Nuinsco Resources Limited · CSE:NWI

Nuinsco Resources — Investor Presentation (September 2018)

15 slides from Nuinsco Resources's investor presentation, September 2018

  1. Slide 1: Project Update

    yg Nuinsco RESOURCES LIMITED Project Update NWN Nulnsco

  2. Slide 2: The Company: A History of Mining Industry Success

    The Company A History of Mining Industry Success • Over 40 years of industry success. • Management continuity. • One of Canada’s most experienced and persistent exploration companies. • Track record of spinning out projects to create value. • Current assets provide platform to create value by establ

  3. Slide 3: Historic Work Expenditures

    Historic Work Expenditures Dedicated to Exploration and Development Success • Cameron Lake Gold Deposit ‐ C$30M to explore and develop a 500,000 ounce gold deposit in northwestern Ontario. • Rainy River Gold Deposit – C$12,100,000 to discover and develop a 1,000,000 ounce good deposit in northwester

  4. Slide 4: Historic Work Expenditures

    Historic Work Expenditures Dedicated to Exploration and Development Success • Berta and Elmalaan Projects – C$2,700,000 to develop porphyry copper and volcanogenic massive sulphide projects in Turkey. • Chibougamau – C$10,500,000 to develop a copper‐gold mining camp in Quebec. • Egypt – in excess of

  5. Slide 5: Prairie Lake – Current Asset

    Prairie Lake – Current Asset Highlights • 100% owned Prairie Lake Project, secure, superbly‐located multi‐commodity mineral asset. • Phosphorus, REE, cement, tantalum, niobium, food‐ & pharma‐grade calcium sulphate. • Second largest carbonatite‐hosted niobium deposit by tonnage in North America (#1:

  6. Slide 6: Sunbeam

    Sunbeam Property Description • Located approximately 175km west of Thunder Bay, Ontario and, 25km NE of the town of Atikokan off Highway 11. • Access is excellent from Hwy 623 and then local trails onto the property. • 7 claims, 93 units. • totalling 1,312 ha.

  7. Slide 7: Sunbeam: Project Summary

    Sunbeam Project Summary • Limited exploration property‐wide and no work conducted on the past‐ producing Sunbeam Mine since 1905. • Main Shaft #1 was sunk in 1898 to a total vertical depth of 290 ft (90m). • Lateral development totaled 1,033 ft (315m) of drifting . • 236 ft (72m) of stoping on 3 lev

  8. Slide 8: Sunbeam: Project Summary

    Sunbeam Project Summary Mine dumps on property contain multi‐ounce assays up to 898 g gold/t (26.16 oz gold/t). Average historic mine grade reported to be 13g/t but grade is based on recovery (using stamp mill) and actual grade is expected to be higher. Past‐producing Sunbeam Mine is located on a NE

  9. Slide 9: Sunbeam: Mineralized Trends

    Sunbeam Mineralized Trends (after TerraX 2009-2011 Work) Sunbeam Mine is located within more extensive mineralized trends. Sampling along the local trends demonstrates the presence of widespread gold mineralization. Modified After TerraX, 2013

  10. Slide 10: Sunbeam: Contoured Grade Plot of Mine Mineralisation

    Sunbeam Contoured Grade Plot of Mine Mineralisation • Contour plot of grade from sampling on all levels of Sunbeam Mine. • Grade improves with depth ‐ ‐300ft level has most abundant high grade intervals. • Lowest level averages 16.60g/t Au over 76.20m including 35.56g/t Au over 27.43m (historic samp

  11. Slide 11: El Sid - Future Opportunity

    El Sid ‐ Future Opportunity Commenced Evaluation • Site visit conducted to El Sid site in February 2017 – sampling conducted to confirm historic values. Additional work including data compilation and digitisation underway.

  12. Slide 12: Qualified Independent Board

    Qualified Independent Board René R. Galipeau Chairman & Director 40+ years international mining experience including Hudson Bay Mining, Breakwater Resources, Lac Minerals, Rio Algom and Victory Nickel Inc. Dr. Raymond Goldie Geologist, Dr. Raymond Goldie has had a distinguished career in the mining

  13. Slide 13: Management

    Management Paul L. Jones CEO & Director A geologist with 35+ years of domestic and international experience in mineral exploration, evaluation and development with more than 20 junior companies. Sean Stokes Executive Vice President MBA with close to 30 years of management/business development/financ

  14. Slide 14: Summary

    Summary All the Tools for Exploration Success, Project Development and Wealth Creation • Continuous history of financing, exploration, discovery and development leading to mine building over a 40‐year period in gold, copper, zinc, nickel, uranium, rare earths, niobium, tantalum, phosphorus. • Extens

  15. Slide 15: For Further Information Please Contact

    For Further Information Please Contact • Paul Jones, CEO, paul.jones@nuinsco.ca • Sean Stokes, Executive Vice‐President, sean.stokes@nuinsco.ca • www.nuinsco.ca • SEDAR Public Disclosure: http://sedar.com/DisplayCompanyDocuments.do?lang=EN&issue rNo=00001232