Bonterra Resources, Inc. · TSXV:BTR

Bonterra Resources — Investor Presentation (July 2020)

38 slides from Bonterra Resources's investor presentation, Jul 7, 2020

  1. Slide 1: Developing Québec's Next Gold Camp

    TSX-V BTR | OTCQX BONXF | FSE 9BR2 Developing Québec’s NEXT GOLD CAMP Exploration and Resource Expansion in the URBAN-BARRY CAMP July 2020 1 RBC Capital Markets

  2. Slide 2: Forward-Looking Statements

    Forward-Looking Statements This presentation contains "forward-looking information" within the meaning of Canadian securities legislation. Any information herein with respect to predictions, expectations, projections, objectives, assumptions or future events that are not historical facts may be "for

  3. Slide 3: Investment Highlights

    Investment Highlights Opportunity to invest in a multi-million ounce, strategic land package in Quebec’s next gold camp Strategic Land Package in Quebec’s Next Gold Camp  >8.5 Moz resource within rapidly growing Urban-Barry / Windfall Camp  Three 100% owned, high-grade underground gold deposits (G

  4. Slide 4: Quebec | Top Tier Mining Jurisdiction

    Quebec | Top Tier Mining Jurisdiction Quebec is responsible for approximately 2.5% of annual world gold production Ranked in the top 20 mining jurisdictions in the World Excellent local infrastructure and highly qualified labour force Clear and Consistent permitting process Rule of Law enforces secu

  5. Slide 5: Bonterra Overview | Land Position

    Bonterra Overview | Land Position Extensive land package on the prolific Abitibi Greenstone Belt Bachelor Mill BACHELOR PROPERTY 15,550 hectares MOROY PROJECT M&I 667,000T @ 5.17 g/t Au: 111,000 oz Inferred 396,000T @ 4.32 g/t Au: 55,000 oz URBAN-BARRY PROPERTY 22,500 hectares BARRY PROJECT Indicate

  6. Slide 6: Capital Structure

    Capital Structure Strong cash position Kirkland Lake Gold Market capitalization per 11.0% Wexford Capital resource ounce of ~US$40 16.3% Ruffer LLP 5.0% Eric Sprott VanEck 4.7% Capital Structure BTR Investment Co. Sprott Inc Issued & Outstanding Shares 77.5M 6.1% 3.1% Options 4.5M Other CDPQ 48.2% 2

  7. Slide 7: Management & Board of Directors

    Management & Board of Directors Pascal Hamelin Johnny Oliveira Marc Ducharme Cesar Gonzalez Interim CEO Chief Financial Officer Principal Geologist Chairman & Director Mr. Hamelin holds a Mining Engineering Degree Mr. Oliveira has 20 years of experience in the Mr. Ducharme has over 30 years of geolo

  8. Slide 8: Land Position in the Abitibi Greenstone Belt

    Land Position in the Abitibi Greenstone Belt Fenelon

  9. Slide 9: Strategic Location of the Bachelor Mill

    Strategic Location of the Bachelor Mill Only permitted mill in the heart of the Urban-Barry Camp 5.14 MOz Windfall

  10. Slide 10: Mineral Resources

    Mineral Resources NI 43-101 Mineral Resource Estimate - May 28, 2019 MEASURED INDICATED INFERRED DEPOSIT Tonnes Au (g/t) Ounces Au Tonnes Au (g/t) Ounces Au Tonnes Au (g/t) Ounces Au Gladiator - - - 743,000 8.46 202,000 3,065,000 9.10 897,000 Barry - - - 2,052,000 5.84 385,000 2,740,000 5.14 453,000

  11. Slide 11: Gladiator Project

    ” Gladiator Project BON !ERRA TSX-V BTR 4 OTCQX BONXF 4 FSE 9BR2 1

  12. Slide 12: Gladiator Accessibility & Infrastructure

    Gladiator Accessibility & Infrastructure Site Access  ~185 km north-northeast of Val-d’Or in the province of Quebec, Canada  Property is accessible from Lebel-sur- Quevillon through well-maintained logging roads Infrastructure  On-site camp suited for current work force  Core logging, splitting

  13. Slide 13: Gladiator Block Model

    Gladiator Block Model Gold Resource Block Model Indicated: 743,000 t @ 8.5 g/t, 202,000 oz Inferred: 3,065,000 t @ 9.1 g/t, 897,000 oz Vertical Long Section Looking Northwest, Resource Block Model, All Lenses Projected to Section

  14. Slide 14: Gladiator Resource Geology

    Gladiator Resource Geology Vertical Cross Section Looking Southwest with Selected 2020 Results and Up-Dip Target Area

  15. Slide 15: Gladiator Resource Geology

    Gladiator Resource Geology Priority Target Area

  16. Slide 16: Gladiator Resource Geology

    ” Gladiator Resource Geology |+5431500 N i i i i aor] [r5az6500 5431500 Hi] 5ADESOO ; ; — | H é A 3 iE boon 3 i i a EH TS Diorite [J intermediate Voicanics HEI cabbro [1 sediments GS Felsic Dyke HS Matic Voicanics FelsicVoicanics [EE utramafics TSX-V BTR 4 OTCQX BONXF 4 FSE 9BR2 16

  17. Slide 17: Gladiator Regional Targets

    Gladiator Regional Targets Airborne Magnetics, Interpreted Structure, and Location of Resource Domain Extension Targets

  18. Slide 18: Gladiator Project Timeline

    Gladiator Project Timeline 2020 2021 JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG Deposit Modelling Targeting and Drill Strategy Infill Drilling Resource Extension Drilling Resource Update Decline Permits Portal preparation Decline Excavation Underground Drilling

  19. Slide 19: Barry Project

    ” Barry Project BON !ERRA TSX-V BTR 4 OTCQX BONXF 4 FSE 9BR2

  20. Slide 20: Barry Accessibility & Infrastructure

    Barry Accessibility & Infrastructure Site Access  ~185 km north-northeast of Val-d’Or in the province of Quebec, Canada  Property is accessible via ~110 km of well- maintained logging roads from Lebel-sur- Quevillon Infrastructure  On-site camp; revamped in 2018 to accommodate bulk sampling opera

  21. Slide 21: Barry Block Model

    Barry Block Model Gold Resource Block Model Indicated: 2,052,000 t @ 5.8 g/t; 385,000 oz Inferred Resources: 2,740,000 t @ 5.1 g/t; 453,000 oz Vertical Long Section Looking Northwest, Resource Block Model, All Lenses Projected to Section

  22. Slide 22: Barry Block Model Cont'd

    Barry Block Model Cont’d 2019 Drill Intercept

  23. Slide 23: Barry Underground Drill Results

    Barry Underground Drill Results 2019 Drill Intercept

  24. Slide 24: Barry IP Survey

    Barry IP Survey Barry Deposit Plan Map with IP (Chargeability) Contoured, Lakes and 2019 Extensional Drilling Intercepts with Prioritized Domain Extension Targets 2019 Drill Intercept

  25. Slide 25: Barry Air Mag Survey

    Barry Air Mag Survey Pre get i a 5427000 * “A Legend on [CO ricry 2020 target 0a Ea at i Residual Total Magnetic Intensity (aT) “128-50 81-36-32 .29 24 -19 -12 4 3.814 24 37 5375113 | 00.125 0.25 08 we roa we TSX-V BTR 4 OTCQX BONXF 4 FSE 9BR2 25

  26. Slide 26: Barry Project Timeline

    Barry Project Timeline 2020 2021 JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG Deposit Modelling Targeting and Drill Strategy Resource Extension Drilling to the East Resource Extension Drilling to the West Resource Update Decline to 200m depth Underground Drilling Underground Bulk Samp

  27. Slide 27: Moroy Project

    Moroy Project BON!ERRA TSX-V BTR 4 OTCQX BONXF 4 FSE 9BR2 OH

  28. Slide 28: Moroy Accessibility & Infrastructure

    Moroy Accessibility & Infrastructure Site Access  225 km northeast of Val-d’Or in the province of Quebec, Canada  Accessible via Highway 113 from Val-d’Or  3.5 km from Desmaraisville township; serviceable by bus and truck transport Infrastructure  Shaft, headframe, hoistroom, compressor room and

  29. Slide 29: Moroy Resource Geology

    Moroy Resource Geology Measured and Indicated: 667,000 t @ 5.17 g/t, 111,000 oz Inferred: 396,000 t @ 4.32 g/t, 55,000 oz Vertical Cross Section Looking East. Moroy Block Model with Selected Results from 2018 Underground Drilling and Location of M4, M5, M6 & M7 Zones Bachelor Mine Moroy Deposit Hist

  30. Slide 30: Moroy Deposit Cross Section

    ” Moroy Deposit Cross Section BON!ERRA Bachelor “a Shear Level 3 F J mo-r9-232 239/457 (609/160) Mo-19-232 ts K 602/146 15.27 / 3.39) —Level —_ \ 491/676 MO-19-186 (21/266) 435/823 Levelt (700/341) wnie-sse 642/7128 eee (13.86 / 4.94) 71038 A 18,09 /360) gene Level 14 1099.83) 8 M7 $019.88 Shear Lev

  31. Slide 31: Moroy M1 Zone Longitudinal Section

    Moroy M1 Zone Longitudinal Section

  32. Slide 32: Moroy M4 Plan View

    ” Moroy M4 Plan View Volcanic Rocks MY19-177 0.19/0.61~ (e ee ™ 100m Pp Legend SF Sh, 0-05 i Sar 03-10 i) 10-30 [| — 30-50 Bp 50-100 Tt 100 Hm Historical Holes . New intercepts ® . ID: 2019/2020 O'Brien | correo Intrusive ttn (including gon) oro Longnti.em min. Nogilition MYI9-175 My20-192 . 0.45/5.

  33. Slide 33: Moroy Regional Targets

    Moroy Regional Targets BON ERRA Residual Total Magnetic Intensity (n 7128 -50_-41_ -36_-32_-29 -24 -19 -12 -4 3814 24 37 53 75 113 “Jo 4 I ptt & Showing / DDH Intercept (rv aczorgetsvea 2230 4 5 TSX-V BTR 4 OTCQX BONXF 4 FSE 9BR2 33

  34. Slide 34: Moroy Regional Targets Cont'd

    Moroy Regional Targets Cont’d

  35. Slide 35: Moroy Project Timeline

    Moroy Project Timeline 2020 2021 JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG Deposit Modelling Targeting and Drill Strategy Resource Extension Drilling Underground Drilling Resource Update Underground Bulk Sampling Program Feasibility Study Obtain Mining Lease 35

  36. Slide 36: Bachelor Lake Mill

    Bachelor Lake Mill Mill permitting process began in April 2017 to increase the existing mill capacity from 800 to 2,400 tpd Project Scope: Remove existing 10x12 rod mill, 3 small ballmills Add a SAG mill (6.4 m x 4.0 m, 2,240 kW) Add one ball mill ( 4.7 m x 6.4 m, 2,238 kW) Add a 75 ft thickener Add

  37. Slide 37: Bachelor Lake Mill Expansion Timeline

    Bachelor Lake Mill Expansion Timeline 2020 2021 JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG Environmental Impact Study submitted in Q4 2019 Ministry Permitting review Mill Detail Design Tailing Design Detail permitting Tailing Expansion Sept 2021 Feasibility Study Mill Construction

  38. Slide 38: Appendix

    Appendix Model Parameters 1. The classification of the current Mineral Resource Estimates into Measured, Indicated and Inferred are consistent with current 2014 CIM Definition Standards - For Mineral Resources and Mineral Reserves 2. Mineral resources which are not mineral reserves do not have demon

Bonterra Resources — Investor Presentation (July 2020) on 6ix