Enka Insaat Ve Sanayi A.s. · BIST:ENKAI

Enka Insaat Ve Sanayi A.s — Q1 2021 Earnings Presentation

47 slides from Enka Insaat Ve Sanayi A.s's earnings presentation, 2021

  1. Slide 1: 1st Quarter

    1st Quarter

  2. Slide 2: Introduction

    Introduction EXPERIENCE RELIABILITY EVALUATION 64 Years of construction 543 projects in 46 countries have been Traded publicly on experience worldwide completed or under construction with Borsa Istanbul (BIST) historical value of USD 51 Billion with a market cap of USD 5,4 Billion (@ 31.03.2021) SYN

  3. Slide 3: Milestones [1957-1976]

    Milestones [1957-1976] Founded Focused on The Partnership as a limited liability design, engineering and was transformed into a joint partnership as Şarık Tara & construction activities of stock company as Sadi Gülçelik Enka Limited industrial plants, buildings ENKA İnşaat ve Sanayi A.Ş. Şirketi and

  4. Slide 4: Milestones [1977-1996]

    Milestones [1977-1996] Foundation First Natural Gas Outstanding ENKA Sports, education and combined cycle power achievements with fast- culture foundation and Sadi plant in Turkey 600 MW track projects in Libya, Gülçelik sports center Trakya CCCP Russia and Former establishments Soviet Union Countri

  5. Slide 5: Milestones [1997-2020]

    Milestones [1997-2020] Retail Business Power Generation Certified Development of shopping Power Generation by BSI for ISO 9001 Quality malls and retail business in as Independent Power Management System & ISO Moscow, Russia Producer (IPP) 14001 Environmental Management System & OHSAS 18001 Occupatio

  6. Slide 6: Milestones [1997-2020]

    Milestones [1997-2020] Gas Fired CCPP EPC in Russia Airport 790 MW Rijnmond Natural ENKA as a main contractor Completion of Gas Fired CCPP has been has been awarded 400 MW Sheremetyevo Airport completed in 22 months by Yajva State District Power Terminal 3 in Moscow, the ENKA Bechtel Joint Plant EPC

  7. Slide 7: Milestones [1997-2020]

    Milestones [1997-2020] Iraq Re-Entry Northern Iraq Oil & Gas ENKA’s re-entry into Iraq oil First contract awarded in Northern Al-Najybia 500 MW gas & gas market by winning the Iraq after two decades turbine power plant and contract for mechanical, Rumaila Crude Oil Pumping electrical and Erbil Combi

  8. Slide 8: Milestones [1997-2020]

    Milestones [1997-2020] Caucasus Pipeline Motorway Projects Power Plants A contract related to South After successfully completing EPC contracts awarded; Caucasus Pipeline Expansion the Route 7 and the Route 6 Simple Cycle Power Plant (SCPX) has been awarded to Motorway Projects in Kosovo a Project a

  9. Slide 9: Mission, Vision and Values

    Mission, Vision and Values Mission Vision Values to design, build and deliver safe, high- to be one of the best and define how we do work at ENKA. We quality and cost-effective construction innovative engineering & will not undertake or execute a project projects on schedule for our customers constr

  10. Slide 10: Sustainability

    Sustainability ENKA, which operates in different sectors such as engineering and construction, energy, real estate and trade in many different geographies, has made a commitment to serve sustainable development in all its operations. The approach which ENKA has adopted to corporate sustainability is

  11. Slide 11: Sustainability

    Sustainability Doing Good Business Caring for Employees In carrying out its work honestly, in time and to the ENKA protects the health and ensures the safety of highest quality, ENKA ensures that a responsible and its employees and subcontractors. ethical approach is adopted at every level. ENKA wor

  12. Slide 12: Sustainability

    Sustainability Developing Communities Reducing Environmental Impact ENKA contributes to the welfare and development of ENKA measures and reports on its environmental local communities through its infrastructure and impact, sets targets and carries out improvements. superstructure investments. ENKA u

  13. Slide 13: Shareholder Structure

    Shareholder Structure 2,47% 5,87% 9,05% 31,44% 51,17% Address: Balmumcu Mah., Zincirlikuyu Yolu No: 10 Besiktas, Istanbul, Turkey 34349 Phone : +90 (212) 376 10 00 (pbx) Fax : +90 (212) 272 88 69 Web: www.enka.com E-mail: corporate.finance@enka.com 13 of 46

  14. Slide 14: Consolidated Financial Highlights

    Consolidated Financial Highlights 1Q 2021 2020 2019 2018 2017 TOTAL ASSETS 8.550 8.454 8.318 7.796 8.031 TOTAL EQUITY 6.716 6.694 6.568 6.103 6.207 CASH & MARKETABLE SECURITIES 4.672 4.406 3.960 3.252 3.479 REVENUE 486 1.659 1.893 2.881 2.900 EBITDA 184 386 436 757 745 EBITDA MARGIN 37,9% 23,3% 23,1

  15. Slide 15: Revenues by Business Lines

    Revenues by Business Lines 1Q 2021 2020 2019 2018 2017 USD % USD % USD % USD % USD % CONSTRUCTION 376 77,4 1.263 76,1 1.147 60,6 1.011 35,1 1.195 41,2 POWER GENERATION 0 0,0 0 0,0 324 17,1 1.474 51,2 1.337 46,1 REAL ESTATE 73 15,0 289 17,4 346 18,3 329 11,4 319 11,0 TRADE 51 10,5 154 9,3 119 6,3 165

  16. Slide 16: EBITDA by Business Lines

    EBITDA by Business Lines 1Q 2021 2020 2019 2018 USD % MRG USD % MRG USD % MRG USD % MRG CONSTRUCTION 142 77 38 201 52 16 142 33 12 209 28 21 POWER GENERATION (6) (3) - (17) (4) - 68 16 21 326 43 22 REAL ESTATE 43 23 59 187 48 65 213 49 62 204 27 62 TRADE 5 3 9 16 4 10 10 2 8 17 2 10 ELIMINATION 0 0

  17. Slide 17: Share Capital Increases (Shares Dividend-Bonus Issue)

    Share Capital Increases (Shares Dividend-Bonus Issue) PREVIOUS SHARE INCREASED SHARE DATE INCREASE INCREASE (%) CAPITAL CAPITAL 25.05.2012 2.500 300 12,00 2.800 12.06.2013 2.800 400 14,29 3.200 21.05.2014 3.200 400 12,50 3.600 06.05.2015 3.600 400 11,11 4.000 23.05.2016 4.000 200 5,00 4.200 27.04.20

  18. Slide 18: Dividend Payments

    Dividend Payments GROSS CASH DIVIDEND D.P.F.S.* YEAR DATE NET RATE RATE TL USD TL USD 28.09.2016 3,33% 2,83% 140 47,1 0 0 2016 14.12.2016 3,33% 2,83% 140 40,3 0 0 19.04.2017 12,00% 10,81% 504 136,8 29,4 7,97 2016 TOTAL 27.09.2017 3,59% 3,05% 165 46,2 0 0 2017 13.12.2017 4,00% 3,40% 184 48,0 0 0 17.0

  19. Slide 19: Share Buy Back

    Share Buy Back Decision Taken Share Amount to be Bought Number of Total Shares Percentage July 2016 8,4 Million 4,2 Billion 0,20% July 2017 4,6 Million 4,6 Billion 0,10% August 2017 4,6 Million 4,6 Billion 0,10% January 2018 4,6 Million 4,6 Billion 0,10% May 2018 4,6 Million 4,6 Billion 0,10% June 2

  20. Slide 20: Work Force

    Work Force ENKA TURKEY Technical : 396 Administrative : 129 ENKA ABROAD Workers : 72 ENKA Abroad Total : 597 Technical : 767 Administrative : 447 Workers : 13.968 Total : 15.182 SUBSIDIARIES TURKEY Technical : 685 Administrative : 431 SUBSIDIARIES Workers : 1.807 Total : 2.923 ABROAD Technical : 34

  21. Slide 21: Awards & Achievements

    Awards & Achievements YAJVA ADMIRED COMPANY ENKA’s 411 MW CCPP Yajva State "Most Admired Construction District Power Plant EPC Project has Company of Turkey awards" for the been awarded “the Best Project in the years 2005 - 2012 by CAPITAL, a Power/Industrial Category” in 2013 business and economics

  22. Slide 22: Awards & Achievements

    Awards & Achievements RISK MANAGEMENT DEVELOPMENT Turkish Power Company ENKA POWER Kuntsevo Plaza, has been awarded in has world class risk management article three categories of the prestigious which praises ENKA's commitments and awards in 2016: Best Retail Architecture achievements in protecting

  23. Slide 23: Address:

    Address: Balmumcu Mah., Zincirlikuyu Yolu No: 10 Besiktas, Istanbul, Turkey 34349 Phone : +90 (212) 376 10 00 (pbx) Fax : +90 (212) 272 88 69 Web: www.enka.com E-mail: corporate.finance@enka.com 23 of 46

  24. Slide 24: Engineering & Construction

    Engineering & Construction The fields of Engineering & ENKA’s global solutions span Construction activities are; the entire project life cycle: • Oil & Gas Facilities, Pipelines Engineering, • Petrochemical Plants Fabrication, • Power Plants Procurement, • Industrial Plants Construction, • Airports,

  25. Slide 25: Backlog as of March 31st, 2021

    Backlog as of March 31st, 2021 Country Backlog % Russia 754 22.7 Serbia 555 16.7 Special Projects 391 11.8 Libya 388 11.7 Kazakhstan 350 10.6 Turkey 147 4.4 Iraq 107 3.2 Bahamas 71 2.2 Mexico 38 1.1 Others 517 15.6 Total 3.319 100 All figures given above are in Million US Dollars Address: Balmumcu M

  26. Slide 26: Selected Projects Under Construction

    Selected Projects Under Construction Samawa and Dhi Qar Combined Cycle Power Plant Projects Job Owner : Ministry of Electricity Location : Samawa (293 Km Northwest of Basra) Nasiriyah (230 Km Northwest of Basra) ENKA Share : USD 505 Million (1st Phases) ENKA, with its partner General Electric, will

  27. Slide 27: Selected Projects Under Construction

    Selected Projects Under Construction PJSC Nizhnekamskneftekhim 495 MW CCGT-TPP Job Owner : PJSC Nizhnekamskneftekhim, a member of TAIF Group Location : Nizhnekamsk, Republic of Tatarstan - Russia Siemens signed a contract for building 495 MW natural gas fired combined cycle power plant on a turnkey

  28. Slide 28: Selected Projects Under Construction

    Selected Projects Under Construction FGP 3GP Mechanical, Electrical & Instrumentation Installation Works Tengiz, Kazakhstan Job owner : Tengizchevroil Contractor : Senimdi Kurylys (Bechtel – ENKA Joint Venture with equal shares) Senimdi Kurylys LLP has been awarded a contract for mechanical, electri

  29. Slide 29: Selected Projects Under Construction

    Selected Projects Under Construction Kazan 250 MW Combined Cycle Power Plant Kazan, Tatarstan, Russian Federation Job owner : PJSC Kazanorgsintez (Member of the TAIF Group) In October 2019, Siemens signed a contract with PJSC Kazanorgsintez, a member of the TAIF Group, for the delivery, installation

  30. Slide 30: Selected Projects Under Construction

    Selected Projects Under Construction Morava Corridor Motorway Project Pojate – Preljina, Serbia Job owner : Government of the Republic of Serbia Ministry of Construction, Transport and Infrastructure ENKA and its joint venture partner Bechtel have been selected by the Government of the Republic of S

  31. Slide 31: Selected Projects Under Construction

    Selected Projects Under Construction St. Petersburg High-Technological Multifunctional Medical Complex (HMMC) Russian Federation ENKA commenced work in 2019 on design and construction of a High-Technology Multifunctional Medical Complex (HMMC) Project in St. Petersburg in the Russian Federation. The

  32. Slide 32: Selected Projects Under Construction

    Selected Projects Under Construction Marine Works in Prince George Wharf, Nassau, the Bahamas Job owner : Nassau Cruise Port Limited (NCPL) Contractor : ENKA Construction and Development B.V. NCPL proposes to reinvigorate the current tourism infrastructure in Nassau by boosting the cruise ship arriv

  33. Slide 33: Selected Projects Under Construction

    Selected Projects Under Construction Zainskaya 858 MW Combined Cycle Power Plant - Zainsk / Tatarstan, Russian Federation Job owner : Joint Stock Company “Tatenergo” The scope of work awarded to ENKA consists of design and survey works, construction and installation works, commissioning works, compr

  34. Slide 34: Selected Projects Under Construction

    Selected Projects Under Construction Tripoli West 671 MW & Misurata 650 MW Simple Cycle Power Plants - Libya Job owner : General Electricity Company of Libya For meeting the growing electricity demand of Libya, ENKA and its consortium partner Siemens signed contracts with General Electricity Company

  35. Slide 35: Address:

    Address: Balmumcu Mah., Zincirlikuyu Yolu No: 10 Besiktas, Istanbul, Turkey 34349 Phone : +90 (212) 376 10 00 (pbx) Fax : +90 (212) 272 88 69 Web: www.enka.com E-mail: corporate.finance@enka.com 35 of 46

  36. Slide 36: Real Estate Portfolio

    Real Estate Portfolio TYPE SIZE (NLA) OCCUPANCY RATE Class A Office Area * 370.000 m2 87% USD 570/m2/year Retail Area 364.000 m2 93% USD 275/m2/year 5 Star Hotel 235 Rooms ** ** All assets are located in Moscow, except 1 shopping center which is located in St.Petersburg. * In 2020, a building of 23.

  37. Slide 37: Address:

    Address: Balmumcu Mah., Zincirlikuyu Yolu No: 10 Besiktas, Istanbul, Turkey 34349 Phone : +90 (212) 376 10 00 (pbx) Fax : +90 (212) 272 88 69 Web: www.enka.com E-mail: corporate.finance@enka.com 37 of 46

  38. Slide 38: Real Estate Revenue & EBITDA

    Real Estate Revenue & EBITDA YEAR RENTAL REVENUE EBITDA EBITDA MARGIN 1Q 2020 73 43 58,9% 2020 289 187 64,7% 2019 346 213 61,6% 2018 329 204 62,0% 2017 319 193 60,5% 2016 319 223 69,9% 2015 382 267 69,9% All figures given above are in Million US dollars Address: Balmumcu Mah., Zincirlikuyu Yolu No:

  39. Slide 39: Real Estate – Some Tenants

    Real Estate – Some Tenants Address: Balmumcu Mah., Zincirlikuyu Yolu No: 10 Besiktas, Istanbul, Turkey 34349 Phone : +90 (212) 376 10 00 (pbx) Fax : +90 (212) 272 88 69 Web: www.enka.com E-mail: corporate.finance@enka.com 39 of 46

  40. Slide 40: Real Estate New Investments

    Real Estate New Investments Investment projects of ENKA TC (Fully owned by ENKA) 1 Total Investment: USD 484 Million Total Area: 245.000 m2, Net Leasable Area: 90.000 m2 29.000 m2 Office and 61.000 m2 Retail Completion: 2015 2 Total Investment: USD 232 Million Total Area: 196.750 m2, Net Leasable Ar

  41. Slide 41: Real Estate Further Investments

    Real Estate Further Investments 1 Existing shopping center is planned to be demolished. Total Investment: USD 335 Million Total Area: 245.000 m2, Net Leasable Area: 105.000 m2 2 3 A-Class offices including Multi-storey Car Park Project A-Class offices including Multi-storey Car Park Project Total In

  42. Slide 42: Address:

    Address: Balmumcu Mah., Zincirlikuyu Yolu No: 10 Besiktas, Istanbul, Turkey 34349 Phone : +90 (212) 376 10 00 (pbx) Fax : +90 (212) 272 88 69 Web: www.enka.com E-mail: corporate.finance@enka.com 42 of 46

  43. Slide 43: Power Generation Overview

    Power Generation Overview 3 gas-fired combined cycle power plants (total 3.854 MW) Gebze 1.554 MW Adapazarı 777 MW Izmir 1.523 MW Annual generation is 32 Billion Kwh net and the annual natural gas consumption is around 6.5 Billion CBM, Capability of meeting 11% of Turkey’s total demand, since Turkey

  44. Slide 44: Power Generation Debt Funding

    Power Generation Debt Funding COMMITTED AMOUNTS TOTAL PROJECT FINANCE TOTAL Total Debt (75%) 1.530 US EXIM, USA 860 Total Equity (25%) 510 OPIC, USD 300 Total Project Cost 2.040 HERMES, GERMANY 185 OND, BELGIUM 125 OTHER BANKS 60 TOTAL 1.530 All outstanding project finance loans have been fully paid

  45. Slide 45: Turkey’s Energy Production

    Turkey’s Energy Production 2019 2020 SOURCES Million Kwh % Million Kwh % Coal 112,856 39.0 106,265 36.5 Hydro 88,571 30.6 77,834 26.8 Natural Gas 54,817 18.9 68,073 23.4 Wind 21,491 7.4 24,487 8.4 Geothermal 8,229 2.8 9,316 3.2 Others 4,191 1.5 4,800 1.7 International (Net) (558) (0.2) (547) (0.2) T

  46. Slide 46: Turkey’s Energy Demand

    Turkey’s Energy Demand BILLON KWH CHANGE 12% 275 10% 8% 225 6% 4% 175 2% 0% 125 -2% 127 133 141 150 161 175 190 198 194 210 230 242 246 255 264 275 290 292 290 291 75 -4% Address: Balmumcu Mah., Zincirlikuyu Yolu No: 10 Besiktas, Istanbul, Turkey 34349 Phone : +90 (212) 376 10 00 (pbx) Fax : +90 (21

  47. Slide 47: ENKA İnşaat ve Sanayi A.Ş.

    İNŞAAT VE SANAYİ A.Ş. Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul Tel: +90 (212) 376 10 00 (pbx) Fax: +90 (212) 272 88 69