Sandfire Resources Ltd · ASX:SFR

Sandfire Resources — Africa Down Under Conference 2022

26 slides from Sandfire Resources's conference presentation, Aug 31, 2022

  1. Slide 1: Africa Down Under Conference Presentation

    For personal use only Africa Down Under Conference Presentation Karl Simich, CEO and Managing Director 31 August 2022

  2. Slide 2: Important Information and Disclaimer

    For personal use only Important Information and Disclaimer This presentation has been prepared by Sandfire Resources Ltd (Sandfire or the Company) and contains information about Sandfire Key assumptions current at the date of this presentation. The presentation is in summary form, has not been indep

  3. Slide 3: Our Strategy

    For personal use only Our Strategy Execute Sustain and Grow Accelerate Align and Empower Optimise Capital Delivery Our Production Discovery Our People Strategy and Pipeline Engagement Our Values Honesty Respect Collaboration Accountability Performance 3

  4. Slide 4: Where we operate

    For personal use only Where we operate Scale One of the largest copper-focused miners on the ASX Future-facing Producing copper, a critical metal for a low-carbon future Growth Pivoting to new long-life mines in Spain, Botswana and USA Exploration Four world-class mineral provinces Operating Mines D

  5. Slide 5: Sustainable production

    Sustainable production For personal use only From high-quality assets in Tier-1 locations MATSA Copper Operations, Spain Black Butte Copper Project, USA (87%) FY2023G: 60-65kt Cu; 78-83kt Zn LOM Avg Production: 23ktpa Cu Cu Zn Pb Ag Cu Ag Feasibility 1.2Mtpa 8+ years Producing 4.7Mtpa 12 + years Low

  6. Slide 6: A momentous months: key achievements in FY2022

    For personal use only A momentous 12 months Our key achievements in FY2022 In US$ Acquired the Raised A$1.248B Production $922.7M Delivering a major People, culture, world-class equity and $795M growth Sales revenue new copper mine values and MATSA Copper debt FY2022: in Botswana sustainability Oper

  7. Slide 7: Motheo Copper Project

    For personal use only Motheo Copper Project Motheo Copper Mine Exploration • 5.2Mtpa Processing Facility • Motheo Expansion Project • T3 Open Pit Development • Kalahari Copper Belt tenure • A4 Open Pit Development

  8. Slide 8: Supporting our communities

    For personal use only Motheo Supporting our communities Our Motheo community framework pillars Community Health Education Women Empowerment Youth Development Improved outcomes for Encourage attendance in Support equality, Promote training and the physical and mental schools, improve learning inclusi

  9. Slide 9: Building a world-class copper mine

    For personal use only Motheo Copper Project Building a world-class copper mine Development of the Motheo Copper 5.2Mtpa Motheo Expansion Case Sandfire intends to fund the Mine (3.2Mtpa): DFS: development of the Motheo Copper • Proceeding on time with first Mine through a combination of cash Positive

  10. Slide 10: 5.2Mtpa Motheo Expansion

    For personal use only 5.2Mtpa Motheo Expansion Expansion Case DFS Combined Total Ore Reserve for both DFS shows outstanding project Total development capital for the Motheo the A4 Deposit and T3 Deposit: economics from an expanded 5.2Mtpa Copper Project expansion case • 49.6Mt at 1.0% Cu and 14g/t A

  11. Slide 11: 5.2Mtpa Motheo Expansion production profile

    For personal use only 5.2Mtpa Motheo 60,000 1.20 Expansion 50,000 1.00 Copper production ramping up to peak ~55ktpa 40,000 0.80 Tonnes 30,000 0.60 20,000 0.40 10,000 0.20 - - 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 Financial Year T3 Copper Contribution A4 Copper Contribution Mine

  12. Slide 12: Proposed Mine Layout

    For personal use only Motheo Copper Mine Proposed Mine Layout 12

  13. Slide 13: 5.2Mtpa Construction & Development Capital

    For personal use only 70 23.6 400 Motheo Copper Mine 60 350 5.2Mtpa Construction 300 & Development Capital 50 250 40 Millions In US$ Millions 200 30 Development capital estimated at $397.4M 150 (displayed in graph) • Motheo (3.2Mtpa and T3) $325.5M 20 100 • Motheo (5.2Mtpa expansion and A4) $71.9M 1

  14. Slide 14: Motheo Exploration

    For personal use only Motheo Exploration Dominant position in an emerging belt Land holding more than 26,000km2 of the Kalahari Copper Belt • Under explored and globally significant copper terrane • Only 643 holes drilled in 15 years of regional exploration • Regional geophysical data collection to

  15. Slide 15: Motheo Exploration: A1 Dome

    For personal use only Motheo Exploration A1 Dome The next highly prospective exploration target • 19km from the Motheo Processing Facility • Similar structural and lithological setting as T3 and A4 domes • More than 9km strike length of the prospective lower D'Kar formation identified through drilli

  16. Slide 16: Development and Construction Pictorial Update

    For personal use only Motheo Copper Mine Development and Construction Pictorial Update

  17. Slide 17: Development and Construction Pictorial Update: Mine Village

    Motheo Copper Mine Development and Construction Pictorial Update For personal use only Motheo Mine Village • 752 rooms completed and in use • Village buildings all completed • Landscaping planning underway 17

  18. Slide 18: T3 Open Pit Mining Continues

    Motheo Copper Mine Development and Construction Pictorial Update For personal use only T3 Open Pit Mining Continues • AMS pre-strip work on a 24-hour basis • All 4 Excavators - 2 EX1900 and 2 EX2600 operational • Initial fleet of 12 trucks on site and operational • 890,000 BCM total material movemen

  19. Slide 19: TSF under construction

    Motheo Copper Mine Development and Construction Pictorial Update For personal use only TSF under construction TSF under construction • Bulk waste haulage and placement 75% complete • AMS bulk waste North Wall (foreground) • Lining and basin preparation progressing • Basin liner and drainage progress

  20. Slide 20: T3 Deposit Mine Pit area and Dewatering Ponds

    Motheo Copper Mine Development and Construction Pictorial Update For personal use only T3 Deposit Mine Pit area Dewatering Ponds Area • Stage 1 Pit and haul road network • Dewatering pond lining underway • Clearing for temporary water storage pond underway • Haul roads nearing completion 20

  21. Slide 21: Process Plant and Mining Services Area overview

    Motheo Copper Mine Development and Construction Pictorial Update For personal use only Motheo Process Plant area overview Mining Services Area overview • Process Plant with ROM pad in background • AMS Mining workshop foundations advanced • Administration buildings (right of picture) now in use • Cri

  22. Slide 22: Process Plant area and Substation area

    Motheo Copper Mine Development and Construction Pictorial Update For personal use only Motheo Process Plant area Substation area • Primary crusher and ROM wall in foreground • 132/11kV Substation civils and mechanical complete • Final lift of ROM wall back-fill underway • 11kV Switch room in foregro

  23. Slide 23: Primary Crushing, ROM Backfill, Water Service area

    Motheo Copper Mine Development and Construction Pictorial Update For personal use only Primary Crushing ROM Backfill Water Service area • View over partially erected • Upper ROM backfill progressing • Water Service area progressing stockpile feed conveyor 23

  24. Slide 24: Tank and Mechanical install, Grinding

    Motheo Copper Mine Development and Construction Pictorial Update For personal use only Tank and Mechanical install Grinding Grinding • Reagent tanks installed, • SAG Mill operating floor ready • HV MCC under construction mechanical install progressing for Mill installers 24

  25. Slide 25: Key Takeaways

    For personal use only Key Takeaways Strong growth platform Global vision Copper-dominant mining Our transformation into a diversified, operations in Spain and Australia international and sustainable mining generating strong operating cash- company flows New Production Hubs Strong Pipeline Refreshed

  26. Slide 26: Contact Details

    For personal use only Contact Details +61 8 6430 3800 +61 8 6430 3849 www.sandfire.com.au Corporate Head Office Level 2, 10 Kings Park Road West Perth WA 6005 Australia PO Box 1495 West Perth WA 6872 Australia

Sandfire Resources — Africa Down Under Conference 2022 on 6ix