  1. Slide 1: AI infrastructure in the places others overlook

    INVESTOR PRESENTATION AI infrastructure in the places others overlook. SEPTEMBER 2026 BLACKJACK 30 MW total (planned) ROCKWOOD 10 MW total BRICKYARD 15 MW total TRUCKSTOP 50 MW total (planned) ILLUSTRATIVE SITE CONCEPTS / TOTAL SITE POWER 01

  2. Slide 2: Disclaimer

    Disclaimer No Offer or Solicitation. This presentation has been prepared by Sphere 3D Corp., doing business as DarkHorse Technologies (the "Company"), for informational and discussion purposes only. It does not constitute an offer to sell, or the solicitation of an offer to buy, any securities of th

  3. Slide 3: Investment Summary – Building the Platform

    Investment Summary – Building the Platform 01 Secured and Growing Power 50 MW operating across TVA plus a 100+ MW pipeline; energized sites skip multi-year interconnection queues. 02 Hidden Value in Existing Assets Legacy Bitcoin mining footprint is expected to create an infrastructure base to conve

  4. Slide 4: Valuation Disconnect – Market Cap per MW

    Valuation Disconnect – Market Cap per MW DarkHorse trades at $0.43M per MW, roughly one-third of the small-cap peer median and a fraction of AI/HPC-weighted names. Market Cap / MW = market capitalization ÷ latest disclosed operating, active, developed or managed MW; definitions vary by company. Medi

  5. Slide 5: DarkHorse overview

    01 DarkHorse overview INVESTOR PRESENTATION / SEPTEMBER 2026 05

  6. Slide 6: Power-First Digital Infrastructure Platform

    Power-First Digital Infrastructure Platform 50 MW Operating Capacity 100+ MW Potential Expansion Pipeline 4 Data Centers Power Footprint Across Energy-Rich Regions: KY, TN Selective AI / HPC Conversion Active opportunities Competitive Economics ~$49/MWh All-In-Power Cost Our strategic focus is to mo

  7. Slide 7: We already own what the queue can't produce

    P L A T F O R M · T H E D A R K H O R S E A P P R O A C H We already own what the queue can't produce Bitcoin mining was the entry point. It left DarkHorse with energized megawatts, utility relationships, and modular build muscle. Exactly the inputs an AI factory needs. T H E O R I G I N · H O W W E

  8. Slide 8: MW operating. 100+ MW in sight

    P L A T F O R M · P O R T F O L I O O V E R V I E W 50 MW operating. 100+ MW in sight A S S E T S T A T E G R I D S T A T U S C U R R E N T M W E X P A N D A B L E T O P l a n n e d U s e Brickyard 15 MW total Kentucky TVA OPERATING 15 MW - AI Inference Hosting Blackjack 30 MW total* Kentucky TVA OP

  9. Slide 9: Leadership Built for the Infrastructure Transition

    Leadership Built for the Infrastructure Transition Tim Hanley | Chairman Deloitte & Touche, former Senior Partner; audit, risk & operational leadership Kurt Kalbfleisch | CFO | Director PubCo Finance + Governance Tom Masiero | Head of Strategy Power Development & Infrastructure Tiah Reppas | CAO Acc

  10. Slide 10: A Best-In-Class Technical Advisory Bench

    A Best-In-Class Technical Advisory Bench EA Advisors adds site-level technical diligence, hyperscale design perspective, and access to experienced design/build/operator networks as DRK evaluates AI/HPC monetization across its portfolio. Prior company experience of EA Advisors principals; shown for c

  11. Slide 11: Market opportunity

    02 Market opportunity INVESTOR PRESENTATION / SEPTEMBER 2026 11

  12. Slide 12: Everyone needs powered land. Few have it

    MACRO · THE RACE FOR POWERED LAND Everyone needs powered land. Few have it 01 · THE DE MAND 3.2 Quadrillion AI tokens processed monthly by Google alone (May 2026) Inference has gone vertical. Google's token volume is up ~330× in 24 months, and Goldman Sachs projects a further 70× rise in monthly vol

  13. Slide 13: Demand For Power Continues to Accelerate

    Demand For Power Continues to Accelerate Source: Morgan Stanley Research Estimates for GOOGL, AMZN, META, MSFT, and ORCL Hyperscaler Capex Growth Projections $261B $449B $805B $1,116B 2024A 2025A 2026E 2027E Hyperscaler Demand Rapidly Outgrowing Power Supply Global DC capacity demand 82 GW → 219 GW

  14. Slide 14: Fastest Growing Data Center Markets in the US

    Fastest Growing Data Center Markets in the US 64% of new US data-center construction is in secondary/frontier markets 18% data centers as a share of TVA industrial load in 2025, projected to double by 2030 4–7 yrs typical U.S. grid-interconnection queue in core markets, energized TVA sites skip the

  15. Slide 15: Development pipeline

    03 Development pipeline INVESTOR PRESENTATION / SEPTEMBER 2026 15

  16. Slide 16: Four sites. AI infrastructure concepts.

    DEVELOPMENT / SITE CONCEPTS Four sites. AI infrastructure concepts. Blackjack 30 MW Total site power (planned) Modular conversion with battery storage Rockwood 10 MW Total site power Modular conversion with battery storage Brickyard 15 MW Total site power Modular conversion with battery storage Truc

  17. Slide 17: Development that pays its way

    COMMUNI TY · VALUE-ADD Development that pays its way The backlash screens out developers who extract. DarkHorse builds the case for yes into the project itself: tax base, grid value, and shared infrastructure. WHY THE COMMUNI TY WI NS ($38M) T AX B ASE The host community's real-property assessments

  18. Slide 18: Execution and capitalization

    04 Execution and capitalization INVESTOR PRESENTATION / SEPTEMBER 2026 18

  19. Slide 19: Phased Operating Plan

    Phased Operating Plan 1 2 3 Optimize Integrate Cathedra Stabilize the platform Preserve mining + hosting revenue base Complete site-level readiness review Qualify & Convert Identify sites suitable for AI / HPC Advance active HPC / AI opportunities Secure first anchor customer / pilot Define capex, t

  20. Slide 20: The megawatt is the ingredient. Compute is the product

    E C O N O M I C S · T H E R E V E N U E L A D D E R The megawatt is the ingredient. Compute is the product We buy energized, overlooked power in the 10–50 MW range hyperscale ignores, put it to work the day we own it, then climb every megawatt up a revenue ladder. Mining pays the bills. AI factories

  21. Slide 21: Capital Strategy

    Capital Strategy 01 Capital Need Growth capital to fund identified site development and expansion, sized to the near-term pipeline and tied to milestones 02 Preferred Structures JV, project-level SPV, structured preferred, or milestone-based convertible preferred 03 Partner Profile Infrastructure ca

  22. Slide 22: Investment Summary – Building the Platform

    Investment Summary – Building the Platform 01 Secured and Growing Power 50 MW operating across TVA plus a 100+ MW pipeline; energized sites skip multi-year interconnection queues. 02 Hidden Value in Existing Assets Legacy Bitcoin mining footprint is expected to creates an infrastructure base to conv

  23. Slide 23: Appendix

    05 Appendix INVESTOR PRESENTATION / SEPTEMBER 2026 23

  24. Slide 24: Fully Diluted Shares Outstanding

    Fully Diluted Shares Outstanding APPENDIX INVESTOR PRESENTATION / SEPTEMBER 2026 24 Fully Diluted Series I Preferred Shares Series H Preferred Shares Stock Options Restricted Stock Units Unexercised Warrants Shares Issued and Outstanding Common Shares and Equivalents at September 11, 2026 10,569,496

  25. Slide 25: Blackjack site concept

    APPENDIX / SITE CONCEPT Blackjack 30 MW total site power (planned) Modular conversion concept with battery storage. AI-generated concept rendering. Layout, terrain, access and equipment remain subject to engineering. INVESTOR PRESENTATION / SEPTEMBER 2026 25

  26. Slide 26: Rockwood site concept

    APPENDIX / SITE CONCEPT Rockwood 10 MW total site power Compact modular conversion concept with battery storage. AI-generated concept rendering. Layout, terrain, access and equipment remain subject to engineering. INVESTOR PRESENTATION / SEPTEMBER 2026 26

  27. Slide 27: Brickyard site concept

    APPENDIX / SITE CONCEPT Brickyard 15 MW total site power Modular conversion concept with separate battery storage. AI-generated concept rendering. Layout, terrain, access and equipment remain subject to engineering. INVESTOR PRESENTATION / SEPTEMBER 2026 27

  28. Slide 28: Truckstop site concept

    APPENDIX / SITE CONCEPT Truckstop 50 MW total site power (planned) Two-story building concept with battery storage. AI-generated concept rendering. Layout, terrain, access and equipment remain subject to engineering. INVESTOR PRESENTATION / SEPTEMBER 2026 28