Adani Energy Solutions Ltd · NSE:ADANIENSOL

Adani Energy Solutions — Investor Presentation (November 2026)

40 slides from Adani Energy Solutions's investor presentation, November 2026

  1. Slide 1: Adani Energy Solutions Limited Investor Presentation

    Slide 1: Adani Energy Solutions Limited Investor Presentation

    Adani Energy Solutions Limited Investor Presentation | November 2026

  2. Slide 2: Contents

    Slide 2: Contents

    Contents 1 Executive Summary 2 Investment Highlights 3 ESG Annexures STRICTLY CONFIDENTIAL

  3. Slide 3: Executive Summary

    Slide 3: Executive Summary

    1 Executive Summary STRICTLY CONFIDENTIAL

  4. Slide 4: India | Colossal Growth Opportunity

    Slide 4: India | Colossal Growth Opportunity

    India | Colossal Growth Opportunity Key Highlights: Fastest growing economy + large consumer base…. …needs critical infra in transport and logistics Fastest Growing Large Economy Large Consumer Base Under penetration of Air Travel High logistics cost G20 Real GDP CAGRs, 2014 to 2024 (%) Top 10 Count

  5. Slide 5: India | Electricity Sector – Multi-decade Investment Opportunity

    Slide 5: India | Electricity Sector – Multi-decade Investment Opportunity

    India | Electricity Sector – Multi-decade Investment Opportunity Growth in Indian Electricity Sector Adani’s role in powering India India’s Electricity Sector 6% 11% CAGR ✓ Adani Portfolio has market leading position across entire energy value chain (In GW) 1,000 One of the fastest growing electrici

  6. Slide 6: Adani Portfolio: A World Class Infrastructure & Utility Portfolio

    Slide 6: Adani Portfolio: A World Class Infrastructure & Utility Portfolio

    Adani Portfolio: A World Class Infrastructure & Utility Portfolio Flagship Infrastructure & Utility Core Portfolio Primary Industry Other Incubator Materials, Metal Energy & Utility Transport & Logistics Specialty & Mining (71.97%) (62.43%) (74.96%) (66.03%) (67.29%)2 AEL AGEL APL APSEZ Ports & Logi

  7. Slide 7: India's only Fully Integrated Utility Infrastructure Platform

    Slide 7: India's only Fully Integrated Utility Infrastructure Platform

    Adani Energy Solutions: Leading Utility Platform Driving India’s Energy Transition India’s only Fully Integrated Utility Infrastructure Platform Power Transmission Business Power Distribution Business Smart Metering Business Energy Solutions Businesses Top Rated Private-sector One of the Largest Sma

  8. Slide 8: AESL: Business Update

    Slide 8: AESL: Business Update

    AESL: Business Update Segment Our Current Capability And Reach Key Contractual & Regulatory Strength Growth Potential • 29 Transmission assets under fixed tariff framework and 6 Transmission assets under • Concession life → 35 Years • ~ ₹ 1.4 lakh Cr ($ 14.4 Bn) near term tendering cost-plus (RAB) f

  9. Slide 9: AESL: India's Largest Utility Infrastructure Platform

    Slide 9: AESL: India's Largest Utility Infrastructure Platform

    AESL: India’s Largest Utility Infrastructure Platform Pan India Footprint Key Asset Details Key Financial Metrics Transmission – Q2 & 1H FY27 Q2 FY27 1H FY27 Operational Transmission Assets 29,802 ckms ₹53,144 Cr ₹7,167 Cr ₹14,351 Cr Under Construction Transmission Assets Operational Revenue Operati

  10. Slide 10: Transmission Capex and Smart Meter Installation in 1HFY26 and 1HFY27

    Slide 10: Transmission Capex and Smart Meter Installation in 1HFY26 and 1HFY27

    AESL: Transmission Capex and Smart Meter Installation in 1HFY26 and 1HFY27 Capex delivery has increased $ 1.4 Bn New order wins in 1HFY27 Transmission FY25 Capex : ₹ 7,647 Cr ($ 0.9 Bn) FY26 Capex : ₹ 8,793 Cr ($ 1.0 Bn) 15% Growth in capex Industry Tendering : ₹ 120,394 Cr ($ 12.5 Bn) AESL Order wi

  11. Slide 11: AESL: Key Investment Highlights

    Slide 11: AESL: Key Investment Highlights

    AESL: Key Investment Highlights Key Investment Highlights 1 Low Risk and Stable • 35 Year concession life of transmission assets with availability-based Tariff structure • 25 Year license for distribution assets with RAB based returns & pass-through O&M costs Regulated Infra business 10 Year contrac

  12. Slide 12: Investment Highlights

    Slide 12: Investment Highlights

    2 Investment Highlights STRICTLY CONFIDENTIAL

  13. Slide 13: Stable Regulatory Framework: Driving Lower Risk

    Slide 13: Stable Regulatory Framework: Driving Lower Risk

    1 Stable Regulatory Framework: Driving Lower Risk Anchored with Uniform Infrastructure Business Electricity Act 2003 ROA - Transmission Distribution TBCB - Transmission Section 62 (ROA) Fixed Return Method - Multi Year (5 yr) Tariff Section 63 (TBCB) Tariff Method – Concession Period Basis • Long li

  14. Slide 14: Adani Execution Engine: Project Management & Assurance Group (PMAG)

    Slide 14: Adani Execution Engine: Project Management & Assurance Group (PMAG)

    2 Adani Execution Engine: Project Management & Assurance Group (PMAG) Institutionalised Project Execution Demonstrated on-ground Capex Delivery Adani Infra (India) Limited | ITD Cementation India Ltd. | PSP Projects Ltd. ₹611,000 Cr Cumulative capex during by Adani Portfolio FY20 - FY26 Origination

  15. Slide 15: Transmission Execution Excellence – Case Studies 1 & 2

    Slide 15: Transmission Execution Excellence – Case Studies 1 & 2

    2 Execution: Transmission Execution Excellence – Case Studies 1 & 2 India’s largest 765 kV TBCB Transmission Project → Warora Kurnool Mundra Mohindergarh ± 500kV Bipolar HVDC Project Transmission Line (WKTL) 1,756 ckms 140 ckms/ month 1,980 ckms 2,500 MW Transmission Line Length Average rate of stri

  16. Slide 16: Mumbai Distribution Business - Acquisition and Turnaround - Case Study 3

    Slide 16: Mumbai Distribution Business - Acquisition and Turnaround - Case Study 3

    2 Execution: Mumbai Distribution Business - Acquisition and Turnaround - Case Study 3 ✓ Uptick in regulated capex (₹ Cr) RAB (₹ Cr) – Low capex pre-acquisition on account of liquidity constraints Post-acquisition Projection – Investment in capex resulting in asset hardening → supply 1,404 1,449 1,63

  17. Slide 17: Digitally Enabled Operations Delivering High System Availability

    Slide 17: Digitally Enabled Operations Delivering High System Availability

    3 Operations: Digitally Enabled Operations Delivering High System Availability • Real time monitoring of operating assets across 14 states through Energy Network Operations Center (ENOC) at Ahmedabad​ • Leveraging ENOC capabilities with real-time alerts, 24x7 EHV station operations, weather forecast

  18. Slide 18: Operations: Key Digital Initiatives

    Slide 18: Operations: Key Digital Initiatives

    3 Operations: Key Digital Initiatives LiDAR & Satellite Based Route Survey & Metal Price Intelligence Asset Health Index & Alarm Analytics Optimization Virtual Agents Energy Network Empirical Price Other IT Systems (Prompts Operations Index Forecast MDM, GIS Engineering) Centre (ENOC) Real time data

  19. Slide 19: Locked in Growth: Transmission & Smart Meters

    Slide 19: Locked in Growth: Transmission & Smart Meters

    4 Locked in Growth: Transmission & Smart Meters Transmission Network (in ckms) Smart meters installed (in Mn) 3,636 29,802 Upcoming Untapped 1,533 Bidding 13.2 24.6 market 2,540 2,070 pipeline of opportunity 20,023 of ~ ₹ 1,400 Bn 11.4 2.2x 86 Million vs FY26 to be yet to be tendered in tendered the

  20. Slide 20: Addressable Market: Huge Untapped Growth Across All Line of Businesses

    Slide 20: Addressable Market: Huge Untapped Growth Across All Line of Businesses

    5 Addressable Market: Huge Untapped Growth Across All Line of Businesses Market Positioning and Sectoral Developments are Favorable for AESL Transmission Distribution Smart Metering Energy Solutions Platform • Untapped market of 86 million smart • DISCOM privatization picking up pace with meters whi

  21. Slide 21: Capital Structure: Prudent Capital Management Through Business Life Cycle

    Slide 21: Capital Structure: Prudent Capital Management Through Business Life Cycle

    6 Capital Structure: Prudent Capital Management Through Business Life Cycle AESL is the only private sector transmission and distribution company in India with International IG Rating – Long life contracted assets with sovereign counterparties in a stable regulatory regime (Transmission: 35-year con

  22. Slide 22: Capital Structure: Internal Accruals Exceeds Debt Maturities

    Slide 22: Capital Structure: Internal Accruals Exceeds Debt Maturities

    6 Capital Structure: Internal Accruals Exceeds Debt Maturities All figures in ₹ Cr FFO for FY26 10 years of debt refinancing/maturity profile 8,727 FFO + Cash Balances – 13,0421 4,835 (3,463) (429) 9,633 8,793 7,192 EBITDA Finance Tax Paid FFO Cost 7,862 13,610 7,113 4,093 FFO – 4,8341 13,042 5,356

  23. Slide 23: Capital Structure: Continuously Improving Credit Profile with Deep Rating Coverage

    Slide 23: Capital Structure: Continuously Improving Credit Profile with Deep Rating Coverage

    6 Capital Structure: Continuously Improving Credit Profile with Deep Rating Coverage 3% 1% 3% Global Domestic 28% IG AAA - AA+ Rating Track 41% 39% April April April 69% BB+ AA – AA- Record 2019 58% 2023 58% 2026 7 BB- A Category BBB+ - Below years 97% rated above “AA-” 99% rated above “AA-” 97% rat

  24. Slide 24: ESG

    Slide 24: ESG

    3 ESG STRICTLY CONFIDENTIAL

  25. Slide 25: Assurance Backed ESG Framework

    Slide 25: Assurance Backed ESG Framework

    AESL: Assurance Backed ESG Framework Guiding principles IFC E&S United Nations UN Sustainable Integrated Reporting SLB Performance Global Compact Development Goals framework Principles Guiding Standards Policies principles Disclosure Standards IFRS S1 & S2 TNFD GRI Standards CDP disclosure BRSR GHG

  26. Slide 26: ESG Ratings, Awards and Recognition

    Slide 26: ESG Ratings, Awards and Recognition

    AESL: ESG Ratings, Awards and Recognition Strong ESG Ratings ESG Ratings AESL’s Rating DJSI-S&P Global Corporate S&P CSA score as of August 2026: 90/100 vs 81/100 (Dec 2025), and significantly better than average Global Electric Utility score of Sustainability Assessment 41/100 and among Top 10 %ile

  27. Slide 27: ESG Commitments & Targets

    Slide 27: ESG Commitments & Targets

    AESL: ESG Commitments & Targets ESG Commitments − To maintain our position in the top 10 percentile ESG ratings within global electric utilities (S&P CSA) − To purchase RE power at AEML 60% by FY27 (committed under SLB framework) & 70% RE sources by FY30 − To reduce Emission intensity (tCO 2e/ EBITA

  28. Slide 28: Board of Directors and Management Overview

    Slide 28: Board of Directors and Management Overview

    AESL: Board of Directors and Management Overview 100% Chaired Chaired IDs by by Board of Directors IDs NID Statutory Committees Independent Directors 40% - Audit 🗹 Comprised of only - Nomination & 🗹 Independent Directors Remuneration - Stakeholder Relationship 🗹 100% of Statutory Committees -…

  29. Slide 29: Thank You

    Slide 29: Thank You

    Thank You STRICTLY CONFIDENTIAL

  30. Slide 30: Annexures

    Slide 30: Annexures

    Annexures STRICTLY CONFIDENTIAL

  31. Slide 31: Historical Financials | Profit and Loss Account

    Slide 31: Historical Financials | Profit and Loss Account

    AESL: Historical Financials | Profit and Loss Account CAGR Particulars Unit FY22 FY23 FY24 FY25 FY26 1HFY27 Operating Metrics (FY22-26) FY26 Insights Transmission Lines Ckms 18,795 19,779 20,509 26,696 27,949 10% 29,802 Units Sold (AEML + MUL) Mn Units 7,972 9,050 10,574 11,506 11,959 11% 7,075 Prof

  32. Slide 32: Historical Financials | Balance Sheet

    Slide 32: Historical Financials | Balance Sheet

    AESL: Historical Financials | Balance Sheet Particulars Unit FY22 FY23 FY24 FY25 FY26 1HFY27 Assets FY26 Insights Non-Current Assets Gross Fixed Assets (Incl. CWIP) INR Cr 41,826 46,934 51,783 56,206 61,754 63,515 [-] Accumulated Depreciation INR Cr (6,494) (8,088) (9,861) (10,949) (12,897) (14,058)

  33. Slide 33: Operational Performance

    Slide 33: Operational Performance

    AESL: Operational Performance Transmission Lines1 Transformation Capacity1 System Availability (in circuit kilometers) (in Mega Volt-Amperes) (in %) 1,43,425 99.9% 29,802 99.7% 99.7% 99.6% 99.7% 99.7% 99.6% 27,949 Transmission 26,696 1,23,175 20,509 18,795 19,779 90,236 17,276 57,011 46,001 40,001 3

  34. Slide 34: AESL: Financial Performance

    Slide 34: AESL: Financial Performance

    AESL: Financial Performance Operational Revenue Operational EBITDA 7,327 (in ₹ Cr) 18,213 (in ₹ Cr) 17,008 549 6,541 452 14,653 6,110 14,218 5,341 5,695 2108 12,149 4,660 2175 1393 4,103 4,233 10,183 12450 2007 12234 2098 654 8,840 731 1692 10173 1659 1192 8592 6966 6702 4767 6048 4,366 3,243 3,688

  35. Slide 35: Diversified Asset Base across Key Business Segments

    Slide 35: Diversified Asset Base across Key Business Segments

    AESL: Diversified Asset Base across Key Business Segments Transmission Distribution Smart Meters Section 63 Section 62 10 Contracts AEML, Mumbai MUL, Mundra (Fixed tariff11) (RAB based Assets) (24.6 Mn Meters) 41 Assets 7 Assets License Area → 400 sq km License Area → 85 sq km Contract Value ₹ 295 B

  36. Slide 36: Operational Asset Portfolio as of September 2026

    Slide 36: Operational Asset Portfolio as of September 2026

    AESL: Operational Asset Portfolio as of September 2026 Transmission Line TransformationC Contract Sr No. Projects Name Transmission Line (Asset Details) Length (ckm) apacity (MVA) Type 1 Adani Transmission India Limited (ATIL) Mundra – Dehgam, Mundra – Mohindergarh and Tiroda – Warora 3,834 6,630 RO

  37. Slide 37: Transmission Under-construction Asset Portfolio as of September 2026

    Slide 37: Transmission Under-construction Asset Portfolio as of September 2026

    AESL: Transmission Under-construction Asset Portfolio as of September 2026 Transmission Line TransformationCapac Contract Levelized Tariff / Sr No. Projects Name Transmission Line (Asset Details) Length (ckm) ity (MVA) Type Billing (Rs Crores) 1 WRSR Transmission Limited (WRSR) WRSR (Narendra – Pune

  38. Slide 38: Smart Metering Under-construction Portfolio as of September 2026

    Slide 38: Smart Metering Under-construction Portfolio as of September 2026

    AESL: Smart Metering Under-construction Portfolio as of September 2026 Smart Meters Revenue Potential Contract Period Contract Month of Sr No. Projects Name Coverage Area Qty (Mn) (Rs Cr) (months) Type Award Sept & Oct’22 1 Brihanmumbai Electric Supply & Transport Undertaking (BEST) Mumbai (BEST Cir

  39. Slide 39: Disclaimer

    Slide 39: Disclaimer

    Disclaimer Certain statements made in this presentation may not be based on historical information or facts and may be “forward-looking statements,” including those relating to general business plans and strategy of Adani Energy Solutions Limited (“AESL”),the future outlook and growth prospects, and

  40. Slide 40: Thank You

    Slide 40: Thank You

    Thank You STRICTLY CONFIDENTIAL