Yangarra Resources Ltd. · TSX:YGR

Yangarra Resources — Investor Presentation (March 2016)

20 slides from Yangarra Resources's investor presentation, March 2016

  1. Slide 1: Corporate Presentation March 2016

    Corporate Presentation March 2016 TSX: TSX:YGR YGR

  2. Slide 2: Corporate Snapshot

    Corporate Snapshot Capitalization Reserves and Locations (2) Ticker TSX: YGR mmboe NPV10 ($mm) Shares Outstanding (mm) Proved Developed 5.6 $97.9 Basic 67.7 Total Proved 24.7 $315.9 Options (weighted avg. price $1.83) 6.1 2P 40.6 $499.5 Fully Diluted 74.0 Total Cardium Locations 462 Gross (270 Net)

  3. Slide 3: Corporate Strategy

    Corporate Strategy • Establish Sustainability • Target and maintain 2,750 – 3,000 boe/d and continue building deep inventory for when commodity prices turn • Prepare for future growth • Acquire Cardium land at the low-end of the cycle • Consolidate partner interests • Secure infrastructure capacity

  4. Slide 4: People

    People Management Team Jim Evaskevich, President & CEO Randall Faminow, VP, Land • 30+ years extensive executive experience with strong • 30+ years of experience in all aspects of oil and gas land work, operations background including negotiation, acquisitions and divestments, contracts and mergers

  5. Slide 5: Why Own Yangarra?

    Why Own Yangarra? • Top Decile Full Cycle rates of return • Low-cost operator, high netbacks • Low-cost philosophy, not just a result of current low commodity prices • Central Alberta Cardium formation focus • Large future drilling inventory • Consistent, low risk Cardium economics TSX: YGR 5

  6. Slide 6: Full Cycle Returns

    Full Cycle Returns • Capital allocation is determined based on narrowing the gap between half cycle and full cycle returns Half Cycle IRR ⁽¹⁾ Full Cycle IRR ⁽²⁾ Full Cycle with Duvernay 90% 80% 70% 60% 50% IRR 40% 79% 67% 65% 30% 20% 41% 44% 34% 31% 33% 31% 24% 26% 27% 10% 12% 0% 2010 2011 2012 2013

  7. Slide 7: F&D and Recycle Ratios

    F&D and Recycle Ratios Finding and Development Recycle Ratios $40.00 7.0x $35.00 6.0x $30.00 5.0x $25.00 4.0x $/boe $20.00 3.0x $15.00 2.0x $10.00 $5.00 1.0x $- 0.0x 2010 2011 2012 2013 2014 2015 2010 2011 2012 2013 2014 2015 Proven F&D P+P F&D Proven Recycle P+P Recycle • Consistent improvement in,

  8. Slide 8: Low-Cost Producer, Low-Cost Driller

    Low-Cost Producer • Company founded on a low cost operations Netback Analysis ($/boe) philosophy $60.00 • Consistent low cost mentality in high and low $50.00 commodity price environments $40.00 • We own and operate our facilities resulting Realized Price⁽¹⁾ in lower operating costs (no hidden fees

  9. Slide 9: Updated Completion Technology

    Updated Completion Technology • Cemented liners and sliding sleeve • Tighter well frac spacing Completion Stages and Costs 30 $250,000 • Increased ability to target fracs • Better frac isolation, 25 • No longer losing energy to packers $200,000 • Improved initial rates Number Of Stages 20 Cost per S

  10. Slide 10: Average 1-mile Well Costs ($M)

    Average 1-mile Well Costs ($M) $6,000 $5,000 473 $4,000 1,807 373 Equip $3,000 298 Complete 1,376 273 173 Drill 1,187 $2,000 1,134 970 2,832 $1,000 2,134 1,563 1,808 1,578 $0 2011 2012 2013 2014 2015 Monobore Drilling Cemented Completions Service Costs Reductions Extended Reach TSX: YGR 10

  11. Slide 11: Cardium Formation

    Cardium Formation • Interest in 100+ sections • 85+ horizontal wells drilled • Secured firm capacity on gas systems • Increased firm capacity from 0 in 2014 to 6.0 Yangarra mmcf/d currently Field Office Red Deer 80 km Rocky Mountain House TSX: TSX:YGR YGR 11

  12. Slide 12: Cardium Drilling Inventory

    Cardium Drilling Inventory (1) Drilling Locations (1-mile laterals) Proportionate (gross locations) 500 450 115 North 78 Ferrier 400 Locations Willesden 350 Green 84 2-mile Locations Locations 212 1-mile Locations 300 Locations 250 200 269 150 Willesden Green 100 Locations 38 1.5-mile 50 Locations 0

  13. Slide 13: Risk Management Program

    Risk Management Program Oil Hedges 2016: 400 bbl/d costless collar C$73.45 WTI/bbl and a ceiling of C$85.00 WTI/bbl 2016: 400 bbl/d Edmonton par to WTI differential at US$3.95/bbl 2016: 200 bbl/d at C$54.00 WTI/bbl April – June 2016 Interest Rate Swaps 4.70% Fixed rate on $10 million (June 2014-June

  14. Slide 14: Analyst Coverage

    Analyst Coverage Acumen Capital Finance Partners Limited FirstEnergy Capital Corp. Trevor Reynolds Michael Hearn, CA Oil and Gas Research Analyst Research Analyst - Exploration & Production treynolds@acumencapital.com mjhearn@firstenergy.com (403) 410-6842 (403) 444-8273 AltaCorp Capital Inc. Indust

  15. Slide 15: Appendix

    on Itd. Appendix TSX: YGR 15

  16. Slide 16: Glauconite Formation

    Glauconite Formation TSX: YGR 16

  17. Slide 17: Duvernay South Block

    Duvernay South Block TSX: YGR 17

  18. Slide 18: Forward-looking Statements

    Forward-looking Statements Statements in this presentation may contain forward-looking information including expectations of future production and components of cash flow and earnings. Forward looking statements or information are based on current expectations, estimates and projections that involve

  19. Slide 19: Reserve Definitions

    Reserve Definitions Natural gas has been converted to a barrel of oil equivalent (Boe) using 6,000 cubic feet (6 Mcf) of natural gas equal to one barrel of oil (6:1), unless otherwise stated. The Boe conversion ratio of 6 Mcf to 1 Bbl is based on an energy equivalency conversion method and does not

  20. Slide 20: Yangarra Resources Ltd.

    Yangarra Resources Ltd. 1530, 715 – 5 Ave. SW Calgary, Alberta T2P 2X6 403-262-9558 TSX: YGR 20

Yangarra Resources — Investor Presentation (March 2016) on 6ix