Anglo American Plc · LSE:AAL
Anglo American — Corporate Update (April 2021)
13 slides from Anglo American's corporate update, Apr 14, 2021
Slide 1: Liaison Group Forum April 2021 Construction Update
LIAISON GROUP FORUM APRIL 2021 Construction Update 1
Slide 2: WOODSMITH MINE – MARCH 2021
~ nN =) nN < O a <x = I Lu < = c FE = ap) a) O O S
Slide 3: Woodsmith Mine – March 2021
WOODSMITH MINE – MARCH 2021 3
Slide 4: Service Shaft
SERVICE SHAFT 4
Slide 5: Production Shaft
PRODUCTION SHAFT 5
Slide 6: Preparing the SBR
PREPARING THE SBR 6
Slide 7: Lockwood Site – February 2021
LOCKWOOD SITE – FEBRUARY 2021 7
Slide 8: Wilton Site – April 2021
WILTON SITE – APRIL 2021 8
Slide 9: Lady Cross Plantation Highways Works
LADY CROSS PLANTATION HIGHWAYS WORKS 9
Slide 10: Airborne Geophysical Survey
AIRBORNE GEOPHYSICAL SURVEY Measures the Earth’s gravity and magnetic fields, creating a 3D picture of the geology beneath the surface Started on 12 April and will take approximately two weeks Uses an aircraft flying at an average height of 100 metres Passive technique which does not involve sending
Slide 11: Thank You
THANK YOU 11
Slide 12: Mine in Production
MINE IN PRODUCTION Boulby Mine, UK PotashCorp, Canada 12
Slide 13: Mine in Production
MINE IN PRODUCTION Boulby Mine, UK PotashCorp, Canada 13