  1. Slide 1: Ashton Coal Operations Community Consultative Committee Presentation – 29 November 2016

    Ashton Coal Operations Pty Ltd Community Consultative Committee Presentation – 29 November 2016

  2. Slide 2: Action List

    Action List ITEM RESPONSIBILITY PROGRESS UPDATE Tree Screen at New England Hwy requires maintenance DS Nothing to report at this stage Poor housekeeping at two privately tenanted, Ashton owned DS Routine inspections completed in early residences, in Camberwell requires addressing November. 2 20 Dece

  3. Slide 3: Ashton Coal Key Statistics

    Ashton Coal Key Statistics Ashton Coal Key Statistics • Complaint Received on 2016 Budget (YTD) 2016 Actual 11/09/2016 at 11:00am ROM (t) 1,706,062 1,690,666 regarding dozer and engine Product Coal (t) 758,975 781,308 noise. A review of ACOL operations indicated that Total Coal Sales (t) 781,350 844

  4. Slide 4: Current Operations

    Current Operations • ACOL is currently mining in LW106A. LW106A is a short panel and we plan to move into LW201 in the third seam (Upper Lower Liddell) in arch-April 2017. • Development is continuing in the Upper Lower Liddell seam forming longwall blocks and main headings. • South East Open Cut – n

  5. Slide 5: Exploration Activities

    Exploration Activities No exploration was conducted in EL5860 or EL4918 during the reporting period. 5 20 December 2024 5

  6. Slide 6: Approvals Update

    Approvals Update As mining at ACOL progresses additional approvals are required to continue operations. Recent Approval determinations include: • DA Mod 5 • Environment Protection License Variation – Air Quality Monitoring Program Changes • Ausgrid LW106 Asset Management Plan Upcoming Approvals • LW

  7. Slide 7: DA Mod 5 – CCC Implications

    DA Mod 5 – CCC Implications • DA Mod 5 was prepared to allow for the integration of the Underground and SEOC approvals. • The recent approval updates/modernises the Ashton Coal consent • Some changes to the CCC may be required due to the amended CCC condition → 7 20 December 2024 7

  8. Slide 8: EPL Variation - Air Quality Monitoring Changes

    EPL Variation - Air Quality Monitoring Changes ▪ EPA implemented Upper Hunter Air Quality Monitoring Network ▪ Program has been in place for several years and is operating well ▪ EPA amending all Environmental Protection Licenses (EPL) to remove duplicate monitoring ▪ Ashton’s monitoring program wil

  9. Slide 9: South East Open Cut Project (SEOC)

    South East Open Cut Project (SEOC) ▪ At law, an approval under the EP&A Act is a right and not an obligation hence it is up to the proponent to decide if and when it chooses to “take up” the approval. ▪ Only at this time should the approval be enlivened and conditions become enforceable. ▪ Ashton is

  10. Slide 10: South East Open Cut Project (Cont’d)

    South East Open Cut Project (Cont’d) ▪ The Modification would be administrative in nature and would seek to: • Impose a condition that requires Ashton to formally notify the Secretary (Planning) of its intention to commence development – development could only commence when the Secretary agreed that

  11. Slide 11: Environment Monitoring Data

    Environment Monitoring Data ▪ The following slides present environmental monitoring data for the reporting period ▪ Meteorological • Rainfall ▪ Air Quality • Depositional Dust Gauges – Total suspended dust • PM10 – Tapered Element Oscillating Microbalance (TEOM) ▪ Surface Water – Glennies Ck, Bowman

  12. Slide 12: Rainfall

    Rainfall YTD Rainfall: 640mm 12 20 December 2024 12

  13. Slide 13: Air Quality & Noise Monitoring Locations

    Air Quality & Noise Monitoring Locations 13 20 December 2024 13

  14. Slide 14: Depositional Dust

    Depositional Dust On-site Dust Gauges 14 20 December 2024 14

  15. Slide 15: Total Suspended Dust

    Total Suspended Dust 15 20 December 2024 15

  16. Slide 16: Total Suspended Dust

    Total Suspended Dust 16 20 December 2024 16

  17. Slide 17: PM10 Dust – Site 1

    PM10 Dust – Site 1 17 20 December 2024 17

  18. Slide 18: PM10 Dust – Site 2

    PM10 Dust – Site 2 18 20 December 2024 18

  19. Slide 19: PM10 Dust – Site 3

    PM10 Dust – Site 3 19 20 December 2024 19

  20. Slide 20: PM10 Dust – Site 8

    PM10 Dust – Site 8 20 20 December 2024 20

  21. Slide 21: Surface Water Sampling Locations

    Surface Water Sampling Locations 21 20 December 2024 21

  22. Slide 22: Surface Water Quality – pH

    Surface Water Quality – pH 22 20 December 2024 22

  23. Slide 23: Surface Water Quality – EC

    Surface Water Quality – EC 23 20 December 2024 23

  24. Slide 24: Surface Water Quality – pH

    Surface Water Quality – pH 24 20 December 2024 24

  25. Slide 25: Surface Water Quality – EC

    Surface Water Quality – EC 25 20 December 2024 25

  26. Slide 26: Surface Water Quality – pH

    Surface Water Quality – pH 26 20 December 2024 26

  27. Slide 27: Surface Water Quality – EC

    Surface Water Quality – EC 27 20 December 2024 27

  28. Slide 28: Groundwater Sampling Locations

    Groundwater Sampling Locations 28 20 December 2024 28

  29. Slide 29: Groundwater – Standing Depth

    Groundwater – Standing Depth 29 20 December 2024 29

  30. Slide 30: Groundwater – EC

    Groundwater – EC 30 20 December 2024 30

  31. Slide 31: Noise Monitoring

    Noise Monitoring Attended noise monitoring is conducted Monthly. There were no exceedances during the reporting period 31 20 December 2024 31

  32. Slide 32: What else is going on?

    What else is going on? ▪ Upper Hunter Mining Dialogue Stakeholder Annual Forum ▪ Muswellbrook Race Club ▪ CCC members invited to attend – contact Jo Casci at NSW MC jcasci@nswmining.com.au 32 20 December 2024 32

  33. Slide 33: Camberwell update

    Camberwell update ▪ Camberwell property • 31 homes tenanted, 2 vacant • Safety audit of electrical wiring completed for all homes 33 20 December 2024 33

  34. Slide 34: Community Support Program

    Community Support Program ▪ Community projects supported by Ashton Coal during the 2nd half of 2016 include: Macquarie University Motor Neuron Disease Weston Community Preschool Maintenance to sandpit Singleton Amateur Swimming Club Lockers Singleton Neighbourhood Centre The open door @ SNC Witmore

  35. Slide 35: Yancoal Clontarf Partnership

    Yancoal Clontarf Partnership ▪ Rolling three-year corporate sponsorship arrangement with the Clontarf Foundation ▪ Clontarf Foundation is about improving the education, discipline, self-esteem, life skills and employment prospects of young Aboriginal men ▪ Clontarf Academy has recently been establis

  36. Slide 36: Environmental Excellence award

    Bowmans Creek Diversion Winner of 2016 Environmental Excellence award ▪ K:\28 ADMINISTRATION\19 Conferences\2016 NSW Minerals Council HSEC Awards\08 Award video 36 20 December 2024 36

  37. Slide 37: Any Questions?

    Any Questions? 37 20 December 2024 37