Jedinstvo Ad Sevojno · BELEX:JESV

Jedinstvo Ad Sevojno — MPP Jedinstvo a.d. Sevojno — Investor Presentation (2018)

28 slides from Jedinstvo Ad Sevojno's investor presentation, 2018

  1. Slide 1: Jedinstvo

  2. Slide 2: About the Company

    ABOUT THE COMPANY

  3. Slide 3: MPP Jedinstvo company profile

    MPP “Jedinstvo“ is an open joint stock company featuring over 70 years of tradition and experience in turnkey projects, design and execution of all sorts of hydro HVAC installations, steam, water, gas and liquid fuel distribution plants; heating plants, potable water supply systems, outdoor installa

  4. Slide 4: Jedinstvo Group companies

    () Jedinstvo G R U P A MPP JEDINSTVO NOVI PAZAR el PUT JEDINSTVO INZENJERING MOSKVA ZLATIBOR GAS JEDINSTVO SLOVENIJA LIVNICA POZEGA JEDINSTVO METALOGRADNJA JEDINSTVO BiH JEDINSTVO PODGORICA METALING-EKO DOO

  5. Slide 5: Macro organization chart

    MACRO ORGANIZATION CHART MPP JEDINSTVO a.d. MPP Jedinstvo a.d. ASSEMBLY SUPERVISORY BOARD President of the Supervisory Board EXECUTIVE BOARD Director General Seed Ce oe Director Subsidiary ABROAD General companies deputy . Directors Directors ENGINEERING TECHNICAL DEPARTMENT OF BRANCH OFFICE INTEGRA

  6. Slide 6: Financial Data

    FINANCIAL DATA CONSOLIDATED FINANCIAL STATEMENT BALANCE SHEET 2015 2016 2017 OPERATING INCOMES Fioxed assets 4,064,270 4,435,433 4,244,913 Working capital 4,803,885 7,131,849 6,930,272 Deferred tax assets 17,538 51,664 56,231 Total assets 8,885,693 11,618,946 11,231,416 Capital 4,951,302 5,317,275 5

  7. Slide 7: References

    REFERENCES Project: Water Supply Scheme for the Kolubara District Investor: Delegation of the European Union to the Republic of Serbia, Ministry of Justice - Republic of Serbia and Hidrotehnika-Hidroenergetika a.d. Belgrade Value of works: EUR 10.025.000 Implementation period: 2012-2016 Within the W

  8. Slide 8: Water Factory Uzice

    Project: Water Factory Uzice Investor: Ministry of Construction, Transportation and Infrastructure and the City of Uzice Value of works: EUR 2.780.000,00 Implementation period: 2016-2017 Reconstruction and Extension Project for the Water Treatment Plant “Petar Antonijevic” in Uzice. The following wo

  9. Slide 9: Sewage and water supply system in Novi Pazar

    Project: Construction of faecal sewage system, rain sewerage system, and water supply network in Novi Pazar Investor: City of Novi Pazar Value of works: EUR 1.829.000,00 Implementation period: 2015-2017 The following construction works were executed on: Faecal sewage system: 19.200m ella} SSRIS syst

  10. Slide 10: Aeroinzenjering Beograd

    Project: Aeroinzenjering Beograd Investor: Ministry of Justice Value of works: EUR 2.900.000,00 Implementation period: 2013-2014 Total area of the building: 9.500 m2 Full range of works was carried out on the development of project documentation, execution of construction and finishing works, hydro

  11. Slide 11: Prvi partizan production facilities

    Investor: Prvi partizan a.d. Project: Production facilities: “Bullet’; “Gama’, 1and 3 Value of works: EUR 5.200.000 Implementation period: 2012-2016 The full range of construction, mechanical and electrical works were executed on the construction and reconstruction of the production facilities, name

  12. Slide 12: GRUNDFOS GMS

    Project: GRUNDFOS GMS Investor: ENERGOGROUP doo Value of works: EUR 2.220.000,00 Implementation period: 2012 Total area of the factory: 25.500 m2 Factory GRUNDFOS GMS, Phase I, Indjija: Execution of works on the mechanical installations (HVAC and water and sewerage systems), and automatic control sy

  13. Slide 13: Oil Terminal Complex

    Project: Oil Terminal Complex Investor: JETOIL SRBIJA doo Value of works: EUR 6.700.000,00 Implementation period: 2012-2014 Total area of the complex: 52.163 m2 The terminal complex for storage and refilling of oil derivatives in Smederevo was executed according to a “turnkey” system. MPP Jedinstvo

  14. Slide 14: Oil Tanks in Novi Sad

    Project: Oil Tanks in Novi Sad Investor: PC Transnafta | PHASE Value of works: EUR 804.000 Implementation period: 2014-2015 Preliminary construction works onthe construction of 2x20.000m3 tanks forthe storage of crude ollin Novi Sad. I| PHASE Value of works: EUR 3.750.000,00 Implementation period: 2

  15. Slide 15: Construction of Distribution Gas Pipelines

    Project: Construction of Distribution Gas Pipelines Investor: Ministry of Mining and Energy MPP Jedinstvo, in the period 2007-2012 in the territory of Western Serbia, under several separate contracts, executed works on the construction of gas distribution pipelines in the total length exceeding 80km

  16. Slide 16: Fuel Supply Stations

    Project: Fuel Supply Stations Investor: NIS a.d. Novi Sad Value of works: EUR 6.545.000,00 The Consortium “Bokirus Moskva Inzenjering” doo Belgrade and MPP Jedinstvo a.d. Sevojno, in the period from 2016-2017, executed works on the construction of the fuel supply stations (including demolition of th

  17. Slide 17: Mini Hydro Power Plant Beli Kamen in Zlatibor

    Project: Mini Hydro Power Plant “Beli Kamen” in Zlatibor Investor: Elektrovat doo Beograd Value of works: EUR 1.937.000,00 Implementation period: 2015-217 The full range of construction, finishing, mechanical works on the construction of a MHPP were executed. The works were executed on the construct

  18. Slide 18: Irrigation System in the Municipality of Grocka

    Project: Irrigation System in the Municipality of Grocka Investor: City of Belgrade Value of works: EUR 3.645.000,00 Implementation period: 2012-2015 MPP Jedinstvo executed the work on the construction of the farmland irrigation System in the Municipality of Grocka under two separate contracts, wher

  19. Slide 19: Indoor City Swimming Pool in Pirot

    Project: Indoor City Swimming Pool in Pirot Investor: A.D. Putevi Uzice Value of works: EUR 1.140.000,00 Implementation period: 2011-2015 Total area of the facility: 6.600 m2, pool dim. 33x25m and 12x8m The following work was executed on the facility: construction and electrical works as well as del

  20. Slide 20: Russian International Olympic University

    Project: Russian International Olympic University and Hotel complex, Sochi, Russian Federation Investor: AD Putevi, UZice Value of works: RUB 1.038.600,00 Implementation period: 2011-2013 General features of the building: It consists of six units: block 1 - university; block 2 - 3-star hotel; block

  21. Slide 21: Hotel complex Kamelia Sochi

    Project: Hotel complex “Kamelia” Sochi, Russian Federation Investor: Kamelia Value of works: RUB 756.000,000,00 Implementation period: 2012-2014 General features of the building: 5-star hotel, brand Swissotel, area 33.003m?, and Suites hotel, area 19.772m?. Development of documentation and a RD Stud

  22. Slide 22: WTP Bolje Sestre

    Project: WTP “Bolje Sestre” Investor: Regionalni vodovod Crnogorsko primorje Value of works: EUR 13,436.000 Implementation period: 2008-2010 Execution of hydro-mechanical and electrical works. Construction of ready-to-use facilities: Water treatment plant “Bolje Sestre”, administration building with

  23. Slide 23: Water Supply and Sanitation Adriatic Coast

    Project: Water Supply and Sanitation Adriatic Coast, Phase Ill - Kotor Investor: PC Vodovod i kanalizacija Kotor, Monte Negro Value of works: EUR 6.770.000 Implementation period: 2011-2013 Works were executed for the construction of: Coast sewer Kamp - Sv. Stasije: 2.700 m Coast sewer Peluzica - Gla

  24. Slide 24: Pomurje Water Supply - System A

    Project: Pomurje Water Supply - System A, municipalities of Velika Polana, Turnisce, Crensovci, Odranci, Kobilje, Lendava and Dobrovnik Investor: Municipalities of Velika Polana, Turnisce, Crensovci, Odranci, Kobilje, Lendava and Dobrovnik Value of works: EUR 20.488.000 Implementation period: 2013-2

  25. Slide 25: Water Supply pipeline

    Project: Water Supply pipeline Investor: Municipality of Foéa, R. Srpska Value of works: EUR 2.348.000 Implementation period: 2015-2016 Works were executed on the construction of a water supply pipeline from the “Luéka Vrela” catchment to the reservoir in the Obili¢evo settlement, a pressure breakin

  26. Slide 26: Ongoing Project

    ONGOING PROJECT Facility: Flue Gas Desulphurization System for TP Plant Nikola Tesla-A Obrenovac Investor: Elektroprivreda Srbije Value of works : EUR 95,500.000,00 Implementation period: 2018-2022 I STORAGE @UILOING 3A | assonser ELECTRICAL eum The Flue Gas Desulphurization (FGD) Construction Proje

  27. Slide 27: ISO Certificates

    ISO CERTIFICATES contests cH0180 ‘ Conic cx01991 MPP ,,Jedinstvo“ a.d. Sevojno MPP ,,Jedinstvo“ a.d. Sevojno Prose, 3128 Seopa, Sela Prromaa bb 320 Serco, ea a cnt ce ecg ced SGS ‘tenement tome SCS ISO 9001:2008 ISO 14001:2004 cn eee ipsanay eee en t ‘sel Marulacture of strctra! metal products Manul

  28. Slide 28: 31205 Sevojno

    la \ \IZ 31205 Sevojno Prvomajska bb Street Serbia Tel: +381 (0)31 532-911 Fax: +381 (0)31 533-685 e-mail: office@mppjedinstvo.co.rs www.mppjedinstvo.co.rs Branch office in Belgrade 12a Omladinsko Setaliste Street 11090 Belgrade

MPP Jedinstvo a.d. Sevojno — Investor Presentation (2018) on 6ix