Ausgold Limited · ASX:AUC

Ausgold — 2015 Precious Metals Investment Symposium

16 slides from Ausgold's conference presentation, Oct 26, 2015

  1. Slide 1: Viability of the KGP Becoming Apparent

    For personal use only Viability of the KGP Becoming Apparent 2015 Precious Metals Investment Symposium

  2. Slide 2: Competent Persons Statement & Disclaimer

    Competent Persons Statement & Disclaimer For personal use only Competent Person’s Statement The information in this report that relates to Exploration Results is based on information compiled by Miss Melanie Sutterby and Mr Stephen Thomas, who are Members of the Australasian Institute of Mining and

  3. Slide 3: Ausgold Overview & Projects

    Ausgold Overview & Projects For personal use only Four prospective projects in emerging mineral provinces  Katanning  Significant Gold Resource covered by ML’s  Doolgunna Station  Along trend from Sandfire Resources DeGrussa operations  Project covers over 5 km strike length of prospective Jenk

  4. Slide 4: Ausgold Limited Capital Structure

    Ausgold Limited Capital Structure For personal use only ISSUED CAPITAL (as at 30/09/15) Ordinary shares on issue 265.2M Unlisted options 1 19M Market Capitalisation A$10M Top 20 shareholders 65% Note: 1. Price A$0.07-A$1.45 expiring between 6 December 2015 and 31 December 2017 SHAREHOLDERS (as at 30

  5. Slide 5: Katanning Gold Project - Overview

    Katanning Gold Project - Overview For personal use only  Katanning Gold Project (KGP), South-West, Western Australia  100% ownership of Greenstone Belt; ~2,000 sqkm of tenure  NNW trending Katanning Greenstone Belt in west of Archaean Yilgarn Block (Boddington +30M oz)  20km corridor of gold min

  6. Slide 6: Global Resource Inventory

    Global Resource Inventory 2015 JORC compliant* Lode Measured Indicated Inferred Totals For personal use only Mt Au g/t Koz Mt Au g/t Koz Mt Au g/t Koz Mt Au g/t Koz Jinkas Main Lodes 2.37 2.15 164 1.00 1.13 36 0.75 0.89 21 4.13 1.67 221 Jinkas HW Lodes 0.22 1.10 8 0.76 1.02 25 0.49 0.91 14 1.47 1.00

  7. Slide 7: Jinkas RC Drilling

    Jinkas RC Drilling For personal use only  Advances in understanding of mine geology – high grade cores to mineralisation  Stronger mineralisation on upper and lower contacts of felsic granulite units  Mineralisation appears open down-plunge, and along strike to the North and East  Recent results

  8. Slide 8: Jinkas Resource Block Model – Plan View

    Jinkas Resource Block Model – Plan View Jinkas Main Hanging Wall Jinkas Main Foot Wall For personal use only Potential high grade shoot extensions Potential high grade shoot extensions 8

  9. Slide 9: Jinkas Resource Model – Long Sections

    Jinkas Resource Model – Long Sections Main Hanging Wall Surface. Inset – plan view For personal use only Jinkas Waste Dump S Jinkas Pit N 200mRL Potential high grade shoot extensions Main Foot Wall Surface. Inset – plan view Material remaining in pit Jinkas Pit Potential high grade shoot projection

  10. Slide 10: Jinkas Resource Model – Cross Sections

    Jinkas Resource Model – Cross Sections For personal use only Resource Block Model Gold Grade - 18660mN Resource Block Model Gold Grade - 18720mN Jinkas Pit BSRC0690 Surface 200mRL 200mRL 200mRL 10

  11. Slide 11: White Dam Main Surface – Resource Model

    White Dam Main Surface – Resource Model S N Long Section For personal use only 400mRL Surface 200mRL Potential high grade shoot extensions Plan Cross Section 18240mN Adamellite Jinkas Pit 20400mE 200mRL 11

  12. Slide 12: Exploration Upside

    !( Exploration Upside !( !( !( 6289350 6289350 !( !( !( For personal use only !( 582800 583250 !( !( 583700 584150 584600 585050 !( !( (! !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !(  !( !( !( !( New exploration model suggests potential for repetition

  13. Slide 13: Preliminary Scoping Study

    Preliminary Scoping Study For personal use only  Scoping Study Underway for the KGP  SRK Consultants:  Whittle Pit optimisations on Jinkas  Mine scheduling & operating costs  CPC Engineering:  Review of earlier metallurgical studies (AMTEC & Gecko Systems)  Process Plant & Infrastructure requ

  14. Slide 14: Summing Up & Investor Milestones

    Summing Up & Investor Milestones For personal use only Ausgold’s ambition is to become an emerging gold producer Ausgold is committed to advancing the Jinkas and Dingo Projects towards production  Drilling supports historical data = higher confidence dataset for Resource Update  Scoping and Pre-Fe

  15. Slide 15: Doolgunna – Emerging Mineral Province

    Doolgunna – Emerging Mineral Province For personal use only  Recent exploration success at the Monty discovery within the Sandfire Resources (ASX.SFR) / Talisman Mining (ASX.TLM) Springfield JV project renewed interest in the region  The Monty discovery is 10km from Sandfire’s DeGrussa copper mine

  16. Slide 16: Thankyou

    Thankyou For personal use only  Picture of 1 tonne of gold (1 ounce of Au = 31.1 grams)  637,000 ounces X 31.1 = 19.8M grams = approximately 20 tonnes of Au! 16

Ausgold — 2015 Precious Metals Investment Symposium on 6ix