Kinross Gold Corporation · TSX:K

Kinross Gold — Gold Forum Americas 2021

67 slides from Kinross Gold's conference presentation, Sep 13, 2021

  1. Slide 1: Delivering Value.

    September 2021 Delivering Value. Kinross Gold Corporation

  2. Slide 2: Cautionary Statement on Forward-Looking Information

    September 2021 Cautionary Statement on Forward-Looking Information All statements, other than statements of historical fact, contained or incorporated by reference in or made in giving this presentation and responses to questions, including but not limited to any information as to the future perform

  3. Slide 3: Table of Contents

    Table of Contents Company Overview 4 Operations and Projects 24 Americas 25 West Africa 41 Russia 48 Corporate Responsibility 55 Appendix 62 3

  4. Slide 4: Kinross Gold Corporation

    Kinross Gold Corporation

  5. Slide 5: Who is Kinross?

    Kinross Gold Corporation September 2021 Who is Kinross? GLOBAL PRODUCTION (1) PORTFOLIO Portfolio GROWING TO 8 mines 2.9Moz. (iii) 3 regions LARGE GOLD GEOGRAPHICALLY STRONG COMMITTED TO EXCELLENT PRODUCER, DIVERSIFIED OPERATING TRACK RESPONSIBLE BALANCE SHEET HIGHLY LIQUID PRODUCER RECORD MINING •

  6. Slide 6: Diversified Portfolio of Assets

    September 2021 Diversified Portfolio of Assets Portfolio of mines and development projects located in three core regions Kupol-Dvoinoye, Russia Fort Knox, U.S.A. Manh Choh, U.S.A. Udinsk, Russia Bald Mountain, Head Office, U.S.A. Toronto, Canada Round Mountain, 2020 Gold Equivalent U.S.A. Production

  7. Slide 7: Nine Consecutive Years of Meeting Guidance

    Kinross Gold Corporation September 2021 Nine Consecutive Years of Meeting Guidance Kinross has met or exceeded guidance for production, costs and capital expenditures for the past nine years 2012 2013 2014 2015 2016 2017 2018 2019 2020 Met or exceeded annual production guidance          Met

  8. Slide 8: Exciting Future

    Kinross Gold Corporation September 2021 Exciting Future Expecting production growth of 20% from 2020 to 2023 and average annual production of ~2.5 million gold equivalent ounces over the decade(1)(2) Three drivers underpinning and extending current production… Growing Production Profile • Recent cap

  9. Slide 9: Production Plans and Project Pipeline

    Kinross Gold Corporation September 2021 Production Plans and Project Pipeline Base Case Expected Additional Pipeline Growth Projects Opportunities Kupol: regional exploration, Kupol-Dvoinoye Chulbatkan: Udinsk mine life extensions Tasiast 24k Tasiast: satellites, West Branch depth extension Chirano

  10. Slide 10: Advancing the Project Pipeline

    Kinross Gold Corporation September 2021 Advancing the Project Pipeline Expected project milestones at growth projects that span all three operating regions H1 2021 >> H2 2021 >> 2022 >> 2023+ La Coipa Restart Commence  Q4 Chulbatkan: Udinsk Q1 Tasiast 24k Mid-2023 Tasiast 24k Phase 7 pre-stripping

  11. Slide 11: Prioritizing Resource Conversion

    Kinross Gold Corporation September 2021 Prioritizing Resource Conversion (i) Significant potential for mine life extension at existing assets 25 20 15 Years 10 5 - Expected Reserve Life Expected Resource Life (i) See Appendix Notes: - Excludes Kettle River and Maricunga 11 - Incorporates internal as

  12. Slide 12: Strong Liquidity and Financial Flexibility

    Kinross Gold Corporation September 2021 Strong Liquidity and Financial Flexibility Well-positioned to fund portfolio of mines and growth projects Liquidity Position Financial Flexibility • Available liquidity of ~$2.2 billion, including $676 million of cash • Very manageable leverage with low net de

  13. Slide 13: Disciplined Capital Allocation Strategy

    Kinross Gold Corporation September 2021 Disciplined Capital Allocation Strategy Reinvesting in our Business 2021 Guidance • Sustaining capex – maintaining our existing operations $340 million safely and to world-class environmental standards • Expansion projects – pursuing attractive returns by leve

  14. Slide 14: Measured Acquisition Track Record

    Kinross Gold Corporation September 2021 Measured Acquisition Track Record Disciplined approach to M&A over the past 9 years, focused on assets that leverage operating expertise in existing regions Bald Mountain & 50% Hydroelectric of Round Mountain(i) Power Plants Chulbatkan Manh Choh(ii) Nevada, U.

  15. Slide 15: Manageable Debt Profile

    Kinross Gold Corporation September 2021 Manageable Debt Profile Kinross’ senior notes are rated investment grade; repaid $500 million of senior notes on June 1, 2021 ahead of maturity Debt Schedule Debt Ratings Agency Rating $72 S&P BBB- (Stable) $32 Moody’s Baa3 (Positive) $500 $500 Fitch BBB (Stab

  16. Slide 16: Global Mining Leader in ESG

    Kinross Gold Corporation September 2021 Global Mining Leader in ESG Prioritizing the effective management of ESG risks through our principled approach to sustainability and strong on-the-ground performance at our operations • ESG performance consistently RobecoSAM ranks in top quartile of peer group

  17. Slide 17: Global Mining Leader in ESG

    Kinross Gold Corporation September 2021 (i) Global Mining Leader in ESG Environment Social Governance 99% 939,000 TAILINGS MANAGEMENT of workforce hired from beneficiaries of INDEPENDENT BOARD within host country community investments • 8 of 9 Board members are • Kinross has no upstream facilities i

  18. Slide 18: Competitive Production and AISC Profile

    Kinross Gold Corporation September 2021 Competitive Production and AISC Profile 2020A Production 2020A All-In Sustaining Cost (million ounces) ($ per ounce) 6.0 $1,100 5.0 $1,000 4.0 3.0 $900 2.0 $800 1.0 - $700 Barrick Kirkland Lake Barrick Kirkland Lake Newmont AngloGold Gold Fields Agnico Eagle A

  19. Slide 19: Attractive Value Opportunity

    Kinross Gold Corporation September 2021 Attractive Value Opportunity Relative to peers, considering Kinross’ annual production growth, cost structure and track record P / 2021E Operating CF EV / 2021E EBITDA 9.1 8.5 8.3 8.3 7.7 7.2 7.3 6.7 6.4 6.2 5.9 5.7 5.1 5.1 5.2 5.0 4.4 4.0 Kirkland Lake Barric

  20. Slide 20: Analyst Consensus P/NAV

    Kinross Gold Corporation September 2021 Discounted Valuation Not Justified by Operating Jurisdictions P/NAV vs. Fraser Institute Ranking (Weighted by NAV) 1.4x Agnico Eagle 1.3x Newmont Analyst Consensus P/NAV 1.2x Kirkland Lake 1.1x Barrick 1.0x Gold Fields Newcrest 0.9x 0.8x AngloGold Kinross Yama

  21. Slide 21: Proven Track Record in Mauritania

    Kinross Gold Corporation September 2021 Proven Track Record in Mauritania Successfully operated for over 10 years Cumulative production of over 2.5 million gold equivalent ounces  Established $300 million political risk insurance policy with MIGA A member of the World Bank  Constructed Phase One P

  22. Slide 22: Proven Track Record in Russia

    Kinross Gold Corporation September 2021 Proven Track Record in Russia Kinross has a long and successful 26-year track record investing in Russia Significant Operating Experience 2020 Statistics: Kinross Investments in Russia • Operated four mines, including the high grade, low cost Kupol and Dvoinoy

  23. Slide 23: Kinross Investment Case

    Kinross Investment Case Operational Excellence Financial Strength & Flexibility Diverse portfolio of mines consistently meeting Maintaining a strong balance sheet continues to or outperforming operational targets be a priority objective 9 Available liquidity of ~$2.2 billion Met or exceeded Attracti

  24. Slide 24: Operations and Projects

    Operations and Projects

  25. Slide 25: Americas

    September 2021 Americas 2020 Gold Equivalent Production(1) Country Highlights Paracatu, Brazil Our largest mine, Paracatu, 23% Brazil boasts an attractive cost 22% structure 2.4M Fort Knox, ~1/3rd of our production comes Alaska from Nevada and Alaska – two ounces 10% U.S.A. 23% of the world’s top mi

  26. Slide 26: Paracatu, Brazil (100%)

    Americas September 2021 Paracatu, Brazil (100%) Tier 1 gold mine with a long mine life that extends to 2032 • Among the world’s largest gold Operating Results(3) operations, with annual throughput of ~60 million tonnes 2018 2019 2020 • Potential mine life extensions in light of Production the strong

  27. Slide 27: Paracatu – Northwest Extension

    Americas September 2021 Paracatu – Northwest Extension Mineralization extends to the west of the existing reserve pit NW Ph1B Multiple NW Ph2 pushbacks being evaluated to the west of Au (g/t) NW Ph1A A – A’ existing reserve pit A’ A Reserve Pit 27

  28. Slide 28: Round Mountain, U.S.A. (100%)

    Americas September 2021 Round Mountain, U.S.A. (100%) Large, open pit mine with mine life expected to extend to at least 2027 • Substantial resource: orebody is open at Operating Results(3) depth with increasing grade • Mine plan optimization underway; results 2018 2019 2020 expected in Q2 2022 Prod

  29. Slide 29: Round Mountain – Phase S

    Americas September 2021 Round Mountain – Phase S Potential next pushback on the south side of the Round Mountain pit • May extend open pit operations until Plan view of Round Mountain 2029 and mill life to early 2030s Phase X • Pit optimization scoping study suggests potential indicated resource of

  30. Slide 30: Round Mountain – Phase X

    Americas September 2021 Round Mountain – Phase X Assessing ability to further extend mine life • Studying potential for incremental mine • Encountering mineralized material in Phase W life extensions at $1,400/oz. or higher upper deposit - potential to add ounces in upper gold prices Phase X • Infil

  31. Slide 31: Fort Knox, U.S.A. (100%)

    Americas September 2021 Fort Knox, U.S.A. (100%) Successfully operating one of the world’s few cold weather heap leaches where mine life is expected to extend to 2030 • Future production growth driven by Operating Results(3) enhancements to the mine plan, including: o Accelerating production at the

  32. Slide 32: Fort Knox – Gil Satellite Pits

    Americas September 2021 Fort Knox – Gil Satellite Pits Expected to provide near-term, higher-grade ore to Fort Knox operation North Gil Metric (approx.) Estimate(i) First production Q4 2021 Mine life 2 years Total production (Au eq. oz.) 160koz. Sourdough Average cash cost (Au eq. oz.) $920/oz. Mine

  33. Slide 33: Fort Knox – Manh Choh (70%)

    Americas September 2021 Fort Knox – Manh Choh (70%) Scoping study confirmed project as low-risk, low-cost, high-return addition to Fort Knox • Development plan 2020 Manh Choh Gold Resource Estimates(i) contemplates trucking ore to Tonnes Grade Ounces the Fort Knox mill for crushing (thousands) (Au g

  34. Slide 34: Bald Mountain, U.S.A. (100%)

    Americas September 2021 Bald Mountain, U.S.A. (100%) Forecasting strong near-term cash flow with significant upside potential • Large mineral resource base with Operating Results(3) multiple sources of potential mineral reserve additions that could extend 2018 2019 2020 mine life beyond mid-2020s Pr

  35. Slide 35: Bald Mountain Targets

    Americas September 2021 Bald Mountain Targets Numerous targets within the large land package • 1.1 million ounces of reserves(i) at $1,200/oz. Resource Pits – Expected Mine Potential Plan to 2024 • Potential to add significant mine life at higher Extensions gold prices N. Duke Royale o Upside could

  36. Slide 36: A Return to Production in Chile

    Americas September 2021 A Return to Production in Chile Mined in succession, La Coipa and Lobo-Marte could enable production in Chile beyond 2040 • La Coipa and Lobo-Marte are located in Chile’s Atacama (Region III), N approximately 650 km north of Santiago • Both deposits are in the Maricunga Belt,

  37. Slide 37: La Coipa Restart Project

    Americas September 2021 La Coipa Restart Project On budget and on schedule for first production in mid-2022 • Leverages existing infrastructure, Coipa Norte Puren Phase 7 including plant and Maricunga mine fleet • Potential to extend mine life through satellite deposits beyond Phase 7 Can Can • Proj

  38. Slide 38: La Coipa Restart Feasibility Study Results

    Americas September 2021 La Coipa Restart Feasibility Study Results Project expected to generate a 28% IRR at an assumed gold price of $1,200/oz. Feasibility Study Estimates Life of mine production (2022 to 2024) 690,000 gold equivalent ounces Average production cost of sales(3) $575 per gold equival

  39. Slide 39: Lobo-Marte

    Americas September 2021 Lobo-Marte Project has the potential to support Kinross’ long-term production profile with attractive all-in sustaining costs • Substantial resource with 6.4 million higher- grade gold ounces of estimated probable 2020 Gold Reserve & Resource Estimates(i) mineral reserves(i)

  40. Slide 40: Lobo-Marte Pre-Feasibility Study Results

    Americas September 2021 Lobo-Marte Pre-Feasibility Study Results Feasibility study expected to be complete in Q4 2021 Pre-Feasibility Study Estimates Initial Capital Costs ($M) Life of mine production (million Au oz.) 4.5 Mine equipment $100 Life of mine ore processed (million tonnes) 147 Average gr

  41. Slide 41: West Africa

    September 2021 West Africa 2020 Gold Equivalent Production(1) Country Highlights Growing production with a Tasiast, 22% Mauritania large gold resource located in Mauritania a prospective district 2.4M ounces 55% Ghana Recent exploration success resulted in mine life extension 17% to at least 2025 6%

  42. Slide 42: Tasiast, Mauritania (100%)

    West Africa September 2021 Tasiast, Mauritania (100%) Low-cost mine with a large gold resource located in a prospective district • Estimated mine life: 2033 Operating Results(3) • Mill expected to be operational in Q4 2021 following a fire in Q2 2021: 2018 2019 2020 o Confident the motor, bearings a

  43. Slide 43: Advancing the Tasiast 24k Project

    West Africa September 2021 Advancing the Tasiast 24k Project Despite production setback in 2021, project timeline still intact Project overview Project financing in place • Incorporates operational efficiencies identified in • Signed $300 million IFC-led project financing areas of maintenance, minin

  44. Slide 44: 24k Project Feasibility Study Results

    West Africa September 2021 24k Project Feasibility Study Results The value-enhancing Tasiast 24k project offers attractive estimated returns, increased production and lower costs Operating Estimates Throughput capacity 24,000 t/d Average annual production (2022 – 2028) 563,000 gold ounces Production

  45. Slide 45: Tasiast Exploration

    West Africa September 2021 Tasiast Exploration World-class orebody and highly prospective district Northern satellites • Multiple low strip(i) oxide deposits located 5 - 12 km north of the Tasiast operation • Fennec, C67, and C68 are prospective targets for further drilling o High grade satellite or

  46. Slide 46: Chirano, Ghana (90%)

    West Africa September 2021 Chirano, Ghana (90%) Three-year mine life extension to 2025 due to exploration success • Underground and open pit operation Operating Results(1,3) located in southwestern Ghana • Further mine life extensions possible 2018 2019 2020 through continued exploration Production

  47. Slide 47: Chirano Exploration

    West Africa September 2021 Chirano Exploration 2021 exploration budget increased by 20% to $12 million to build off successful year in 2020 • Targeting significant portion of existing • 2021 program includes drilling depth mineral resources for potential extensions at Obra, Akwaaba, Suraw, conversio

  48. Slide 48: Russia

    September 2021 Russia 2020 Gold Equivalent Production(1) Highlights Kupol-Dvoinoye Udinsk development project expected to extend our long history of production in Russia 22% beyond 2030 Long track record of mine life extensions 2.4Mounces 55% expected to continue at Kupol 23% Americas West Africa Ru

  49. Slide 49: Strong Platform in Russia

    Russia September 2021 Strong Platform in Russia Track record of adding reserves through exploration to offset depletion at Kupol supports a bridge to production at Chulbatkan 12 2025 Projected End of Mine Life 10 Gold Equivalent Ounces 8 2022 (Millions) 6 4 2019 2 - 2016 2008 2009 2010 2011 2012 201

  50. Slide 50: Kupol-Dvoinoye (100%)

    Russia September 2021 Kupol-Dvoinoye (100%) Our Russian mines are a model for successfully operating in a remote location • Mine life expected until at least 2025 following 2020 Gold Reserve & Resource Estimates(i) another 1-year addition in 2020 Tonnes Grade Ounces (thousands) (Au g/t) (thousands)

  51. Slide 51: Kupol Exploration

    Russia September 2021 Kupol Exploration Targeting additional reserve growth Big Central South North North South Extension Bend Zone Zone Zone Zone Upper North Extension 42 Kupol Deeps S. Hanging N. Hanging Providence Moroshka Vtoriy Wall Wall Base Case Additional Pipeline Opportunities Depletion Nor

  52. Slide 52: Prospective Exploration Targets in Russia

    Russia September 2021 Prospective Exploration Targets in Russia 2020 drill program added approximately 409koz. to mineral reserves(i) to largely offset depletion at Kupol-Dvoinoye, the largest reserve addition since 2014 Kupol-Dvoinoye • 6 underground and 2 surface drill rigs in operation with the g

  53. Slide 53: Udinsk: First Mine in Chulbatkan Region

    Russia September 2021 Udinsk: First Mine in Chulbatkan Region Large Chulbatkan region includes several promising targets; Udinsk mine advancing as planned • Encouraging results on the larger Chulbatkan license support the 2021 drill program focusing on new target areas near the Udinsk resource pit t

  54. Slide 54: Udinsk Preliminary Estimates

    Russia September 2021 Udinsk Preliminary Estimates Expected to be a substantial open pit gold mine with a low all-in sustaining cost(3) Preliminary estimates; scope of project may change following planned extensive drill program and technical studies and trade-offs Excellent fit for Kinross Metric E

  55. Slide 55: Corporate Responsibility

    Corporate Responsibility 55

  56. Slide 56: Our Approach

    Corporate Responsibility September 2021 Our Approach At the heart of our success is our people and our four Core Values Our Values and Guiding Principles unite our global workforce Our approach to Corporate Responsibility can be distilled into four main areas: Do no harm – We work to protect our wor

  57. Slide 57: Strong Safety Performance

    Corporate Responsibility September 2021 Strong Safety Performance Maintained Total Reportable Injury Frequency Rate on par with, or better than, low-risk, non-industrial sectors • Implemented risk controls, training, and provided leadership to ensure a culture of safe work at all Benchmarking TRIFR

  58. Slide 58: Climate Change and Energy Efficiency

    Corporate Responsibility September 2021 Climate Change and Energy Efficiency GHG intensity on a per gold equivalent ounce produced basis below peer average – Paracatu down by 33% since 2017 • Published first stand-alone Gold Peers 5-Year GHG Intensity climate report in 2020 in line with (kg CO2e / A

  59. Slide 59: Managing our Environmental Footprint

    Corporate Responsibility September 2021 Managing our Environmental Footprint We are a responsible steward of land and water during all stages of the mine’s life cycle  Received a top ranking for the fourth • Sustained one of the consecutive year from World Wildlife Fund lowest GHG intensities Russi

  60. Slide 60: Responsible & Safe Tailings Management

    Corporate Responsibility September 2021 Responsible & Safe Tailings Management All of our tailings facilities are designed and constructed to the highest engineering standards and meet or exceed regulatory and international requirements and standards of best practice • Tailings management programs i

  61. Slide 61: Governance Highlights

    Corporate Responsibility September 2021 Governance Highlights Kinross is committed to the highest standards of corporate governance and accountability • All directors are independent except • 8 of 9 Board members are for the Chief Executive Officer independent • All of our Board committees are • Boa

  62. Slide 62: Appendix

    IX Append KINROSS

  63. Slide 63: Mineral Reserve and Mineral Resource Statement

    Appendix September 2021 MINERAL RESERVE AND MINERAL RESOURCE STATEMENT MINERAL RESERVE AND MINERAL RESOURCE STATEMENT GOLD PROVEN AND PROBABLE MINERAL RESERVES (1,2,3,4,5,6) Kinross Gold Corporation's Share at December 31, 2020 Kinross Proven Probable Proven and Probable Property Location Interest T

  64. Slide 64: Mineral Reserve and Mineral Resource Statement

    Appendix September 2021 MINERAL RESERVE AND MINERAL RESOURCE STATEMENT MINERAL RESERVE AND MINERAL RESOURCE STATEMENT GOLD MEASURED AND INDICATED MINERAL RESOURCES (EXCLUDES PROVEN AND PROBABLE MINERAL RESERVES) (2,3,4,5,6,9,10,11) Kinross Gold Corporation's Share at December 31, 2020 Kinross Measur

  65. Slide 65: Notes – 2020 Kinross Mineral Reserve & Resource Statements

    Appendix September 2021 Notes – 2020 Kinross Mineral Reserve & Resource Statements (1) Unless otherwise noted, the Company’s mineral reserves are estimated using appropriate cut-off grades based on an assumed gold price of $1,200 per ounce and a silver price of $17.00 per ounce. Mineral reserves are

  66. Slide 66: Endnotes

    Appendix September 2021 Endnotes 1) Unless otherwise noted, gold equivalent production, gold equivalent ounces sold, production cost of sales, all-in sustaining cost figures and attributable margin in this presentation are based on Kinross’ 90% share of Chirano production and costs and 70% share of

  67. Slide 67: Slide 67

Kinross Gold — Gold Forum Americas 2021 on 6ix