Xenora Minerals Limited · ASX:XRA
Xenora Minerals — Todd River Resources — Investor Presentation (July 2021)
29 slides from Xenora Minerals's investor presentation, July 2021
Slide 1: Targeted exploration of base and precious metals in Australia
Targeted exploration of base and precious metals in Australia Investor Presentation July 2021
Slide 2: Disclaimer
Disclaimer • This presentation has been prepared by Todd River Resources Ltd. This document contains background information about Todd River Resources Ltd current at the date of this presentation. The presentation is in summary form and does not purport to be all inclusive or complete. Recipients sh
Slide 3: Corporate Overview
Corporate Overview Capital Structure Major Shareholders ASX Code TRT S2R (Southern Star) 13.9% Shares on Issue 554m 13.9% Marlee Minerals 11.7% Options on Issue (most at 6c) 103.1m Share price (30 June 2021) 8.2cps Moonknight 6.1% 11.7% Market Capitalisation (fully diluted) $46m 62.2% Acorn 6.1% 6.1
Slide 4: Investment Highlights
Investment Highlights Key assets include five WA Projects Experienced Strong share Strong cash 100% owned underpin aggressive exploration register with the projects Ni-Cu-PGE Board featuring Top 20 owning position of and earn-in rights to a exploration strategy Will Dix (MD), approximately sixth whi
Slide 5: Experienced, hands-on team
Experienced, hands-on team Edward Fry Will Dix Mark Bennett Stuart Crow Ian Murray Non-Executive Chairman Managing Director Non-Executive Director Non-Executive Director Edward has extensive experience Will is a geologist with 25 years’ Mark is a geologist with 30 years’ Non-Executive Director Ian h
Slide 6: Current Projects
Current Projects Targeted Nickel and Copper Exploration throughout WA and NT
Slide 7: Key Asset Overview
Key Asset Overview NANUTARRA (Earning up to 80%) Mt HARDY (100% TRT) ▪ Large unexplored ultramafic intrusion ▪ Hendrix inferred resource of prospective for Ni-Cu-PGE sulphides 2.6Mt @ 10.5% Zn eq* ▪ Large area of conductance to be followed up and ▪ Resource open at depth and to the south drilled in
Slide 8: Upcoming Activity Timeline
Upcoming Activity Timeline PROJECT April May June July August September Q4 2021 Initial Drilling of Geochem and Crop in the ground Geophysical Anomalies RESULTS RECEIVED AND RC follow up and Eastern Nickel-Copper-PGE PLANNING FOR ROUND 2 limited exploration to November Trend initial drilling Berkshi
Slide 9: Berkshire Valley Project
Berkshire Valley Project Nickel, Copper and PGE Project | 100% owned
Slide 10: Project Overview
Berkshire Valley | Nickel, Copper and PGE Project | 100% owned Project Overview ▪ 100km north of Chalice’s Julimar discovery and only 160km north of Perth ▪ 270km2 granted tenure +40Km strike of target stratigraphy ▪ Geologically and geometrically analogous with the Julimar Project ▪ Associated anom
Slide 11: The Julimar Analogy
Berkshire Valley | The “Julimar Analogy” The extent of mafic-ultramafic rocks at Berkshire Valley based on magnetic imagery and interpretation are comparable in size to the sequence of intrusives at CHN’s Julimar discovery. Scales are the same 1 block = 10 sq Km 10
Slide 12: Previous Exploration
Berkshire Valley | Previous Exploration | Auger Geochemistry Previous Exploration Previous Sampling Coverage ▪ Previous exploration for gold mainly between 2006-2009 ▪ Focused coverage was along 8Km of strike of the “western trend” ▪ Work restricted to auger geochemical sampling with limited aircore
Slide 13: New PGE Assays | Auger Geochemistry
Berkshire Valley | New PGE Assays | Auger Geochemistry Nickel Gridded (ppm) Copper Gridded (ppm) Combined PGE’s (ppb) Broad zone of PGE anomalism Coincident Ni-Cu-PGE anomalies 12
Slide 14: Berkshire Valley Exploration Initial Aircore Drilling
Berkshire Valley | Current Exploration | Western Trend Aircore Berkshire Valley Exploration Initial Aircore Drilling ▪ Systematic aircore drilling completed over the areas of the Western Trend where there is Ni-Cu- PGE geochemical anomalism ▪ Geology confirms a thick package of the “right” mafic to
Slide 15: Berkshire Valley Exploration – Eastern Trend
Berkshire Valley | Current Exploration | Eastern Trend Auger Geochemistry Berkshire Valley Exploration – Eastern Trend ▪ No previous exploration at all over the eastern mafic/ultramafic trend – TRT first with land access ▪ 1850 samples collected and prepared internally and XRF analysed prior to as s
Slide 16: Berkshire Valley Exploration – Eastern Trend
Berkshire Valley | Current Exploration | Eastern Trend Auger Geochemistry Berkshire Valley Exploration – Eastern Trend • Auger geochemical sampling along 7 kilometres of prospective strike on the Eastern Trend of mafic and ultramafic intrusions has returned two significant Ni-Cu-PGE anomalous areas;
Slide 17: Berkshire Valley Exploration – Geochemistry
Berkshire Valley | Current Exploration | Eastern Trend Auger Geochemistry Berkshire Valley Exploration – Geochemistry 250-300ppm 1.8Km 4Km Alluvial Channel 16
Slide 18: Berkshire Valley Exploration Compare CHN - TRT
Berkshire Valley | Current Exploration | Eastern Trend Auger Geochemistry Berkshire Valley Exploration Compare CHN - TRT • Large coherent anomalies in all 3 elements; • By far the best geochemistry seen to date is the Eastern Trend data released today; • Note the difference in extent and consistency
Slide 19: Nanutarra Project
Nanutarra Project Nickel and Copper Project | Earning up to 80%
Slide 20: Large ultramafic intrusion
Nanutarra | Nickel and Copper | Earning up to 80% Large ultramafic intrusion ▪ TRT has exclusive option to earn up to 80% by spending $2M over 3 years on exploration ▪ Large partly exposed Proterozoic mafic-ultramafic intrusion ▪ Permissive environment for Ni-Cu-PGE sulphides ▪ Strongly anomalous Ni
Slide 21: RC Drilling July 2021
Nanutarra | Nickel and Copper | Earning up to 80% RC Drilling July 2021 ▪ Detailed Fixed Loop EM survey completed ▪ Large area of increased conductance identified ▪ Sits adjacent to Anaconda drilling that contained anomalous PGE results ▪ Heritage survey completed in April 2021, permitting and flora
Slide 22: Other Projects
Other Projects Petermann Range | Mt Hardy | Pingandy | Nerramyne
Slide 23: Strong Focus on NT
Northern Territory Assets | Petermann Range Strong Focus on NT ▪ Over 6,000km2 of tenure under application with 3,200km2 to proceed to grant pending finalisation of Exploration Agreement – GOLD and COPPER FOCUSED ▪ Largest land position in the central Musgrave Province ▪ No exploration activities fo
Slide 24: Hendrix and Regional Exploration
Northern Territory Assets | Mt Hardy Hendrix and Regional Exploration ▪ Mineral Resource estimate at Hendrix 2.6Mt @ 10.5% Zn Equivalent* Hendrix Geological Wireframe ▪ Solid foundation for growth at Hendrix, which is open at depth and to the south ▪ Multiple regional targets successfully tested wit
Slide 25: Pingandy Base Metal Projects
Northern Territory Assets | Petermann Range Pingandy Base Metal Projects • 100% ownership of large landholding of 895 square kilometres with existing base metal anomalism in the Edmund Basin; • Covers the projected down dip extensions of the Blue Billy Formation, previously identified as a potential
Slide 26: Project Pipeline
Project Pipeline | Western Australia | 100% owned Project Pipeline ▪ 3 recently granted EL’s over targets generated by Marlee Minerals. ▪ Pingandy – a Sedex copper target in the Edmund Basin 220km southwest of Newman, in the basin adjacent to Rumble Resources’ Earaheedy Basin Project –GRANTED ▪ Nerr
Slide 27: Priorities for CY2021
Priorities for CY2021 Considered investment, focused projects
Slide 28: The Next Six Months
The Next Six Months NANUTARRA (Earning up to 80%) Mt HARDY (100% TRT) ▪ Fixed Loop EM Survey – COMPLETE ▪ Aircore drilling over the northern tenements – 2nd half 2021 ▪ Drilling targets or additional Geophysics – Q3 ▪ Follow up as required – Q3 & Q4 Alice Springs BERKSHIRE VALLEY (100% TRT) ▪ Aircor
Slide 29: trrltd.com.au
WILL DIX Managing Director 08 6166 0255 corporate@trrltd.com.au trrltd.com.au
Todd River Resources — Investor Presentation (July 2021) on 6ix