Pure Gold Mining — Investor Presentation (February 2017)
29 slides from Pure Gold Mining's investor presentation, February 2017
Slide 1: February 2017
February 2017 PGM:TSX-V
Slide 2: Forward Looking Statement
FORWARD LOOKING STATEMENT Cautionary Statement on Forward-Looking Information & Statements This presentation contains certain forward-looking information and statements which may not be based on fact, including without limitation, statements regarding the Company’s expectations in respect of its fut
Slide 3: A Fresh Look at a Historic Producer
Pure Gold Mining A FRESH LOOK AT A HISTORIC PRODUCER Red Lake, Ontario, Canada – an established mining district with more JURISDICTION than 28 million ounces of high grade gold produced to date (1) One of the highest grade undeveloped deposits in the world (2) with HIGH GRADE currently defined resou
Slide 4: Direct Red Lake Experience
Pure Gold Mining DIRECT RED LAKE EXPERIENCE Management & Technical Team Board of Directors Darin Labrenz, President, CEO & Director Graeme Currie, Chairman • Former VP Business Development, Terrane Metals Corp. • Former Director, Investment Banking at Canaccord Genuity • Former Chief Geologist, Plac
Slide 5: Capital Structure
Pure Gold Mining CAPITAL STRUCTURE Capital Structure (as at February 22, 2017) Key Shareholders (2) Shares Outstanding(1) 190.2 million Management & Directors 4.1% Options Outstanding 13.0 million Strategic Shareholders 27.3% Weighted average exercise price $0.34 AngloGold Ashanti 10.9% Evanachan Lt
Slide 6: 2017 Focus on Growth
Pure Gold Mining 2017 FOCUS ON GROWTH 70,000m of drilling in fully funded Phase I exploration program Aggressive Resource Expansion Close to Infrastructure Build resource and improve PEA metrics Four diamond drill rigs active on property, program focused on resource expansion in McVeigh, Austin
Slide 7: Red Lake Mining District
Red Lake Mining District HIGHEST GRADE GOLD BELT IN CANADA +28 million oz high-grade gold mined in Red Lake to date (1) • Established, mining-friendly jurisdiction with +85 year history • 1.3 million ounces of gold produced in the district at a grade of 19.5 g/t from 2013 to 2015 (2) • 45 km2 contig
Slide 8: Focused on Discovery in a Proven District
Madsen Gold Project FOCUSED ON DISCOVERY IN A PROVEN DISTRICT 3rd largest 2.5 million oz HISTORIC PRODUCTION (1) 9.9 g/t LAND PACKAGE IN RED LAKE AVERAGE HISTORIC GRADE (1) • Permitted mill and tailings management facility • Second largest historic producer in Red Lake, with continuous historical pr
Slide 9: Focused on Discovery in a Proven District
Madsen Gold Project FOCUSED ON DISCOVERY IN A PROVEN DISTRICT Russet South Tailings Madsen Madsen #2 Shaft Management McVeigh Portal Facility and Decline McVeigh Austin Mill 8
Slide 10: +$200 Million of Existing Infrastructure
Madsen Mine & Mill +$200 MILLION OF EXISTING INFRASTRUCTURE Portal to underground ramp Interior of Madsen mill 1,275 metre deep shaft Permitted tailings facility & 27 levels of workings Madsen mill 9
Slide 11: Modern Science Driving Exploration
Madsen Gold Project MODERN SCIENCE DRIVING EXPLORATION • Multiple highly prospective targets currently being drill tested 10
Slide 12: Multiple Gold Zones Open for Expansion
Madsen Target Settings MULTIPLE GOLD ZONES OPEN FOR EXPANSION Note: Mine workings and geologic contacts in this image are schematic. The mineral resource estimate reported herein for the Madsen Gold Project is set out in the NI 43-101 technical report “Technical Report on the Preliminary Economic As
Slide 13: Austin – McVeigh Setting
Madsen Mine Geology AUSTIN – MCVEIGH SETTING McVeigh • Limited near-surface production with a maximum historic mining depth of 230 metres • Recurrent south-plunging mineralized system • Open for expansion – focus of current drill program Austin • Hanging wall horizon mined from surface to a depth of
Slide 14: Targeting High Grade Gold Shoots at McVeigh
Madsen 2017 Drill Program TARGETING HIGH GRADE GOLD SHOOTS AT MCVEIGH 13.5 g/t Au 4.3 m 11.0 g/t Au 4.2 m 50.2 g/t Au 4.0 m 67.5 g/t Au 1.1 m McVeigh Central 24.3 g/t Au 1.5 m 17.7 g/t Au 2.0 m Note: See Pure Gold news releases dated March 1, 2016, April 4, 2016, May 17, 2016, June 14, 2016, July 14
Slide 15: Austin Long Section – A3 Target
Madsen 2017 Drill Program AUSTIN LONG SECTION – A3 TARGET • New high grade gold target located within the Austin Horizon, interpreted to be another sub-parallel gold bearing structure that is open in all directions(1) 16.7 g/t Au 1.0 m 25.4 g/t Au 8.0 m COMPOSITE LONG SECTION Austin A3 Target 0m 500
Slide 16: Targeting High Grade Gold Mineralization
Madsen 2017 Drill Program TARGETING HIGH GRADE GOLD MINERALIZATION Resource Growth Close to Mine Infrastructure • Geologic setting genetically and spatially links mineralization in multiple settings • A3 discovery is a direction application of modern exploration geoscience to a data rich project • M
Slide 17: High Grade in Satellite Exploration Targets
Madsen Satellite Zones HIGH GRADE IN SATELLITE EXPLORATION TARGETS Advance Satellite Targets with High Grades 16
Slide 18: Russet South: Potential for Near Surface Resource
Russet South POTENTIAL FOR NEAR SURFACE RESOURCE • High grade gold located ~1.5 km west of the McVeigh horizon and existing infrastructure 8.2 g/t Au over 11.0 m in PG15-028 39.1 g/t Au over 2.9 m in PG15-031 22.1 g/t Au over 3.5 m in PG16-069 76.0 g/t Au over 2.1 m in PG16-233 (1) (1) See Pure Gold
Slide 19: +5km Mineralized System
Madsen Property +5km MINERALIZED SYSTEM Fork McVeigh Starratt Austin Large Target Potential • Austin open down plunge - hole AD-11-01 returns 14.3 g/t gold over 2.0m at 2.1km vertical depth • McVeigh open for expansion – drilling expanding gold mineralization outside of current resource • Starratt d
Slide 20: Preliminary Economic Assessment
Madsen Gold Project PRELIMINARY ECONOMIC ASSESSMENT • Initial PEA (April 2016) shows total gold 2016 PEA (1) production of ~260,000 ounces over a 6.5 year mine life at an average diluted head grade of Pre-Tax / After-Tax IRR 8.3 g/t gold (1) 74% / 62% Positive base case assessment of developing Pr
Slide 21: Pure Opportunity
Pure Gold Mining PURE OPPORTUNITY High grade deposit with a long mining history Large mineral system open for expansion New science has significantly increased understanding of deposit geology providing a framework for exploration success +$200 million of infrastructure in-place at Madsen(1) Attract
Slide 22: Appendix
APPENDIX pureggld , 21
Slide 23: Starratt
Madsen Satellite Zones STARRATT • Regional target associated with the historic Starratt Olsen Mine Located ~2.2km south of the Madsen No. 2 Shaft • Open down plunge and along strike, in an analogous geological setting to the McVeigh, South Austin and Austin horizons • Starratt Olsen Mine produced
Slide 24: Current Mineral Resource
Madsen Gold Project CURRENT MINERAL RESOURCE Grade Grade Contained Gold Resource Class Zone Tonnes g/t Au oz/t oz Au Indicated Austin 1,677,000 7.92 0.23 427,000 South Austin 850,000 9.32 0.27 254,000 McVeigh 374,000 9.59 0.28 115,000 8 Zone 335,000 12.21 0.36 132,000 Total Indicated 3,236,000 8.93
Slide 25: 2016 PEA – Additional Details
Madsen Gold Project 2016 PEA – ADDITIONAL DETAILS • Underground mining via mechanized cut and fill, PEA SUMMARY PARAMETERS (1) shrinkage, and long-hole mining methods Gold Price US$1,175/oz • $20.1 million in pre-production capital costs over a Exchange Rate (US$ to C$) 0.80 12-month period Total Re
Slide 26: Benchmarking vs. Peers – Resource Grade
Pure Gold Mining BENCHMARKING VS. PEERS – RESOURCE GRADE M&I Resource Grade 12.0 11.61 10.0 M&I Resource Grade (g/t Au) 8.93 8.88 8.42 8.0 5.87 6.0 4.91 4.09 4.0 3.50 2.66 1.63 2.0 0.82 0.0 (1) Dalradian Pure Gold Integra Osisko Sabina Gold Auryn Eastmain Condor Gold ATAC Midas Gold Ascot Inferred R
Slide 27: Benchmarking vs. Peers – Market Cap & P/NAV
Pure Gold Mining BENCHMARKING VS. PEERS – MARKET CAP & P/NAV Price / NAV 0.90x 0.90x 0.81x 0.73x 0.62x 0.59x 0.60x 0.54x Price / NAV 0.37x 0.29x 0.30x 0.00x Osisko Sabina Gold Integra Pure Gold Dalradian Midas Gold Eastmain ATAC Market Capitalization $617 $600 $500 Market Cap (C$mm) $393 $400 $346 $
Slide 28: One of the World's Highest Grade Gold Projects
Madsen Gold Project ONE OF THE WORLD’S HIGHEST GRADE GOLD PROJECTS Select High Grade Gold Assets Hope Bay (TMAC) Back River (Sabina) Brucejack (VOK) Fire Creek Madsen Red Lake Brucejack (VOK) Cocheneur (Pretium) Jerusalem Zaruma Fire Creek & Midas Lamaque (Integra) (Klondex) Madsen Cocheneur & Red G
Slide 29: Corporate Inquiries
Corporate Inquiries: Darin Labrenz President & CEO t: 604.646.8000 info@puregoldmining.ca PGM:TSX-V 1900 – 1055 West Hastings Street Vancouver, BC V6E 2E9 www.puregoldmining.ca
Pure Gold Mining — Investor Presentation (February 2017) on 6ix