Beach Energy Limited · ASX:BPT

Beach Energy — Investor Day (November 2015)

82 slides from Beach Energy's investor day presentation, Nov 5, 2015

  1. Slide 1: Beach Energy Investor Morning

    Beach Energy Investor Morning Demonstrating resilience in a challenging market 5 November 2015

  2. Slide 2: Compliance statements

    Compliance statements Disclaimer This presentation contains forward looking statements that are subject to risk factors associated with oil, gas and related businesses. It is believed that the expectations reflected in these statements are reasonable but they may be affected by a variety of variable

  3. Slide 3: Welcome

    Welcome Time Topic Presenter 9.00 – 9.05 Welcome Derek Piper 9.05 – 9.15 Investor Relations Update Chris Jamieson 9.15 – 9.25 Overview Neil Gibbins 9.25 – 9.40 Proposed Drillsearch Merger Neil Gibbins 9.40 – 10.10 Operational Outlook Mike Dodd 10.10 – 10.20 Q&A 10.20 – 10.45 Morning Tea 10.45 – 11.0

  4. Slide 4: Investor Relations Update

    Investor Relations Update Chris Jamieson – Group Executive External Affairs

  5. Slide 5: Our refreshed vision, purpose and values

    Our refreshed vision, purpose and values Vision • To be Australia’s premier multi-basin upstream oil and gas company Purpose • To deliver sustainable growth in shareholder value Values • Safety: Takes precedence in everything we do • Creativity: Continuously explore innovative ways to create value •

  6. Slide 6: Share price performance

    Share price performance A challenging year across the sector $ 1.20 1.00 (28%) 0.80 (42%) (45%) 0.60 (50%) 1 Beach Peers Brent oil (US$) Brent oil (A$) 0.40 Oct-14NovNov-14DecDec-14Jan Jan-15FebFeb-15MarMar-15AprApr-15May May-15JunJun-15 Jul Jul-15 AugAug-15SepSep-15OctOct-15 2014 2015 NB. Chart dat

  7. Slide 7: Shareholder register perspectives

    Shareholder register perspectives October 2014 October 2015 Business model leveraged to oil recovery Investor Type 30% 32% Institutional 48%  Low cost / high margin Corporate Retail operated oil 1% 69% 20%  Increasing exposure to oil- linked gas pricing October 2014 October 2015  Balanced FY16 dr

  8. Slide 8: Liquidity trends

    Liquidity trends Chi-X platform accounting for a material portion of total trading volumes Share of Trading Volumes 100% 17.5%: Average Chi-X share of trading over past two years 80% Average Daily % of 60% Trading Volumes ASX Chi-X Total Issued (million) Capital1 Last 3 months 9.2 2.0 11.2 0.9% 40%

  9. Slide 9: Overview

    Overview Neil Gibbins – Acting Chief Executive Officer

  10. Slide 10: Four-pillar strategy

    Four-pillar strategy Optimise our core Build a Pursue other Maintain in the Cooper complementary compatible growth financial strength Basin gas business in opportunities in east coast basins Australia and nearby Growth in core Establish gas business Disciplined approach Supporting exploration, busin

  11. Slide 11: Cooper Basin acreage

    Cooper Basin acreage A prolific onshore hydrocarbon basin, with Beach gross acreage of c.50,000 km2 11

  12. Slide 12: Broad opportunity set in Cooper Basin

    Broad opportunity set in Cooper Basin • Maximise returns from existing assets – Safety improvements – Operating efficiencies – Facility upgrades and optimisation • Re-invigorate exploration – Comprehensive basin analysis – Unlock new play types – Technological advancements • Basin adjacencies – Cons

  13. Slide 13: Reserves and contingent resources

    Reserves and contingent resources1 2P: 74 MMboe 2P and 2C: 751 MMboe Gas and gas liquids 55 MMboe Unconventional 2P reserves 74 MMboe gas and gas liquids 589 MMboe Oil 19 MMbbl Conventional gas/gas liquids 75 MMboe Oil 13 MMbbl 1. As per announcement to the Australian Securities Exchange on 24 Augus

  14. Slide 14: FY16 capital expenditure guidance

    FY16 capital expenditure guidance Capital Expected Expenditure Other Major Activities Wells ($ million) DEVELOPMENT Cooper Basin 45 – 50 7–8 Bauer facility upgrade; Middleton gas compression Cooper Basin (SACB and SWQ JVs) 145 – 160 28 – 30 Connection of Windorah-Marama area development Total Develo

  15. Slide 15: Financial strength underpins operations

    Financial strength underpins operations • Operating cash flows of $303 million Pre-tax Operating Cash Flows $ million in FY15 (pre-tax) 640 Net operating cash flows 606 – Underpinned by high margin Tax payments Western Flank oil operations 480 • FY15 cash flows framed FY16 capital expenditure progra

  16. Slide 16: Proposed Drillsearch Merger

    Proposed Drillsearch Merger Neil Gibbins – Acting Chief Executive Officer

  17. Slide 17: Merger benefits

    Merger benefits Primed to pursue growth opportunities  • Creating a business based on expertise and a track record of growth • Balance Sheet strength allowing new opportunities to be pursued • A clear strategy and the ability to execute Significant benefits for both sets of shareholders  • • Both

  18. Slide 18: Combined Cooper Basin acreage

    Combined Cooper Basin acreage Proposed merger with Drillsearch would increase gross acreage to c.69,000 km2 18

  19. Slide 19: Leading ASX mid-cap oil and gas company

    Leading ASX mid-cap oil and gas company Enhanced scale with capacity to pursue organic and inorganic growth options • Potential for improved liquidity, possible market re-rating and dividend potential – good for shareholders • $313m in FY15 pro-forma operating cash flow, strong balance sheet – good

  20. Slide 20: Targeting synergies and operating efficiencies

    Targeting synergies and operating efficiencies Pre-tax synergies of ~$20 million per annum within two years1 • Blending the best talent from both companies 1 Operational • Optimisation of technical and field activities • Opportunities to high-grade the exploration portfolio • Elimination of duplicat

  21. Slide 21: Indicative timetable

    Indicative timetable Event Date ASX announcement of scheme 23 October 2015 First Court Date Early December 2015 Despatch Beach Notice of Meeting to Beach shareholders Early December 2015 (if required) Despatch Explanatory Booklet to Drillsearch shareholders and Mid December 2015 lodge with ASX Beach

  22. Slide 22: Operational Outlook

    Operational Outlook Mike Dodd – Acting Chief Operating Officer

  23. Slide 23: Existing footprint across multiple basins

    Existing footprint across multiple basins A re-aligned focus closer to home Cooper and Eromanga Basins Oil Gas Gas Liquids Tight Gas • Diversified hydrocarbon explorer Operated     and producer Non-operated     • Core expertise in the Cooper and Eromanga basins • Existing presence across oth

  24. Slide 24: Safety takes precedence

    Safety takes precedence Hours Worked and Lost Time Injuries Continual focus on safety, with over Hours 12 months of LTI-free operations (million) LTIs 1.5 8 • Ongoing safety communications with Beach employees and contractors • Review and refinement of HSE strategy 6 1.0 – Emergency response trainin

  25. Slide 25: Operations overview – Q1 FY16

    Operations overview – Q1 FY16 First quarter ended 30 September 2015 Actual and Forecast Production MMboe • Production of 2.3 MMbbl 10.0 9.6 – 50% oil; 50% gas and gas liquids 9.1 7.8 – 8.6 • Stunsail and Pennington facilities 8.0 commissioned 8.0 7.5 Gas* 4.4 Gas* – 20,000 bfpd each (25 PJe) 4.5 Gas

  26. Slide 26: Western Flank Ex PEL 91

    Western Flank Ex PEL 91 • FY15 gross production of 4.1 MMbbl Retention licences 151 to 172 granted (11,263 bopd) • Up to seven exploration, appraisal and development wells in FY16 – Bauer appraisal wells in Q2 FY16 to test northern and southern extensions • Bauer facility increase to 133,000 bfpd (+

  27. Slide 27: Western Flank Continuing evolution of the Bauer Field

    Western Flank Continuing evolution of the Bauer Field Pre-drill – July 2011 June 2015 Pre-drill June 2015 July 2011 • Gross oil • Target six metre column of column height 17 metres 25 • Good quality • Permeability fluvial sandstone up to reservoir 13.6 Darcy identified • Estimated • Recovery recover

  28. Slide 28: Western Flank Ex PEL 92

    Western Flank Ex PEL 92 • FY15 gross production of 1.5 MMbbl Retention licences 85 to 104 granted (4,110 bopd) • FY15 successes include: – Two-well appraisal / development campaign in Callawonga Field; – Additional flowlines and separator cleaning campaign; and – Inversion of existing 3D seismic • F

  29. Slide 29: Western Flank Ex PEL 104 / 111

    Western Flank Ex PEL 104 / 111 • FY15 gross production of 1.6 MMbbl Retention licences 136 to 150 granted (4,502 bopd) • FY15 successes include: – Martlet-1 and Martlet North-1 Namur Sandstone oil discoveries; and – Production growth, with strong performance from Spitfire Field • Historical focus on

  30. Slide 30: Western Flank Ex PEL 106

    Western Flank Ex PEL 106 • FY15 gross production of 0.7 MMboe Retention licences 129 and 130 granted (1,794 boepd) • Two exploration wells in FY16, testing stacked stratigraphic traps in liquids-rich play – Drilling planned for Q3 FY16 • Ralgnal-1 extended production test underway, with encouraging

  31. Slide 31: Western Flank Technologies assisting new play types

    Western Flank Technologies assisting new play types • Conventional seismic Conventional seismic Reflection amplitudes associated with formation boundaries – Enables structural interpretation • Inverted seismic Inverted seismic Transforms reflection data into quantitative rock properties – Inverted d

  32. Slide 32: Western Flank Ex PEL 106 3D seismic interpretation

    Western Flank Ex PEL 106 3D seismic interpretation Middleton Admella Potential mounded sequence within the SSW NNE Brownlow Package Nappamerri Toolachee Epsilon Murteree Vs18 Vs30 Canunda Package Vs45 Brownlow Package Vs50 Vs80A 32

  33. Slide 33: Western Flank Resultant exploration targets identified

    Western Flank Resultant exploration targets identified Middleton Illustrative target packages Admella metres tvdss Murteree -2,500 Vs18 Canunda Package Vs30 Brownlow Package -2,600 Vs45 Middleton Package Vs50A -2,700 Vs50 Vs80A -2,800 33

  34. Slide 34: Eastern Flank PL 184: Thylungra-2

    Eastern Flank PL 184: Thylungra-2 • Thylungra-1 drilled in 1995 Targeting Hutton Sandstone oil – Encountered oil shows in the Hutton Sandstone and Basal Jurassic Formation (BJF) • Thylungra-2 to be drilled 15 metres up-dip of Thylungra-1 – Targeting Hutton Sandstone, with BJF a secondary target – Al

  35. Slide 35: Cooper Basin Gas SACB and SWQ JVs drilling program

    Cooper Basin Gas SACB and SWQ JVs drilling program South Australia • Reduced drilling activities in FY16, with up to 40 wells planned – Three rigs currently drilling • More appraisal / near-field exploration activities relative to past infill drilling – SACB JVs: Focus on liquids-rich fields; deep c

  36. Slide 36: Cooper Basin Gas Deep Coals

    Cooper Basin Gas Deep Coals Southern Deep Coals • Targeting coals at 1,500 – 2,000 metres depth • Well costs of ~$3 million • Davenport-1 exploration well indicated good permeability and gas content in core • Extended production test expected late FY16 Patchawarra Trough Deep Coals • Thick coals pre

  37. Slide 37: Cooper Basin Gas Nappamerri Trough Natural Gas

    Cooper Basin Gas Nappamerri Trough Natural Gas Ex PEL 218 (PRLs 33 to 49) – Beach 100% • 18 wells drilled across permits; 16 fracture stimulated ATP 855 – Beach 64.9% and operator, Icon Energy 35.1% • 495 MMboe contingent resources1 1. As announced to the Australian Securities Exchange on 21 August

  38. Slide 38: Offshore Otway Basin 3D seismic survey

    Offshore Otway Basin 3D seismic survey • Permit adjacent to producing Thylacine and Offshore Otway – T/49P Geographe gas fields • Proximal to existing infrastructure • Two larges structures confirmed in north of Geographe Field permit area (Flanagan and Whalebone) • Detailed mapping underway; next s

  39. Slide 39: International New Zealand

    International New Zealand Canterbury Basin (PEP 52717) Prospective exploration acreage • Farm-down process underway • Seeking extension to April 2016 well commitment • Further studies underway to determine optimum well location Taranaki Basin (PEP 52181) • No current activities • Seeking extension t

  40. Slide 40: International Africa

    International Africa Tanzania – Farm-down underway Egypt – Sale process underway 40

  41. Slide 41: Q&A

    Q&A

  42. Slide 42: Gas Market Update

    Gas Market Update Rod Rayner – Group Executive Commercial

  43. Slide 43: Eastern Australia gas market

    Eastern Australia gas market Demand to triple in five years Eastern Australia Gas Market Composition – 2014 • 2013 consumption: ~700 PJ • 2018 consumption (forecast) ~2,100 PJ – 70% attributable to LNG Expanded transport infrastructure connectivity • Allowing supply to access Queensland LNG Source:

  44. Slide 44: Eastern Australia gas market

    Eastern Australia gas market Domestic gas now exposed to global LNG Forecast Eastern Australia Gas Demand market dynamics • Domestic gas consumers competing with export markets • LNG demand ramp up coinciding with expiry of legacy Cooper and Gippsland basin contracts • Increased base price and oil-l

  45. Slide 45: Eastern Australia gas supply

    Eastern Australia gas supply Conventional gas Eastern Australia 2P Gas Reserves (PJ) • Regional market dynamics prevailed • Historically able to meet seasonality in demand • Recent decline hindered gas demand growth CSG • Major increases in 2P reserves, mainly Queensland becoming dominant source of

  46. Slide 46: Opportunities for Cooper Basin gas

    Opportunities for Cooper Basin gas • Cooper Basin ideally situated adjacent to transport infrastructure to eastern and southern markets – Able to supply domestic and LNG export markets • Existing Beach gas sale contracts provide exposure to domestic and LNG export markets, without associated midstre

  47. Slide 47: Otway and Gippsland basins

    Otway and Gippsland basins • Existing exploration acreage proximal to regional transportation and processing infrastructure, supplying eastern Australia markets • Gas production able to be supplied to southern and LNG markets via SEAgas and EGP pipelines • Premium gas pricing for seasonal flexibilit

  48. Slide 48: Infrastructure Projects

    Infrastructure Projects Mike Bangerter – Team Leader, Facilities Engineering

  49. Slide 49: Facilities Engineering

    Facilities Engineering Key functions Key activities • Design, procure, construct and • Facilities engineering commission surface plant and equipment for processing, custody metering, storage • Asset integrity and reliability and transportation of oil and gas fluids • Production measurement from well

  50. Slide 50: Operated Cooper Basin infrastructure

    Operated Cooper Basin infrastructure Cooper Basin Fields Producing Wells Facilities South Australia – Oil 24 78 15 South Australia – Gas 6 3 1 Queensland – Oil 6 42 7 Total 36 123 23 23 facilities servicing 123 wells across 36 fields 50

  51. Slide 51: Oil processing facilities – General approach

    Oil processing facilities – General approach Modular design approach Pennington facility under construction • Modular approach of pre-fabricated equipment and assemblies reduces on- site construction time and costs • Template design concept developed to reduce design time and maintain consistency to

  52. Slide 52: Oil processing facilities – 3D modelling

    Oil processing facilities – 3D modelling • 3D CAD design introduced late 2014 to improve design and construction implementation • Allows better visualisation of how the facility will look and operate • Assists HAZOP, risk assessments and HSE compliance • Significant benefits in accuracy have led to

  53. Slide 53: Project execution – Process overview

    Project execution – Process overview Projects divided into phases with approval gates • Phases 1, 2, 3 and 5 performed by Beach • Phases 4 and 6 outsourced if required 53

  54. Slide 54: Project execution – Oil processing facilities

    Project execution – Oil processing facilities Each development is different and requires careful evaluation • During the Appraise and Select phases, facility processing requirements and engineering solutions are developed • Considerations for the development of each processing facility include: Rese

  55. Slide 55: Project execution – Timeline

    Project execution – Timeline Timelines vary depending on complexity, capacity and content of project Stunsail facility • 20,000 bfpd processing capacity • 2,500 bopd storage • 19 kilometre export pipeline and end of line facilities • Multiple well flowline connections Indicative lead times Appraise,

  56. Slide 56: Western Flank pipelines

    Western Flank pipelines • Pipeline network installed between 2008 and 2015 – 280 kilometres of oil pipelines – 72 kilometres of gas pipelines • Delivers improved efficiency and reduced costs – Uninterrupted production during times of flooding – Less reliance on trucking • Composite material now used

  57. Slide 57: Western Flank pipelines

    Western Flank pipelines Spoolable composite pipe • High pressure capability • Immune to corrosion, with few joints • Rapid installation, resulting in lower costs • Minimal environmental impact Installation of Stunsail to Bauer oil pipeline with direct plough technique 57

  58. Slide 58: Western Flank pipelines

    Western Flank pipelines Stick glass reinforced epoxy (GRE) pipe material • Manufactured with glass fibre filament windings in an epoxy resin • High strength and corrosion resistant, with low installation costs • Improved flow capacity and long service life Pipe assembly of 200 nominal bore Lycium to

  59. Slide 59: Best practice asset management

    Best practice asset management • Value engineering analysis and life of asset considerations factored into each development • Skid mounted equipment reduces on-site installation and enables re-use at other locations • Equipment selected to have commonality across all assets – Provides familiarity fo

  60. Slide 60: Approach to Basin Reviews

    Approach to Basin Reviews Andrew Krassay – Senior Geologist, New Ventures

  61. Slide 61: Australian basins – Regional geology

    Australian basins – Regional geology Australian basins by Age Cenozoic Mesozoic- Cenozoic Mesozoic Paleozoic- Cenozoic Paleozoic- Mesozoic Paleozoic Neoproterozoic -Paleozoic Archean- Proterozoic BPT permits Australian basins – diverse, old, stacked and complex 61

  62. Slide 62: Australian basins – Overview

    Australian basins – Overview Frontier Mature Proven 62

  63. Slide 63: Case 1: Mature – Cooper / Eromanga basins

    Case 1: Mature – Cooper / Eromanga basins Mature area • ~4,000 wells • Good regional 2D seismic coverage • Significant 3D seismic • ~500 oil and gas fields • Pipelines • Facilities • Excellent access to markets • Clear understanding of cost structures and commercial hurdles 1:3 million scale 63

  64. Slide 64: Case 1: Mature – Cooper / Eromanga basins

    Case 1: Mature – Cooper / Eromanga basins Mature area NGMA merged basement- top Permian depth map • Extensive mapping and databases available • Good understanding of regional geology • Known structure and stratigraphy Basin review focus • Review of key datasets • Defining play fairways and extension

  65. Slide 65: Case 1: Mature – Cooper / Eromanga basins

    Case 1: Mature – Cooper / Eromanga basins Wells • 3,760 wells within 50 kilometres of Permian edge Oilfields (n=206) • 74% within the Permian Basin • Only seven oilfields (3%) >25 km Gasfields (n = 269) • 99.6% within Permian Basin 1:3 million scale 65

  66. Slide 66: Case 1: Mature – Cooper / Eromanga basins

    Case 1: Mature – Cooper / Eromanga basins Lead Lead Lead Basin review • Refining source, charge, migration models • Well failure analysis • Play fairway mapping • Seismic mapping in time and depth • Developing P&L inventory • Risking and volumetric modelling 66

  67. Slide 67: Case 2: Proven – Otway Basin

    Case 2: Proven – Otway Basin Proven basin with frontier areas • ~250 wildcat wells • Good regional 2D seismic coverage • Extensive 3D seismic over main producing areas • ~50 gas fields • Pipelines and facilities localised to hubs • Excellent access to markets 67

  68. Slide 68: Case 2: Proven – Otway Basin

    Case 2: Proven – Otway Basin Basin Review • Well failure analysis • Play fairway mapping • New high quality seismic acquisition • Structural model Proven fairway • Detailed seismic mapping and AVO analysis Fairway extension • Use of analogues ? • Looking to extend known proven plays = Eumeralla - Wa

  69. Slide 69: Case 2: Proven – Otway Basin Creaming Curve

    Case 2: Proven – Otway Basin Creaming Curve Speculant 450 Martha - Henry Netherby 60,000 Cumulative Production (boe/d) ~2.3 Tcf 400 Onshore Offshore 350 Casino Cumulative Reserves (MMboe) 40,000 300 Thylacine 250 20,000 Minerva – La Bella Paaratte North – Wallaby Crk 200 Geographe 150 Ladbroke Grove

  70. Slide 70: Case 2: Proven – Otway Basin

    Case 2: Proven – Otway Basin SSW NNE 10 km ~2000mSS 3D Oil interpretation • Key to unlocking remaining potential in this basin is 3D seismic with inversion • Potential to extend the Shipwreck Trough play fairway is encouraging • Detailed mapping to understand structural style, seal units and fluids

  71. Slide 71: Case 3: Frontier – Northern Territory

    Case 3: Frontier – Northern Territory Frontier areas • Stacked, mostly old basins • Two currently in production – Amadeus and Bonaparte basins • Only 152 petroleum exploration wells • Sparse 2D seismic coverage • Few existing fields • Localised infrastructure • Market access limited to specific area

  72. Slide 72: Case 3: Frontier – Northern Territory

    Case 3: Frontier – Northern Territory Frontier areas • Nearly all of NT under application or covered by existing exploration permits • Regional geological assessment suggests vastly varying prospectivity and exploration risks • Basin review relies on fundamental datasets and ‘old school’ interpretat

  73. Slide 73: Case 3: Frontier – Northern Territory

    Case 3: Frontier – Northern Territory Bonaparte Basin • One of two producing basins in the NT • Basin review suggested proven offshore plays extended onshore in Petrel Sub- basin – Beach took a position in this acreage • Drilled Cullen-1 to test these plays • Interpretation of three valid plays: – S

  74. Slide 74: Case 3: Frontier – Northern Territory

    Case 3: Frontier – Northern Territory 74

  75. Slide 75: Case 3: Frontier – Northern Territory

    Case 3: Frontier – Northern Territory High resolution airborne gravity gradiometer and magnetics survey Updip carbonate or clastic trap potential NW SE Oil shows 75

  76. Slide 76: Case 3: Frontier – Northern Territory

    Case 3: Frontier – Northern Territory Petrel Sub-basin gravity + play map 76

  77. Slide 77: Key technical questions for basin reviews

    Key technical questions for basin reviews • Shape, depth and thickness of the basin • Nature of the basin-fill • Age and thermal history of the basin • Data coverage and confidence • Exploration maturity • Evidence for presence of active petroleum system(s) • Main source rocks and reservoir-seal pai

  78. Slide 78: Close

    Close Neil Gibbins – Acting Chief Executive Officer

  79. Slide 79: Appendix

    Appendix

  80. Slide 80: Other Australian interests

    Other Australian interests Otway Basin Gippsland Basin Various Beach interests, from 30% to 75% Beach 35%, Cooper Energy 65% and operator 80

  81. Slide 81: Other Australian interests

    Other Australian interests Bonaparte Basin Browse and Carnarvon Basins Browse Basin: Beach 7.34%, Santos 47.83% and operator, Chevron 24.83%, Inpex 20.0% Beach 100% Carnarvon Basin: Beach 10.0%, Santos 37.33% and operator, APACHE 34.03%, Eni 18.66% 81

  82. Slide 82: Contact information

    Contact information Beach Energy Limited 25 Conyngham Street Glenside SA 5065 Tel: +61 8 8338 2833 Fax: +61 8 8338 2336 Website: www.beachenergy.com.au Investor Relations Derek Piper Investor Relations Manager Email: derek.piper@beachenergy.com.au 82

Beach Energy — Investor Day (November 2015) on 6ix