Chalice Gold Mines — Investor Presentation (May 2011)
29 slides from Chalice Gold Mines's investor presentation, May 2011
Slide 1: Corporate Presentation May 2011
E it ’ Next Eritrea’s N t Gold G ld Miner Mi Corporate Presentation May 2011 www.chalicegold.com
Slide 2: Disclaimer and Competent Persons Statement
Disclaimer and Competent Persons Statement This presentation may contain value references and "forward looking statements“ which are subject to various risks and uncertainties that could cause actual results and future events to differ materially from those expressed or implied by such statements. I
Slide 3: Chalice Gold Mines – Project Overview
Chalice Gold Mines – Project Overview A gold exploration & development company focused in Eritrea Value underpinned by the high‐grade, low cost Zara Gold Project Feasibility completed, permitting underway Open pit ‐ 760,000oz Ore Reserve @ 5.1g/t Au Average annual project production of 104,000oz ove
Slide 4: Corporate Snapshot and Capability
Corporate Snapshot and Capability ASX: CHN; TSX: CXN Capital Structure Share Price Movement 80 Share price A$0.41 70 Shares on issue 218 million 60 Cents per share 50 Market capitalisation ~A$90 A$90 million 40 Options on issue 7 million 30 20 Debt ‐ 10 Cash ~A$4 A$4 million 0 May10 Jul10 Sep10 Nov1
Slide 5: The Opportunity – by cash cost
The Opportunity – by cash cost 6 800 Cash Costs Grade (g/t) 5 700 655 Reserve Grade (g/t) Cash Costss (US$/oz) 577 4 600 533 525 514 492 3 500 467 466 2 400 369 338 1 300 0 200 Teranga Cluff Avocet Centamin Noble Adamus Perseus SEMAFO Banro Chalice 5
Slide 6: Current Comparative Market Valuation
Current Comparative Market Valuation 800 700 600 EV / Reserrve (A$/oz) 500 400 300 200 100 ‐ Banro Chalice Centamin Perseus Adamus Teranga Noble Cluff Avocet SEMAFO 6
Slide 7: The Arabian-Nubian Shield
The Arabian‐Nubian Shield Centamin Sukari Equinox Jabal Sayid 15 year 10 year 500 koz pa Au 61 kt pa Cu La Mancha Chalice Hassai Zara Nevsun Sunridge 6 year 7 year Bisha Asmara 156 koz pa + VMS 104 koz pa Au >10 year 5 year Au, Ag, Cu, Zn Cu Zn Ag Au The Zara Project is located within southern Arabi
Slide 8: Significant Ground Position
Significant Ground Position Chalice Zara 840 000 ozs Au 840,000 A Nevsun Bisha 1Mozs Au, 30Mozs Ag 750Mlbs Cu, 1Blbs Zn 8
Slide 9: The Mine Site
The Mine Site 9
Slide 10: Koka Gold Deposit
Koka Gold Deposit Indicated Resource of contained gold 840,000 , Oz ~600m strike length Probable Reserve of contained gold 760,000 Oz (within resource) *Both based on 1.2 g/t cut‐off 10
Slide 11: Koka Generates Significant Cash for Chalice (60%)
Koka Generates Significant Cash for Chalice (60%) 2014 2015 2016 2017 2018 2019 2020 2021 $' $'m $' $'m $' $'m $' $'m $' $'m $' $'m $' $'m $' $'m Totall Revenue 31 113 100 83 73 61 62 61 585 Cash Costs (19) (23) (23) (22) (23) (17) (16) (8) (150) Royalties (2) (6) (5) (4) (4) (3) (3) (3) (29) Taxes
Slide 12: Koka – Feasibility Study Production Profile
Koka – Feasibility Study Production Profile 160 900 Enamco (40%) 140 800 CHN (60%) Cash Costs 120 700 600 100 uction ('000 oz's) 500 oz) 80 Caash costs (US$/o Produ 400 60 300 40 200 20 100 ‐ ‐ 2014 2015 2016 2017 2018 2019 2020 2021 Financial years ended 30 June 12
Slide 13: Koka – Feasibility Study Cost Profile
Koka – Feasibility Study Cost Profile Operating p g Cost Estimates Average mining costs (incl. pre‐strip) $/t mined 2.01 Processing cost $/t milled 24.78 General and administration $/t milled 7.36 Refining charges $/t milled 0.63 Refining $/recoverable oz charges Processing costs ($/t milled) $4.00
Slide 14: Koka Development Schedule
Koka Development Schedule Calendar Year 2010 2011 2012 2013 Quarter Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Maiden Reserve Feasibility Study COMPLETED Release 43‐101 TSX listing Zara Permitting Funding Period Construction Pre‐Strip First Production 14
Slide 15: Exploration Potential
Exploration Potential Zara North BLEG & ‐80# gold anomalies Rock‐chips to 27.5 g/t Au Tenement Boundary Koka 840,000 oz Resource 3D IP Survey & Soil Konate Sampling Intersections to 7m @ 22.3g/t 2 km 15
Slide 16: Koka 3D IP – Near Mine Targets
Koka 3D IP – Near Mine Targets Long Section 7.5km 16
Slide 17: Koka 3D IP – Priority Targets Koka & Koka East
Koka 3D IP – Priority Targets Koka & Koka East W E 17
Slide 18: Koka 3D IP – Priority Targets Konate & Fah
Koka 3D IP – Priority Targets Konate & Fah W E 18
Slide 19: Soil Sampling – northern Zara Tenements
Soil Sampling – northern Zara Tenements Assays received Extensive drainage gold anomalism Assays pending identified on Zara North & Central EL’s ‐ gold values up to 876ppb Regional scale high Regional‐scale high‐strain strain zone with carbonate‐sericite alteration and quartz veining Soil sampling c
Slide 20: Hammid Kier Prospect
Hammid Kier Prospect 20 LEGEND A Rockchip >1git Au SOppb Au 200ppb Au
Slide 21: New Data - Aeromagnetics & Radiometrics
New Data ‐ Aeromagnetics & Radiometrics 21
Slide 22: Hurum Exploration Licence
Hurum Exploration Licence >40ppb Au 10- 40ppb Au Hurum EL granted January 5 -10ppb Au 0 - 5ppb Au 2011 Results pending Exploration completed to date: Airborne Magnetics & Radiometrics Stream sediment BLEG & ‐80# sampling Regional geological mapping Babtono b Prospect identified id ifi d Detailed map
Slide 23: Mogoraib North Exploration Licence
Mogoraib North Exploration Licence Located ~10 km north of Nevsun’s Bisha VHMS Project Area 555 sq km G l i l setting Geological i similar i il to Bisha Bi h Landsat spectral p signatures g similar to Bisha VTEM survey to commence May 2011 ‐ ~4000 line kilometres 23
Slide 24: Exploration Timeline
Exploration Timeline Exploration program to generate strong news flow Exploration l program totaling l ~$10M $ expected d Calendar Year 2011 Quarter Q1 Q2 Q3 Q4 Induced Polarisation (IP) Survey Aero‐Magnetics & Radiometrics VTEM Geochemical Sampling & Geological Mapping Drilling – Koka IP targets 10
Slide 25: Summary
Summary Value of Company underpinned by Koka Gold Deposit Advanced high grade gold deposit Feasibility completed Strong economics Low technical risk Mine permitting in progress Strategic ground position in emerging gold & base metal province Aggressive exploration programs underway to expand current
Slide 26: Analysts Covering the Chalice Story
Analysts Covering the Chalice Story Australia Europe Southern Cross Equities Ambrian Partners Limited Peter Chapman E: adam.kiley@ambrian.com T: +44 (20) 7634 4777 E: pchapman@sceq.com.au T: +612 9231 0880 Paterson Securities Limited Simon Tonkin E: STonkin@psl.com.au T: +618 9225 2816 Argonaut Limi
Slide 27: Corporate Contact Details
Corporate Contact Details Tim Goyder Dr Douglas Jones Dan Hrushewsky Joanne Jobin Executive Chairman Managing Director Senior VP – Corporate Development Investor Relations – North America M: +61 418 942 908 M: 61 438 872 090 M: +1 647 864 2735 M: +1 647 964 0292 tgoyder@chalicegold.com djones@chalic
Slide 28: Appendix 1: Eritrea Mining Act Summary
Appendix 1: Eritrea Mining Act Summary Prospecting licence Royalties One year, not renewable & not transferrable 5% for precious metals and 3.5% for other Maximum size 100km2 metallic minerals Licence fee (US)$33.33 Annual rental (US)$3.33/km2 Government Participation 10% free-carried interest at th
Slide 29: Appendix 2: ENAMCO Interest
Appendix 2: ENAMCO Interest The Government of Eritrea, via the Eritrean National Mining Corporation (ENAMCO) has a 10% free‐carried interest in the Zara Project. In addition, ENAMCO has the right to acquire a further 30% paid participating interest in the project. The participating interest is to be