  1. Slide 1: Growth From A Diverse Portfolio

    Slide 1: Growth From A Diverse Portfolio

    Growth From A Diverse Portfolio @CANACOL ENERGY LTD. May ‘15

  2. Slide 2: Forward-looking statements and boe conversion

    Slide 2: Forward-looking statements and boe conversion

    This presentation may include certain forward looking statements. All statements other than statements of historical fact, included herein, including, without limitation, statements regarding future plans and objectives of Canacol Energy Ltd. Canacol or the Corporation , are forward- looking stateme

  3. Slide 3: Proven oil & gas finders in Colombia and Ecuador

    Slide 3: Proven oil & gas finders in Colombia and Ecuador

    Proven oil & gas finders in Colombia and Ecuador Paid ~$230 MM Value created >$1 B Exploration 15-for-24 wells (63%) Discovered >50 MMboe in 2P reserves OIL GAS Development 50-for-53 wells (94%) Gas focus until oil rebounds +54% CAGR in 2P gas reserves CY guidance(1) 10-12,000 avg. boepd (60% WTI in

  4. Slide 4: More savings to come…

    Slide 4: More savings to come…

    % of CNE s total production Oil Tariff Gas Gas and tariff oil focus % insensitive, as of Mar Gas ~3,500 boepd (32%) Tariff ~1,700 (16%) 32% 24% 48% Reduce exposure to oil price volatility % insensitive for CY estimate Jun '14 Sep '14 Dec '14 Mar '15 $ / boe Lean machine Dec '14 -29% Mar '15 $19.17 M

  5. Slide 5: 2015 E&D budget and production growth

    Slide 5: 2015 E&D budget and production growth

    $ MM E&D budget for ~63% development $32 MM spent YTD / $52 MM remaining Light oil Oriente $8 MM Llanos Dry gas 4x production starting in Dec $33 MM Lower Magdalena $43 MM Ĺ production from 20 ĺ 83 MMcf/d 49% Ĺ gas ebitda from $30 ĺ $150 MM(1) 2 wells and 1 workover left in Dry gas Starting CY Q , w

  6. Slide 6: Projected >10x increase in gas revenues and EBITDA

    Slide 6: Projected >10x increase in gas revenues and EBITDA

    $500 Projected >10x Ĺ in gas revs & ebitda $400 Each gas contract is locked-in, take-or-pay contracts: Customers (yrs.) 5-15 $300 Volumes (MMcf/d) 118 Gas sales price range (MMbtu) $5-$8 $200 Price escalation (/yr.) 2-3% $100 $ MM $- e ĺ 20e gas activities / yr. '15e '16e '17e '18e '19e '20e Spend ~

  7. Slide 7: Colombia's gas demand set to increase faster than world demand

    Slide 7: Colombia's gas demand set to increase faster than world demand

    Colombia s gas demand is set to Demand for gas in Canacol s target increase 9x faster than world demand market (Caribbean coast) is set to accelerate 1.7x faster than country demand MMcf/d +15% 1,200 Thermoelectric +0% 1,000 Transport +10% 800 -3% +3% Ecopetrol 600 Petrochemical Bogota Industrial +2

  8. Slide 8: Caribbean coast gas supply and demand

    Slide 8: Caribbean coast gas supply and demand

    Ballena Chuchupa 3 Guajira fields -20% y/y Riohacha Caribbean Sea Caribbean coast Barranquilla Demand ~575 MMcf/d in e 7 gas fired 14ĺ e CAGR + % power plants Supply ~501 MMcf/d in Lower Mag 3 Guajira fields declined ~20% y/y (blow-down) Cartagena Basin Supply options were limited in the Lower Mag <

  9. Slide 9: Geography and geology of the Lower Magdalena gas platform

    Slide 9: Geography and geology of the Lower Magdalena gas platform

    La Creciente Geography: Fastest growing gas market in Colombia World >> Colombia >> Caribbean Coast (Canacol s market) +1% +9% +15% per yr. VIM 19 100% Geology: Repeatability from Cienaga de Oro reservoir 345 BCF(1) + >2 TCF upside(2) Nelson 15 prospects/leads 3 key discoveries from same reservoir P

  10. Slide 10: Clarinete-1 appraisal opportunity

    Slide 10: Clarinete-1 appraisal opportunity

    VIM 5 Upper Zone GWC @ -6,410 ft subsea Oboe-1 appraisal well program in Oboe-1 + Clarinete-2 ~3,000 acres Opportunity ahead… 80 MMcf/d for 10 yrs. Clarinete-2 Subcrop edge appraisal (1) Reserve report as of Feb , pre-tax NPV-10 (2) Resource report as of Feb , pre-tax NPV-10 Clarinete-1 10

  11. Slide 11: Gas infrastructure and production timeline to December

    Slide 11: Gas infrastructure and production timeline to December

    Cartagena 7 gas fired power plants Oct Finish 15 km flow line, tie Clarinete to Jobo Nov Upgrade Jobo facilities 50ĺ130 MMcf/d From 120 to 185 MMcf/d Dec Quadruple production 20 ĺ 83 MMcf/d Filadelphia Expand ebitda $30 ĺ $150 MM(1) La Creciente +58 MMcf/d Sincelejo Dec Finish ~ km pipeline From 15

  12. Slide 12: Llanos oil blocks and exploration trends

    Slide 12: Llanos oil blocks and exploration trends

    Las Maracas ~12 MMbls L 26 MMbls oil trend(1) P 08ĺ present Blocks RH (100%) and LLA 23 (90%) Cravo S Tigro Net acres / oil fields 112k / 6 ~9 MMbls Success 89% (32/36 wells) LLA 23 Cravo E ~8 MMbls Remaining 2P reserves 10 MMbls(2) New CY Q 3D Production 4,512 bopd Realized price / netback $38.43 /

  13. Slide 13: 714k net acres and new D&M report on shale oil

    Slide 13: 714k net acres and new D&M report on shale oil

    VMM 2 Santa 1 3 Isabel 714k net acres 2 VMM 3 Shell Shell N Ecopetrol Drilling VIM 37 CNOOC New D&M Report reveals large upside present for Canacol(1) Covers only 3 of 7 prospective shale oil blocks Exxon S COR 39 4 5 COR 4 Exxon N 6 COR 11 7 COR 12 S (1) Represents DeGolyer & MacNaugton resource re

  14. Slide 14: La Luna Shale results

    Slide 14: La Luna Shale results

    La Luna Depth Structure Source Rock Maturity Picoplata-1 (20% WI) Mono Araña-1 Picoplata-1 Las Lajas-1 TD (Jan ‘15) 16,406 ft. Tested 590 bopd Tested 250 bopd Porosity 11% Porosity 10% Drilled 1,369 ft. La Luna shale Mono Araña-1 (incl. 740 ft. core) UMIR Picoplata-1 Section over-pressured (15.3 ppg

  15. Slide 15: Gas focus until oil rebounds; 2015-2020 outlook

    Slide 15: Gas focus until oil rebounds; 2015-2020 outlook

    Gas focus until oil rebounds e 10-12,000 boepd CY guidance(1) 10-12,000 boepd 100% from base 2P reserves (60% WTI insensitive) Base 2P reserves Dry gas 345 BCF (61 MMboe)(1) Light oil 23 MMbls(2) e ĺ 20e, exploit a diverse portfolio ĺ e Prove up >280 MMboe(3) Base 2P reserves production +20% CAGR, 1

  16. Slide 16: Capitalization and debt facilities

    Slide 16: Capitalization and debt facilities

    TSX (CNE), BVC (CNEC), OTCQX (CNNEF) BNP Paribas, new long-term credit agreement In MM $200 MM, fully drawn Shares outstanding 116.6 Jun convert share issue ~8.0 Replaces existing senior credit agreement 124.6 USD in MM Matures Sep Market capitalization $314.6(1) No principal payments until Dec Bank