Kingsgate Consolidated Limited · ASX:KCN

Kingsgate Consolidated — Corporate Update (May 2024)

7 slides from Kingsgate Consolidated's corporate update, May 31, 2024

  1. Slide 1: Chatree Update Webinar

    Chatree Update Webinar 31 May 2024

  2. Slide 2: Agenda

    Agenda 1. Welcome and introduction 2. Chatree Operations 3. Chatree Geology 4. Q&A

  3. Slide 3: Chatree Operations

    Chatree Operations Processing • Plant 1 commissioning ongoing, with first gold pour scheduled to occur in early June • Plant 2 continuing to operate above nameplate capacity, with consistently high recoveries Mining • Blasting occurring 3-4 times per week • Cut back has commenced in Pit A West CAT e

  4. Slide 4: Mine and Resource Geology

    Chatree Mine and Resource Geology Mine Geology • Ore control drilling of double benches (36m) has commenced to optimise mine planning • Geological interpretation identified mineralisation (A Top Cut) outside current resource model. Rotary Air Blast (RAB) drilling completed • Reverse Circulation (RC)

  5. Slide 5: Brownfields Exploration Geology

    Chatree Brownfields Exploration Geology Prospectivity and Capability • Nine gold/silver exploration prospects and one gold/ copper porphyry exploration prospect within 20km of Chatree Mine • Highly experienced geologists with decades of local area knowledge • Rotary Air Blast (RAB) drilling conducte

  6. Slide 6: Kingsgate Consolidated Limited

    Kingsgate Consolidated Limited OQétA

  7. Slide 7: Contact Us

    Contact Us info@kingsgate.com.au kingsgate.com.au kingsgate-consolidated-limited