Cu 7 Targets New high-grade lens at a past-producing copper mine — Highest-grade copper ever drilled in the Bathurst Mining Modern AI-driven surveys defined seven high-conviction drill t
Slide 4: Company Highlights
Company Highlights 2022 2022–23 2023 2024 2024 FALL 2025 2026 NOW 1 2 3 4 5 6 7 DISCOVERY: PLATFORM: TECHNOLOGY EDGE: WEDGE PHASE 1: PERMITTING: WEDGE PHASE 2: PHASE 3 RESULTS: NOW: Nine Mile Brook 136 km² secured EarthEx & Apex deployed Eastern extension NBDEM approval NEW high-grade Cu lens Certif
Slide 5: Every Megawatt Of AI Runs On Copper
Every Megawatt Of AI Runs On Copper T H E GAP · DEM AN D AGAI N S T S U P P L Y T O 20 40 T H E BU I L DO U T I S AL R EADY H ER E One AI campus now uses the power of 1.5 million homes Elon Musk is building Colossus in Memphis — the world's largest AI supercomputer site, roughly 2 GW, more than one
Slide 6: New Brunswick Is Open — And The Majors Are Arriving
New Brunswick Is Open — And The Majors Are Arriving T H E P O L I C Y S H I FT — 20 26 New Mining Act Comprehensive Minerals Strategy A 78-page bill tabled May 13, 2026 to replace the Mining Act of 1985. Released March 2026, one-stop permitting. Streamlined approvals, one impact assessment. Source:
Slide 7: Bathurst Mining Camp — One Of The World's Great VMS Districts
Bathurst Mining Camp — One Of The World's Great VMS Districts 49 Years 45 Deposits 180+ Mt ~70 % 1952: Airborne EM found Brunswick No. 6 and launched the camp. Brunswick No. 12 in continuous production, 1964–2013 — one Known massive sulphide deposits Ore produced from 12 of the largest underground b
Slide 8: Seeing What 70 Years Of Exploration Couldn't
Seeing What 70 Years Of Exploration Couldn't H O W WE FI N D WH AT 'S H I DDEN , I N P L AI N EN GL I S H 1 2 3 4 5 Re-read the old data Fly it with drones Light up the sulphides Model the target in 3D Aim the drill The full historic record for the UAV drone surveys at a TDEM at surface, BHEM down t
Slide 9: Four Projects, One District — 136 km² In The Heart Of The Camp
Four Projects, One District — 136 km² In The Heart Of The Camp 136 km² 624 Claims 4 Projects Consolidated position surrounding the historic producers of the world's third-largest VMS camp. THE WEDGE 10,000M PHASE 3 — DRILLING NOW 35.83 km² · 164 claims Past-producing copper mine. New high-grade lens
Slide 10: They Mined 1.5 Million Tonnes. They Never Found The Bottom.
They Mined 1.5 Million Tonnes. They Never Found The Bottom. Past-producer credentials — Cominco, approximately 1.5 Mt at 2.88% Cu, mined 1962–68. Every modern phase has extended the system: open at depth, along strike, and on the western flank. Three phases drilled — every one has extended the syste
Slide 11: The Wedge — Every Phase Has Extended The Deposit.
The Wedge — Every Phase Has Extended The Deposit. PHASE 1 · 2024 — CERTIFIED ASSAYS ✓ WD-24-07: 40.32m @ 1.65% CuEq — incl. 13.12m @ 2.29% CuEq and 5.50m @ 3.25% CuEq PHASE 2 · FALL 2025 — CERTIFIED ASSAYS ✓ WD-25-01: 22.65m @ 3.83% CuEq — and 17.65m @ 4.33% CuEq · new Au-Ag zone 13.00m @ 1.21 g/t A
Slide 12: The Wedge — What 10,000 Meters Buys.
The Wedge — What 10,000 Meters Buys. FO U R H U N T S , O N E P R O GR AM : 1 Build Out The Wedge Mine Increase the mineralized footprint and improve the economics. 2 Chase The New Lens West WD-25-2B ended in 4.47% Cu; the hole stopped, the mineralization didn't 3 Go Deeper Than The Mine Ever Did Th
Slide 13: The Highest-Grade Copper Hole In The Camp's History.
The Highest-Grade Copper Hole In The Camp's History. Nine Mile Brook — 10.12% Cu over 15.10m (NM220004, NI 43-101), with internal samples to 18.55% Cu — in a camp mined for 65 years. 50.04 km2 229 claims NEXT DRILL PROGRAM IN DEVELOPMENT — APEX DEFINING TARGETS See Technical Notes. © 2 0 2 6 N I N E
Slide 14: Nine Mile Brook — The Highest-grade Copper Ever Drilled In The Camp.
Nine Mile Brook — The Highest-grade Copper Ever Drilled In The Camp. C ER T I FI ED DR I L L AS S AY S — N I 43 -10 1 10.12% Cu Hole Width Cu % Pb % Zn % Ag g/t Au g/t over 15.10m NM220003 10.45m 6.92 2.52 5.60 179.28 1.33 · NM220004 · internal 1m samples to 18.55% Cu NM220004 ★ 15.10m 10.12 1.41 1.
Slide 15: California Lake — Proven At Depth. The Source Is The Target.
California Lake — Proven At Depth. The Source Is The Target. 1.5 km Conductive trend defined from reprocessed geophysics, running south to Target #6 up to 18.45m $40,000 Drill intersection widths NBJMAP exploration grant from the Province of New Brunswick WH AT T H E DR I L L I N G P R O VED: The 20
Slide 16: Canoe Landing Lake — The Proof Is Next Door.
Canoe Landing Lake — The Proof Is Next Door. Nine Mile owns the ground surrounding the Canoe Landing Lake Deposit — and it sits between our Wedge and California Lake projects. 14.64 km² 100% owned across 67 claims, East and West option exercised early, April 2024 THE POSITION: Nine known mineral occ
Slide 17: Active Programs — 10,000 Meters In The Ground, Results Coming.
Active Programs — 10,000 Meters In The Ground, Results Coming. STATUS PROGRAM DETAIL Wedge Phase 3 — 10,000m The largest program in Company history. Testing seven modelled targets at 300–450m along the 6.5 km Wedge VMS Trend, the new high- ACTIVE NOW The Wedge VMS Trend grade lens on the western fla
Slide 18: Management & Technical Team.
Management & Technical Team. L EADER S H I P Patrick J. Cruickshank, MBA Gary Lohman, B.Sc., P.Geo. Jonathan Holmes, B.A. Kevin Hicks, M.Sc. CEO & Director VP Exploration & Director President & Director Independent Director MBA, Schulich School of Business. Over 20 years Forty years as an exploratio
Slide 19: Share Structure.
Share Structure. Share Structure Issued and Outstanding 70.6% As at 31 August 2026 Issued and Outstanding 194,956,267 Warrants 63,497,064 Options 17,500,000 Warrants 23.0% Fully Diluted 275,953,331 Cash $4,917,772 Options 6.3% Share figures as at 31 August 2026. Cash at 30 June 2026. All figures in
Slide 20: Technical Notes.
Technical Notes. NOTES ON DRILL RESULTS HISTORICAL INFORMATION WD-26-09 and WD-26-10 intervals are reported as true widths. All other widths are drilled core lengths and true widths are Cominco production figures for the Wedge — approximately 1.5 Mt at 2.88% Cu, mined 1962–1968 — are historical, are
Slide 21: Four VMS Projects. One District. One Legendary Camp.
Four VMS Projects. One District. One Legendary Camp. The Canadian Securities Exchange has not reviewed and does not accept responsibility for the adequacy or accuracy of the contents of this presentation. Multiple projects. Multiple catalysts. Stay tuned. 2026 CORPORATE PRESENTATION Nine Mile Metals
Nine Mile Metals — Investor Presentation (September 2026) on 6ix