Platinum Group Metals Ltd. · TSX:PTM

Platinum Group Metals — Non-Deal Roadshow (October 2006)

18 slides from Platinum Group Metals's roadshow presentation, Oct 21, 2006

  1. Slide 1: Platinum Group Metals Ltd. - The Path to Production

    PLATINUM GROUP METALS LTD. Date: October 21, 2006 Europe Institutional Road Show October 23-27/06 R. Michael Jones P.Eng President and CEO PTM:TSX The Path to Production

  2. Slide 2: Disclosure

    Disclosure This presentation is prepared by Platinum Group Metals Ltd (“PTM”) management and PTM is solely responsible for content and format. R. Michael Jones P.Eng is a non-independent Qualified Person and has compiled this presentation from industry information and 43-101 reports and new releases

  3. Slide 3: Why PTM?

    Why PTM? • PTM is the operator for a bankable feasibility study on a large- scale platinum resource near surface (37%) (Western Bushveld Joint Venture) • Extraordinary Room to Grow (37%) • Anglo Platinum, the world’s leading platinum producer is a partner and an equal contributor to the projects (26

  4. Slide 4: Essential and Precious Platinum

    Essential and Precious Platinum • For everyday manufactured goods • Clean air standards – tailpipe of your car • 35 times rarer than gold • 79% production from unique Bushveld region in South Africa PTM:TSX The Path to Production

  5. Slide 5: PTM:TSX

    PTM:TSX The Path to Production

  6. Slide 6: Platinum - Annual Global Consumption - 6.7M Ozs

    PLATINUM – ANNUAL GLOBAL CONSUMPTION – 6.7M Ozs 15% 35% 19% North America China 1,020,000 Ozs 1,250,000 Ozs Europe 2,320,000 Ozs 19% Autocatalyst 12% Jewelry Rest of the World Japan Manufacturing PTM:TSX 1,290,000 Ozs 826,000 Ozs The Path to Source: Johnson Matthey ‘Platinum 2005’, May 2005 & Johnso

  7. Slide 7: Platinum - Annual Global Production - 6.5M Ozs

    PLATINUM – ANNUAL GLOBAL PRODUCTION – 6.5M Ozs Russia (2 mines) 6% 850,000 Ozs 13% North America (3 mines) 390,000 Ozs Zimbabwe (2 mines) 2% 150,000 Ozs 70% Western Bushveld Eastern & Northern Bushveld South Africa (5 mines) South Africa (12 mines) 9% 580,000 Ozs 4,500,000 Ozs PTM:TSX The Path to So

  8. Slide 8: Platinum Territory

    Platinum Territory PTM:TSX The Path to Production

  9. Slide 9: WBJV Resources to Date

    WBJV Resources to Date PTM:TSX The Path to Production

  10. Slide 10: Resources

    Resources Inferred and Indicated Resources are reported. The US Securities and Exchange Commission does not recognize the reporting of Inferred Resources. These resources are reported under Canadian National Instrument 43-101 and have a great amount of uncertainty and risk as to their existence and

  11. Slide 11: Measured Resources WBJV

    Measured Resources WBJV Updated 15 September, 2006 Independent Estimate: Project 1 Million Cut-Off Million Grade Mining Width Tonnes Ounces (cm g/t) Tonnes g/t (4E) (metre) PGM (4E) PGMs (4E) MR FPP (*1) 100 2.186 7.11 1.24 15.542 0.500 UG2 (*3) 100 2.266 3.35 1.47 7.591 0.244 Total Measured 4.452 5

  12. Slide 12: Indicated Resources

    Indicated Resources Updated 15 September, 2006 Independent Estimate: Project 1 Million Cut-Off Million Grade Mining Width Tonnes PGM Ounces (cm g/t) Tonnes g/t (4E) (metre) (4E) PGMs (4E) MR FPP (*1) 100 14.933 6.46 1.26 96.467 3.102 MR CR (*2) 300 0.183 5.68 1.01 1.040 0.033 UG2 (*3) 100 25.168 2.9

  13. Slide 13: Inferred Resources

    Inferred Resources Updated 15 September, 2006 Independent Estimate: Project 1 Million Cut-Off Million Grade Mining Width Tonnes Ounces (cm g/t) Tonnes g/t (4E) (metre) PGM (4E) PGMs (4E) MR FPP (*1) 100 3.257 6.56 1.22 21.366 0.687 MR CR (*2) 300 0.002 3.50 1.00 0.007 0.0002 UG2 (*3) 100 11.792 3.48

  14. Slide 14: GIMV of South African Mines & Deposits

    GIMV of South African Mines & Deposits Note: Does not include capital or operating cost considerations • coming PTM:TSX The Path to Production

  15. Slide 15: WBJV Project 1

    WBJV Project 1 PTM:TSX The Path to Production

  16. Slide 16: WBJV Project 1 Mine Design

    WBJV Project 1 Mine Design 20 year mine plan vertical shaft Declines considered Merensky to start 250,000 oz/yr 92,500 oz/yr PTM Preliminary Concept Only –See Scoping Study August 2005 Sedar for Details –Updates underway for Pre-feasibility PTM:TSX The Path to Production

  17. Slide 17: Project 2 and Project 3

    Project 2 and Project 3 2006 project strategy to expand resource to new areas of WBJV to NW Wesizwe 40,000 metres drilling budgeted 2006 PTM:TSX The Path to Production

  18. Slide 18: Value

    Value Shares Issued: 56,206,247 Warrants: 2,800,000 (@ C$2.10, to Mar ’07) 1,100,000(@ C$1.75, to April ‘07) 850,0000 (@ C$ 1.75 to March ’08) Options: 3,192,875 (@ C$0.95 average) Fully Diluted: 64,149,122; Market Capitalization: US$80M PTM stands out on : Tonnes, Grade, Platinum ratio, Depth and S

Platinum Group Metals — Non-Deal Roadshow (October 2006) on 6ix