  1. Slide 1: Community Consultative Committee

    Community Consultative Committee 25th July 2024

  2. Slide 2: Business Arising

    2 Business Arising a.Camberwell Demolition timetable

  3. Slide 3: Ashton Mine Statistics 2024 (YTD)

    3 Ashton Mine Statistics 2024 (YTD) Ashton Coal Key Statistics 2024 Budget 2024 Actual ROM (Mt) 0.922 0.984 Product Coal (Mt) 0.424 0.422 Total Coal Sales (Mt) 0.457 0.366 Total Recordable Injuries (TRI) 10 5 Total Employees (FTE) 327.6 271 Complaints 0 2 Environmental Incidents 0 0

  4. Slide 4: Current Mining Plan

    Pikes Gully Seam mus 2023 As Mined me 2023 As Mined mmm 2024 Proposed Mined mmm 2024 Proposed Mined Lwat LW 206 Lw 206 Lw 204 Lw203 Lwe202 Lw 201 ASHTON UNDERGROUND MINE 2023 MINED AND 2024 PROPOSED MINING PG AND ULLD SEAM ¥% AshtonCoal Peco uneanenh paetanece ne

  5. Slide 5: Environment Monitoring Data

    5 Environment Monitoring Data  Refer to monitoring data attachment.

  6. Slide 6: Complaints and Incidents

    6 Complaints and Incidents • Two community complaints received from residents in Camberwell village relating to noise. After investigation it was confirmed that Ashton was not responsible for one of the noise issues but was still in compliance on both occasions. • Nil environmental incidents YTD.

  7. Slide 7: Environmental Update

    7 Environmental Update  Annual Review Report submitted.  Annual flora monitoring undertaken onsite.  Annual fauna monitoring undertaken onsite  Monthly noise monitoring undertaken. No issues identified.  Annual macroinvertebrate monitoring undertaken. No issues raised.  Monthly groundwater mon

  8. Slide 8: Wild Dog & Fox Bait locations

    8 Wild Dog & Fox Bait locations

  9. Slide 9: Baiting results

    nber of Baits Taken 0 41 33 Ashton 2019 Autumn Baiting Program 62 51 36 30 24 18 18 11 il Ba. ed : bed ted Ashton 2019 Ashton 2020 Ashton 2020 Ashton 2021 ton 2021 Ashton 2022 Ashton 2022 Ashton 2023 Spring Baiting Autumn Baiting Spring Baiting Autumn Baiting Sane Baiting Autumn Baiting Spring Baiti

  10. Slide 10: Recent Archaeological Works Completed

    10 Recent Archaeological Works Completed LW207A Salvage – AHIMS Site 37-3-0496 • Aboriginal archaeological salvage excavations within PAD area of recorded Aboriginal archaeological site #37-3-0496. Site is located on an elevated above Bowmans • A grid was place across the area to be impacted by subs

  11. Slide 11: Recent Archaeological Works Completed

    11 Recent Archaeological Works Completed LW207A Salvage – AHIMS Site 37-3-0496

  12. Slide 12: Recent Archaeological Works Completed

    12 Recent Archaeological Works Completed LW207A Salvage – AHIMS Site 37-3-0496

  13. Slide 13: Upcoming Archaeological Works

    13 Upcoming Archaeological Works June - December • Complete archaeological salvage works LW207A PAD and LW207B PAD areas • Undertake any required due diligence inspections • Commence artefact cleaning/analysis works

  14. Slide 14: Camberwell update

    14 Camberwell update • 33 Residential Tenancy Agreements • 11 Dwellings in Asset Maintenance Program • 16 Vacant residential lots • 2 Commercial agreements • 11 rural areas occupied

  15. Slide 15: Lemington Road Subsidence

    15 Lemington Road Subsidence  Lemington Road will be impacted by subsidence from LW 207B  Start in September 2024  Traffic management in place 24/7  Public Notice

  16. Slide 16: Camberwell update

    16 Camberwell update • Proposed demolitions • have engaged a company to start the DA process through council

  17. Slide 17: Ashton Coal Community Support Program

    17 Ashton Coal Community Support Program

  18. Slide 18: Any Questions?