Altamin Limited · ASX:AZI
Altamin — Alta Zinc — Investor Presentation (August 2018)
16 slides from Altamin's investor presentation, Aug 13, 2018
Slide 1: Gorno Zinc Project
For personal use only GORNO ZINC PROJECT Lombardy, Northern Italy “Recommencing supply of high quality concentrates in Western Europe underpinned by existing resource, infrastructure & strong local support” 1 Alta Zinc Limited : ABN 63 078 510 988 : [ASX:AZI]
Slide 2: Cautionary Statements
CAUTIONARY STATEMENTS For personal use only This presentation contains summary information about Alta Zinc Limited (Alta Zinc or the Company). Summary of information: This presentation contains general and background information about the Company’s activities current as at the date of the presentati
Slide 3: Gorno Zinc Project – 100% Ownership
GORNO ZINC PROJECT – 100% OWNERSHIP For personal use only • Brownfield project located in northern Italy – mining friendly jurisdiction with existing infrastructure • Gorno is able to be developed in 2 Phases Gorno Project • Phase 1 Starter Project • Feasibility Study due Q4-2018 (Lycopodium/AMC) •
Slide 4: Current Zorzone Resource
CURRENT ZORZONE RESOURCE For personal use only PIAN BRACCA ARERA THRUST TARGET NORTH EXTENSION FONTANONE ZORZONE RESOURCE Phase 1 Starter Project based on Zorzone only SOUTH EXTENSION
Slide 5: Zorzone Resource – Tip of the Iceberg
For personal use only ZORZONE RESOURCE “TIP OF THE ICEBERG” Near resource mineralisation underpins future expansion Colonna Zorzone Resource North & South mineralised extensions Pian Bracca Mineralised Zone Recently identified thick stratabound sequence of sulphides – remains open Fontanone & Arera
Slide 6: Phase 1 Starter Project
PHASE 1 STARTER PROJECT For personal use only FEASIBILITY STUDY UNDERWAY: • AMC – mining, backfill design & scheduling • Lycopodium – metallurgy & process engineering design Study parameters use existing infrastructure to support low capital cost re-start – with a modular expansion strategy Mining
Slide 7: Phased Development Approach
PHASED DEVELOPMENT For personal use only APPROACH Existing resource & infrastructure reduces up front capital & development time • Phase 2 expansion – supported by drilling of near resource mineralised extensions during Phase 1 • Utilising rehabilitated infrastructure from Phase 1 (including Riso-Pa
Slide 8: Gorno Project Timeline
GORNO PROJECT TIMELINE For personal use only Targeting production from Phase 1 Starter Project 2H 2020 – Phase 2 to follow 2H 2018 1H 2019 2H 2019 1H 2020 2H 2020 1H 2021 FS Permitting FEED & Funding Phase 1 Construction Production Phase 2 Phase 2 FS & Preparation Drilling
Slide 9: Licences and Permitting
LICENCES AND PERMITTING For personal use only Management is experienced at obtaining relevant approvals on a timely basis Existing Mining Licence (ML) Granted & to be √ renewed post-FS Environmental Impact Assessment (EIA) √ 80% complete Integrated Environmental Authorization (IEA) Design/Constructi
Slide 10: Strategic Zinc Supply in Western Europe
STRATEGIC ZINC SUPPLY IN For personal use only WESTERN EUROPE Source of clean zinc concentrate located close to transport & customers 10
Slide 11: Excellent Metallurgical Study Results
EXCELLENT METALLURGICAL For personal use only STUDY RESULTS Testwork confirms Gorno produces high-grade concentrates with low impurities • Proven process flowsheet • Historical records support process pathway • Ore sorting can achieve 55% waste rejection Expected flotation recoveries for a 95% sulph
Slide 12: Zinc Market Fundamentals
ZINC MARKET FUNDAMENTALS For personal use only Gorno’s low impurity concentrates will be attractive to smelters who need to blend high impurity deliveries Strong zinc supply/demand fundamentals • Galvanising ~50% (construction, transport & ancillary) • China consumes c. 48% of world demand Total wor
Slide 13: Bringing Life Back to Gorno
BRINGING LIFE BACK TO GORNO For personal use only Strong support from local communities and authorities 13
Slide 14: Expertise
For personal use only EXPERTISE DIRECTORS Alexander Burns - Exec Chairman/CEO Stephen Hills - Finance Director Marcello Cardaci - Non-Exec Director Campbell Olsen - Non-Exec Director ADVISORY PANEL MANAGEMENT Hugh Morgan Marcello De Angelis - Director Italy (WMC ) Fabio Granitzio - Exploration Manag
Slide 15: Corporate
CORPORATE For personal use only Shareholder & management interests are aligned Value Proposition Issued share capital 1,369M Cash (at 30 June 2018) A$2.4M Market Cap (at 10 Aug 2018) A$6.8M Enterprise Value A$4.4M Alta Zinc Limited (www.altazinc.com) Corporate Office: Level 3, Suite 3.5, 9 Bowman St
Slide 16: Competent Person Statements
COMPETENT PERSON STATEMENTS For personal use only Information in this release that relates to Exploration Targets and Exploration Results is based on information prepared or reviewed by Dr Fabio Granitzio, a Competent Person who is a Member of the Australian Institute of Geoscientists. Dr Granitzio