Turquoise Hill Resources Ltd.

Turquoise Hill Resources — Non-Deal Roadshow (December 2013)

14 slides from Turquoise Hill Resources's roadshow presentation, Dec 3, 2013

  1. Slide 1: Oyu Tolgoi – a world-class copper and gold mine

    A final prospectus containing important information relating to the securities described in this document has been filed with the securities regulatory authorities in each of the provinces and territories of Canada. A copy of the final prospectus, and any amendment, is required to be delivered with

  2. Slide 2: Forward-looking statements

    Forward-looking statements This presentation includes certain “forward-looking information” within the meaning of applicable Canadian securities legislation and “forward-looking statements” within the meaning of the “safe harbour” provisions of the United States Private Securities Litigation Reform

  3. Slide 3: Long-term growth opportunity

    Long-term growth opportunity 1 Pure copper and gold exposure with attractive industry fundamentals 2 World class asset, strategically located 3 Flexible growth profile with further prospectivity 4 Commenced production, cash flow generation in 2014 5 Partnership with best-in-class operator and develo

  4. Slide 4: Oyu Tolgoi – a tier 1 asset

    Oyu Tolgoi – a tier 1 asset Copper mine cost curve in 2020 (c/lb, 2013$) 400 • Oyu Tolgoi is in the first quartile of the industry 350 Oyu Tolgoi cost curve Other Mines 300 250 • Third largest copper mine after planned expansion1 200 150 • Top 10 copper deposit by 100 contained reserves and resource

  5. Slide 5: Fundamentals for copper remain strong

    Fundamentals for copper remain strong  Copper market likely to see small surplus in coming years  Ongoing attrition at existing mines driven by structural decline in grade; continued demand growth means the industry will need to deliver new capacity in the medium-term  Market anticipates a defici

  6. Slide 6: Strategically located next to key growth market

    Strategically located next to key growth market Strategic location:  At the doorstep of the major growth market, 80km from Chinese border Near-term and large scale:  Long-life mine  2.2bt measured & indicated and 4.4bt inferred resource  1.5bt mineral reserve, 26.5Mlb. of copper and 12.9Moz. of

  7. Slide 7: Our People, Our Impact

    Our People, Our Impact  All Injury Frequency Rate performance good at 0.45 per 200,000 hours worked  HSE System certified to ISO 14001 and OSHAS 18001  Mongolians now occupy more than 90% of roles  Over $1 billion in taxes, pre-payments and fees paid to the Government  Partnered with more than

  8. Slide 8: From construction to operations

    From construction to operations Q1’13 Q2’13 Q3’13 Q4’13 • Initial construction • Concentrator • Commercial • Customers begin substantially complete continued to improve production achieved collecting concentrate stabilizing at rates • First copper-gold above 70% design • Commenced shipping • 72,000

  9. Slide 9: Current development plan

    Current development plan  Feasibility study progressing and on track for H1 2014 completion  Core team ready for quick restart of the underground development 9

  10. Slide 10: Potential for significant development opportunities

    Potential for significant development opportunities  All options being evaluated to ensure optimum development pathway  Actual operating performance will inform choice of expansion path  A decision to expand the concentrator will not be required for a couple years 10

  11. Slide 11: Vast resources and further prospectivity

    Vast resources and further prospectivity • Already ranked in the top ten copper resources in the world1 • Mineralized trend at least 26km • Exploration continues with modest expenditure and an emphasis on data mining and re-analysis • Effort focused on potential targets which could displace existing

  12. Slide 12: Funding a priority

    Funding a priority  Fund ongoing development of the project and restart of underground development Main  Repay New Bridge Facility and Interim Funding Facility Objectives  Diversify sources of project funding through involvement of International Financial Institutions, Export Credit Agencies and

  13. Slide 13: Turquoise Hill – a long term growth opportunity

    Turquoise Hill – a long term growth opportunity  Pure copper and gold exposure with expansive resources  Concentrator at full capacity, generating positive cash flow in 2014  Feasibility study to be complete in H1 2014  Progressing Project Financing for funding of underground development  Signi

  14. Slide 14: Additional information

    Additional information Turquoise Hill has filed a prospectus with the securities regulatory authorities in each of the provinces and territories of Canada and a corresponding registration statement (including a prospectus) with the SEC for the offering to which this communication relates. Before sha

Turquoise Hill Resources — Non-Deal Roadshow (December 2013) on 6ix