Slide 1: Jedinstvo
Slide 2: About the Company
ABOUT THE COMPANY
Slide 3: MPP Jedinstvo company profile
MPP “Jedinstvo“ is an open joint stock company featuring over 70 years of tradition and experience in turnkey projects, design and execution of all sorts of hydro HVAC installations, steam, water, gas and liquid fuel distribution plants; heating plants, potable water supply systems, outdoor installa
Slide 4: Jedinstvo Group companies
() Jedinstvo G R U P A MPP JEDINSTVO NOVI PAZAR el PUT JEDINSTVO INZENJERING MOSKVA ZLATIBOR GAS JEDINSTVO SLOVENIJA LIVNICA POZEGA JEDINSTVO METALOGRADNJA JEDINSTVO BiH JEDINSTVO PODGORICA METALING-EKO DOO
Slide 5: Macro organization chart
MACRO ORGANIZATION CHART MPP JEDINSTVO a.d. MPP Jedinstvo a.d. ASSEMBLY SUPERVISORY BOARD President of the Supervisory Board EXECUTIVE BOARD Director General Seed Ce oe Director Subsidiary ABROAD General companies deputy . Directors Directors ENGINEERING TECHNICAL DEPARTMENT OF BRANCH OFFICE INTEGRA
Slide 6: Financial Data
FINANCIAL DATA CONSOLIDATED FINANCIAL STATEMENT BALANCE SHEET 2015 2016 2017 OPERATING INCOMES Fioxed assets 4,064,270 4,435,433 4,244,913 Working capital 4,803,885 7,131,849 6,930,272 Deferred tax assets 17,538 51,664 56,231 Total assets 8,885,693 11,618,946 11,231,416 Capital 4,951,302 5,317,275 5
Slide 7: References
REFERENCES Project: Water Supply Scheme for the Kolubara District Investor: Delegation of the European Union to the Republic of Serbia, Ministry of Justice - Republic of Serbia and Hidrotehnika-Hidroenergetika a.d. Belgrade Value of works: EUR 10.025.000 Implementation period: 2012-2016 Within the W
Slide 8: Water Factory Uzice
Project: Water Factory Uzice Investor: Ministry of Construction, Transportation and Infrastructure and the City of Uzice Value of works: EUR 2.780.000,00 Implementation period: 2016-2017 Reconstruction and Extension Project for the Water Treatment Plant “Petar Antonijevic” in Uzice. The following wo
Slide 9: Sewage and water supply system in Novi Pazar
Project: Construction of faecal sewage system, rain sewerage system, and water supply network in Novi Pazar Investor: City of Novi Pazar Value of works: EUR 1.829.000,00 Implementation period: 2015-2017 The following construction works were executed on: Faecal sewage system: 19.200m ella} SSRIS syst
Slide 10: Aeroinzenjering Beograd
Project: Aeroinzenjering Beograd Investor: Ministry of Justice Value of works: EUR 2.900.000,00 Implementation period: 2013-2014 Total area of the building: 9.500 m2 Full range of works was carried out on the development of project documentation, execution of construction and finishing works, hydro
Slide 11: Prvi partizan production facilities
Investor: Prvi partizan a.d. Project: Production facilities: “Bullet’; “Gama’, 1and 3 Value of works: EUR 5.200.000 Implementation period: 2012-2016 The full range of construction, mechanical and electrical works were executed on the construction and reconstruction of the production facilities, name
Slide 12: GRUNDFOS GMS
Project: GRUNDFOS GMS Investor: ENERGOGROUP doo Value of works: EUR 2.220.000,00 Implementation period: 2012 Total area of the factory: 25.500 m2 Factory GRUNDFOS GMS, Phase I, Indjija: Execution of works on the mechanical installations (HVAC and water and sewerage systems), and automatic control sy
Slide 13: Oil Terminal Complex
Project: Oil Terminal Complex Investor: JETOIL SRBIJA doo Value of works: EUR 6.700.000,00 Implementation period: 2012-2014 Total area of the complex: 52.163 m2 The terminal complex for storage and refilling of oil derivatives in Smederevo was executed according to a “turnkey” system. MPP Jedinstvo
Slide 14: Oil Tanks in Novi Sad
Project: Oil Tanks in Novi Sad Investor: PC Transnafta | PHASE Value of works: EUR 804.000 Implementation period: 2014-2015 Preliminary construction works onthe construction of 2x20.000m3 tanks forthe storage of crude ollin Novi Sad. I| PHASE Value of works: EUR 3.750.000,00 Implementation period: 2
Slide 15: Construction of Distribution Gas Pipelines
Project: Construction of Distribution Gas Pipelines Investor: Ministry of Mining and Energy MPP Jedinstvo, in the period 2007-2012 in the territory of Western Serbia, under several separate contracts, executed works on the construction of gas distribution pipelines in the total length exceeding 80km
Slide 16: Fuel Supply Stations
Project: Fuel Supply Stations Investor: NIS a.d. Novi Sad Value of works: EUR 6.545.000,00 The Consortium “Bokirus Moskva Inzenjering” doo Belgrade and MPP Jedinstvo a.d. Sevojno, in the period from 2016-2017, executed works on the construction of the fuel supply stations (including demolition of th
Slide 17: Mini Hydro Power Plant Beli Kamen in Zlatibor
Project: Mini Hydro Power Plant “Beli Kamen” in Zlatibor Investor: Elektrovat doo Beograd Value of works: EUR 1.937.000,00 Implementation period: 2015-217 The full range of construction, finishing, mechanical works on the construction of a MHPP were executed. The works were executed on the construct
Slide 18: Irrigation System in the Municipality of Grocka
Project: Irrigation System in the Municipality of Grocka Investor: City of Belgrade Value of works: EUR 3.645.000,00 Implementation period: 2012-2015 MPP Jedinstvo executed the work on the construction of the farmland irrigation System in the Municipality of Grocka under two separate contracts, wher
Slide 19: Indoor City Swimming Pool in Pirot
Project: Indoor City Swimming Pool in Pirot Investor: A.D. Putevi Uzice Value of works: EUR 1.140.000,00 Implementation period: 2011-2015 Total area of the facility: 6.600 m2, pool dim. 33x25m and 12x8m The following work was executed on the facility: construction and electrical works as well as del
Slide 20: Russian International Olympic University
Project: Russian International Olympic University and Hotel complex, Sochi, Russian Federation Investor: AD Putevi, UZice Value of works: RUB 1.038.600,00 Implementation period: 2011-2013 General features of the building: It consists of six units: block 1 - university; block 2 - 3-star hotel; block
Slide 21: Hotel complex Kamelia Sochi
Project: Hotel complex “Kamelia” Sochi, Russian Federation Investor: Kamelia Value of works: RUB 756.000,000,00 Implementation period: 2012-2014 General features of the building: 5-star hotel, brand Swissotel, area 33.003m?, and Suites hotel, area 19.772m?. Development of documentation and a RD Stud
Slide 22: WTP Bolje Sestre
Project: WTP “Bolje Sestre” Investor: Regionalni vodovod Crnogorsko primorje Value of works: EUR 13,436.000 Implementation period: 2008-2010 Execution of hydro-mechanical and electrical works. Construction of ready-to-use facilities: Water treatment plant “Bolje Sestre”, administration building with
Slide 23: Water Supply and Sanitation Adriatic Coast
Project: Water Supply and Sanitation Adriatic Coast, Phase Ill - Kotor Investor: PC Vodovod i kanalizacija Kotor, Monte Negro Value of works: EUR 6.770.000 Implementation period: 2011-2013 Works were executed for the construction of: Coast sewer Kamp - Sv. Stasije: 2.700 m Coast sewer Peluzica - Gla
Slide 24: Pomurje Water Supply - System A
Project: Pomurje Water Supply - System A, municipalities of Velika Polana, Turnisce, Crensovci, Odranci, Kobilje, Lendava and Dobrovnik Investor: Municipalities of Velika Polana, Turnisce, Crensovci, Odranci, Kobilje, Lendava and Dobrovnik Value of works: EUR 20.488.000 Implementation period: 2013-2
Slide 25: Water Supply pipeline
Project: Water Supply pipeline Investor: Municipality of Foéa, R. Srpska Value of works: EUR 2.348.000 Implementation period: 2015-2016 Works were executed on the construction of a water supply pipeline from the “Luéka Vrela” catchment to the reservoir in the Obili¢evo settlement, a pressure breakin
Slide 26: Ongoing Project
ONGOING PROJECT Facility: Flue Gas Desulphurization System for TP Plant Nikola Tesla-A Obrenovac Investor: Elektroprivreda Srbije Value of works : EUR 95,500.000,00 Implementation period: 2018-2022 I STORAGE @UILOING 3A | assonser ELECTRICAL eum The Flue Gas Desulphurization (FGD) Construction Proje
Slide 27: ISO Certificates
ISO CERTIFICATES contests cH0180 ‘ Conic cx01991 MPP ,,Jedinstvo“ a.d. Sevojno MPP ,,Jedinstvo“ a.d. Sevojno Prose, 3128 Seopa, Sela Prromaa bb 320 Serco, ea a cnt ce ecg ced SGS ‘tenement tome SCS ISO 9001:2008 ISO 14001:2004 cn eee ipsanay eee en t ‘sel Marulacture of strctra! metal products Manul
Slide 28: 31205 Sevojno
la \ \IZ 31205 Sevojno Prvomajska bb Street Serbia Tel: +381 (0)31 532-911 Fax: +381 (0)31 533-685 e-mail: office@mppjedinstvo.co.rs www.mppjedinstvo.co.rs Branch office in Belgrade 12a Omladinsko Setaliste Street 11090 Belgrade