Vault Minerals Limited · ASX:VAU

Vault Minerals — Red 5 — RIU Sydney Resources Round-up 2009

31 slides from Vault Minerals's conference presentation, May 14, 2009

  1. Slide 1: Siana Gold Project - Philippines

    For personal use only RED 5 Limited Siana Gold Project - Philippines RIU Sydney Resources Round-up 13 May 2009 RED5 Limited

  2. Slide 2: Red 5 - at a glance

    Red 5 - at a glance…. For personal use only RED – ASX (07 May): 7.5 cents Market Cap (07 May): $49.4m Issued Shares: 659.2m Cash at 31 Mar 09: A$23.9m Enterprise value US$19 (per Resource oz) Largest Shareholders: Mathews Capital 19.5% AngloGold Ashanti 10.2% R Stanley 8.0% RED5 Limited

  3. Slide 3: Momentum increase

    Momentum increase… For personal use only Last 3 months: ƒ Reserves doubled with underground resource upgrade ƒ Positive feasibility study complete, Board review in progress ƒ Environmental Compliance Certificate issued ƒ Mapawa MPSA granted – satellite Resource potential … business de-risked RED5 Li

  4. Slide 4: Probable Ore Reserves

    Probable Ore Reserves For personal use only Stockpile Open Pit Underground Total (Long term mine plan) Tonnes 0.08 3.10 3.36 6.55 Au g/t 1.33 3.42 5.83 4.6 Ag g/t 10.67 8.71 9.12 8.9 Ounces Au 3,549 341,000 630,000 975,000 Ounces Ag 28,000 870,000 986,000 1,885,000 RED5 Limited

  5. Slide 5: Resource database

    Resource database… For personal use only ƒ 88 diamond drillholes for 37,480 metres ƒ 14,600 specific gravity measurements within the Resource models (ore and waste) ƒ >15,000 geotechnical measurements ƒ 28,500 samples assayed (seven elements) RED5 Limited

  6. Slide 6: Resource still open

    Resource still open… For personal use only RED5 Limited

  7. Slide 7: Highly prospective location

    Highly prospective location For personal use only ƒ 100 million oz equivalent potential in Surigao del Norte ƒ Excellent local infrastructure ƒ Strong Community support (history of mining) ƒ Strategic land position ƒ Secure form of mining title (Mineral Production Sharing Agreement) RED5 Limited

  8. Slide 8: Feasibility study update

    Feasibility study update… For personal use only ƒ Plant and infrastructure costs updated ƒ Open pit design and costs updated ƒ In country contractors/suppliers used where possible ƒ Modified waste dump design ƒ Tailings dam detailed design ƒ Underground mine design completed - drill and blast and ro

  9. Slide 9: Consultants to the study

    Consultants to the study… For personal use only ƒ Resource estimation - Hellman & Schofield, Cube Consulting, Perth ƒ Geotechnical - Mining One, Melb, Peter O’Bryan & Associates, Perth ƒ Hydrology - Meyer Water & Environmental Solutions, Perth ƒ Open Pit mine design - RSG Global (Coffey Mining), Per

  10. Slide 10: Site layout

    Site layout For personal use only RED5 Limited

  11. Slide 11: Project financials (pre-tax)

    Project financials (pre-tax) For personal use only Base case: ƒ 750,000 tpa ƒ Gold US$800/oz Silver US$10/oz ƒ NPV > US$ 100 million ƒ IRR > 30% RED5 Limited

  12. Slide 12: Fuel price

    Fuel price… For personal use only RED5 Limited

  13. Slide 13: Costs

    Costs For personal use only CAPEX ƒ Cost to first gold reduced from September 2008 estimate (US$73 million) with decreased steel prices, fuel and EPCM costs ƒ March 2009 estimate similar but now includes working capital (US$10 million) OPEX ƒ Life of mine US$350 per ounce cash cost RED5 Limited

  14. Slide 14: Gold recovery

    Gold recovery For personal use only Gravity and CIL leach: • open pit - 85 %, 1.2 kg/t CN • underground LZN - 88 %, 2.2 kg/t CN • underground HZN - 84 %, 2.4 kg/t CN Gravity, Zn flotation, cons and tail leach: • underground HZN – 83.4 %, 2.45 kg/t CN RED5 Limited

  15. Slide 15: Underground mining

    Underground mining For personal use only ƒ Underhand cut and fill (top down) ƒ Road header in ore (more productive in soft ground than conventional drill and blast, with additional benefit of less explosive on site) ƒ Drill and blast for hard material ƒ Paste fill ground support RED5 Limited

  16. Slide 16: Why underhand cut and fill?

    Why underhand cut and fill? For personal use only ƒ Safe workplace for entry style mining ƒ High mining recoveries ƒ Low dilution ƒ Independent of rock break technique RED5 Limited

  17. Slide 17: Underhand cut and fill

    Underhand cut and fill For personal use only RED5 Limited

  18. Slide 18: Underground design parameters

    Underground design parameters For personal use only ƒ Access via a 5m by 5m, 1:7 decline in porphyry and basalt units ƒ Portal located 90 metres above final pit floor ƒ 50 tonne trucks ƒ Level spacing 40m (ramps 20m up 20m down) RED5 Limited

  19. Slide 19: Underground design

    Underground design For personal use only RED5 Limited

  20. Slide 20: Requirements to operate

    Requirements to operate… For personal use only ƒ Environmental Compliance Certificate granted ƒ Feasibility study under review by MGB In preparation: ƒ SDMP – Social Development Management Plan ƒ EPEP – Environmental Protection and Enhancement Programme ƒ FMRDP – Final rehab and decomissioning plan

  21. Slide 21: Strong community support

    Strong community support… For personal use only Clean water project RED5 Limited

  22. Slide 22: ...through health assistance

    ...through health assistance For personal use only RED5 Limited

  23. Slide 23: … welfare

    … welfare For personal use only RED5 Limited

  24. Slide 24: … education programmes

    … education programmes For personal use only RED5 Limited

  25. Slide 25: …and agricultural assistance

    …and agricultural assistance For personal use only RED5 Limited

  26. Slide 26: Implementation

    Implementation For personal use only ƒ Permitting and finance 3rd Qtr 2009 ƒ Plant construction commences 4th Qtr 2009 ƒ Open pit commences 1st Qtr 2010 ƒ First gold production Dec 2010 ƒ Underground portal commences 1st Qtr 2013 ƒ Underground ore production 3rd Qtr 2013 RED5 Limited

  27. Slide 27: Opportunities

    Opportunities For personal use only ƒ Further underground extensions ƒ Mapawa satellite ore ƒ Zinc concentrate production RED5 Limited

  28. Slide 28: MAPAWA Gold Project

    MAPAWA Gold Project For personal use only ƒ Exciting milestone achieved with approval and registration of MPSA 280-2009-XIII ƒ Located 30 km north of Siana ƒ 1,482 hectares, highly prospective for gold and potentially, base metals ƒ Strengthened regional gold exploration portfolio ƒ Gold intersected

  29. Slide 29: LSY prospect

    LSY prospect For personal use only RED5 Limited

  30. Slide 30: Summary

    Summary For personal use only ƒ Technically and economically viable project ƒ 10 year operating life delivering 850,000 recovered ounces of low cost production ƒ Upside with Mapawa licence grant ƒ Community acceptance and environmentally benign ƒ Knowledgeable supportive shareholder base ƒ Financing

  31. Slide 31: Contact details

    Contact details For personal use only ƒ Level 2, 35 Ventnor Avenue ƒ West Perth, Western Australia 6005 ƒ PO Box 1911 West Perth, WA 6872 ƒ Ph: + 61 8 9322 4455 ƒ Fax: + 61 8 9481 5950 ƒ Web Site: www.red5limited.com ƒ Email: info@red5limited.com RED5 Limited