Nordx Metals Corp. · CSE:NRDX

Nordx Metals — Investor Presentation (August 2026)

25 slides from Nordx Metals's investor presentation, Aug 1, 2026

  1. Slide 1: Driving the Future of Nordic Critical Minerals

    Driving the Future of Nordic Critical Minerals Corporate Presentation – August 1, 2026 CSE: NRDX | OTCQB: NRDMF | FWB: 0UL0 © 2026 NORDX METALS. ALL RIGHTS RESERVED.

  2. Slide 2: Disclaimer

    Disclaimer THIS MANAGEMENT PRESENTATION: This presentation (this “Presentation”) was prepared as a summary overview only of the current affairs of NordX Metals Corp. (“NordX Metals” or the “Company”) and is provided for information purposes only, and was not prepared for the purpose of assisting pro

  3. Slide 3: The Nuclear Renaissance

    The Nuclear Renaissance Diablo Canyon – Nuclear Power Plant Carlifornia 2026.04.03, License renewal for extension by another 20 years. Picture by John Lindsey (PG&E)

  4. Slide 4: Macro Opportunity for Uranium

    Macro Opportunity for Uranium Uranium demand across Europe continues to grow Whilst supply looks uncertain Restarts, life extensions and new builds Dwindling reserves, deeper deposits, and lack of exploration success Mlb U3O8 450 400 350 300 250 200 150 100 50 0 25 26 27 28 29 30 31 32 33 34 35 36 3

  5. Slide 5: Why NordX? Scandinavian Uranium

    Why NordX? Tier-1 Jurisdictions NordX Advantage Sweden & Finland — politically stable, top- Disciplined exploration Company ranked mining destinations with centuries advancing high-potential assets in a of mining heritage and world-class responsible, long-term development infrastructure. framework.

  6. Slide 6: Company Snapshot and Ownership Breakdown

    Company Snapshot Ownership Breakdown Shares Issued and Outstanding 43.73M Warrants ($0.62/share) ¹ 12.83M $Nil Management & Board (16%) Debt Family, friends and strategic (35%) Other investors (49%) Option/DSUs: 3.2M Working Capital 2 $1.0M Fully Diluted shares outstanding 59.76M ¹ As at August 1, 2

  7. Slide 7: Portfolio Overview and Why the Nordics?

    Portfolio Overview  Over 8.75 million pounds U3O8 of historical non-compliant mineral resources divided across 4 uranium prospects 3 with brownfield exploration around an historic uranium mine.  Many projects previously owned by AREVA (now ORANO).  Finland has an active mine producing uranium and

  8. Slide 8: Management and Board

    Management and Board Andrew Bowering Interim CEO Michael Kobler Director Seasoned venture capitalist with over 30 years of experience in mineral exploration and Mining engineer with 35 years of experience in global resource development and early-stage development across the Americas. He co-founded M

  9. Slide 9: Technical Team

    Technical Team Jukka-Pekka Ranta I PhD I Expl. Manager Finland Isabelle Lépine I M.Sc. P.GEO I QP and Resource Geologist PhD in applied mineralogy and hydrothermal ore-forming processes. Has a strong Resource development expert with over 20 years of experience leading technical programs understandin

  10. Slide 10: Riutta Project

    Riutta Project  Past-producing uranium mine located on project.  High-grade, wide and shallow mineralization 11.3m at 0.68% U3O8 from 21.2m downhole.  AREVA (now Orano) drilled during last uranium bull cycle.  Ready to drill targets established at Riutta South with drilling commencing September

  11. Slide 11: Duobblon Project

    Duobblon Project  8.75 Mlbs at 0.029% U3O8 (Historical, non-compliant estimate4) with mineralization defined in 5-25 m thick ignimbrite units from 3m-300m vertical depth.  Extensive historical drilling 53 diamond drillholes for 10,300m with almost all core available to resample.  Positive metallu

  12. Slide 12: Bergby Project

    Bergby Project  5 drill confirmed lithium spodumene pegmatites extending over more than 4km across a highly prospective 7,897 ha land package.  High grade, shallow, drill defined Over 16,000 metres of drilling has been completed with drill highlights including 47.75m at 1.34% Li₂O from 2.25m downh

  13. Slide 13: Bergby Project

    Bergby Project  Pegmatites occur in two clusters 2km apart and open along strike and at depth.  Strong metallurgy results Spodumene was the primary lithium mineral identified, accounting for 94%, 95%, 91% and 79% of lithium in peg B, C, D and E respectively. Liberated spodumene accounts for 81% in

  14. Slide 14: Norr Döttern Project

    Norr Döttern Project  High grade, shallow uranium mineralisation Mineralisation up to 28% U3O8 over 0.2m in surface trenching and limited historic government drilling showing 4m at 0.19% U3O8 from 66m downhole and 11.9m at 0.1% U3O8 from 18.6m  Historic non-compliant resource estimate ~4,900m dril

  15. Slide 15: Exploration timeline 2026-2027

    Exploration timeline 2026-2027 Q2 2026 Q3 2026 Q4 2026 Q1 2027 RIUTTA Resampling & Relogging Diamond Drilling ASENTO Soil & Boulder Sampling Drone Mag & Radiometrics BOT Drilling DUOBBLON Drillcore Relogging Relogging, Mapping, Sampling, NORR DÖTTERN Radon-X cup survey Diamond + BOT Drilling FLISTJÄ

  16. Slide 16: Portfolio overview

    Portfolio overview  De-risked assets  High-grade surface and near-surface mineralization  Multiple open deposits + district-scale trends  By-product credits (REE, kyanite, gold, base metals)  Tier-1 jurisdictions with pro-nuclear tailwinds and record uranium prices THE SCANDINAVIAN ADVANTAGE Hi

  17. Slide 17: Appendices

    Appendices © 2026 NORDX METALS. ALL RIGHTS RESERVED.

  18. Slide 18: Asento Project

    Asento Project  Large scale structural network with high strength, widespread radiometric anomalies.  Over 1000 uriniferous boulders mostly local in origin located by AREVA, with main mineralised boulder fields verified in field by NordX geologists.  Well positioned with access to road and power

  19. Slide 19: Flistjärn Project

    Flistjärn Project  Very high-grade uranium mineralization starts at the surface with historic rock chip assays showing up to 21.06% U3O8.  20 km long unconformity corridor with up to 300m long mineralized cross cutting NE trending structures hosting high grade uranium at the graphite-rich contacts

  20. Slide 20: Kitka Project

    Kitka Project  Orogenic Gold deposit with cobalt, REEs and Uranium Historic resource estimate completed by Dragon Mining.  Extensive historical drilling At least 6,930m of drilling undertaken within our project boundary.  Proximity to major deposit8 Along the same structural setting as the Juomas

  21. Slide 21: Kovela Project

    Kovela Project  REE prospect with 99,000t containing 1.36% REEOx7 (historical, non-compliant estimate) with numerous additional untested dykes.  High grade and shallow: Up to 5% REE and 491ppm U with mineralization starting at 21.5m downhole.  Well positioned: Access to road and power infrastruct

  22. Slide 22: Project H

    Project H  High grade, shallow uranium mineralisation A 252m drilling campaign in 2006 intersected 0.9m at 0.33% U3O8 from 33m downhole and 1m at 0.19% U3O8 from 13.1m downhole.  Wide mineralised trench results 10m at 0.36% U3O8 and 5m at 0.16% U3O8 .  Other priority target areas defined Positive

  23. Slide 23: Märrviken Project

    Märrviken Project  2000m x 400m uranium mineralised boulder train 766 mineralized boulders located by the Swedish Geological survey with highlights including 24.7% U3O8, 20.37% U3O8 and 6.01% U3O8  Limited government drilling intersected shallow uranium 2m at 0.034% U3O8 from 30m downhole within a

  24. Slide 24: Kietyonmaki Project

    Kietyonmaki Project  High grade and shallow lithium mineralization Over 2,500 metres of drilling at the project with drill highlights including 25.95m at 1.52% Li₂O from 33.7m downhole(hole ULDH-3) and 29.5m at 1.45% Li₂O from 69.1m downhole(hole ULDH-4).  Open along strike and at depth Drilling t

  25. Slide 25: ir@nordxmetals.com www.nordxmetals.com

    CSE: NRDX | OTCQB: NRDMF| FWB: 0UL0 ir@nordxmetals.com www.nordxmetals.com © 2026 NORDX METALS. ALL RIGHTS RESERVED.

NordX Metals — Investor Presentation (August 2026) on 6ix