Filo Mining Corp

Filo Mining — Shareholder Meeting (June 2019)

20 slides from Filo Mining's shareholder meeting presentation, Jun 20, 2019

  1. Slide 1: Advancing the Filo del Sol Copper-Gold-Silver Project in South America

    Advancing the Filo del Sol Copper-Gold-Silver Project in South America SHAREHOLDERS MEETING PRESENTATION June 20, 2019

  2. Slide 2: Cautionary Statement

    CAUTIONARY STATEMENT Certain statements made and information contained in this presentation constitutes “forward-looking information” and “forward-looking statements” within the meaning of applicable securities legislation (collectively, “forward-looking information”). The forward-looking informatio

  3. Slide 3: Copper Fundamentals Strong

    COPPER FOUNDAMENTALS STRONG  Copper price does not reflect fundamentals – Demand is robust  New projects required to meet copper supply needs – Filo in a good position to help fill the gap (advanced exploration/PFS stage)  Capital availability low in current market – Lundin Group historic wherewi

  4. Slide 4: A Lundin Group Company

    A LUNDIN GROUP COMPANY CREATING VALUE FOR SHAREHOLDERS The Lundin Group of Companies has a record of creating substantial value for shareholders. Past projects have generated some $15.8 billion. Shareholder Return on Investment* 1757% 1041% 1091% 961% 850% 558% 609% 352% 139% *Year is date of takeov

  5. Slide 5: Filo Mining Corp. Company Profile

    FILO MINING CORP. COMPANY PROFILE  Flagship Project – Filo de Sol (100% interest)  South American Mineral Exploration and Development Company  Experienced, Knowledgeable and Successful Board, Management & Technical teams  Past successes in region  A Lundin Group Company Share Ownership Capital

  6. Slide 6: Filo del Sol Project Summary

    FILO DEL SOL PROJECT SUMMARY 100% Interest Border of Chile & Argentina  Pro-mining countries  Mining Integration and Complementation Treaty PFS Released January 2019 Two-step Approach Forward  Advance development based on PFS results  leachable oxide cap  Define CuAu porphyry potential  La

  7. Slide 7: Filo del Sol

    < c = Outcropp Younger cover fe) High grade 1 \ = pts <= At oxide copper : Altera Resource SS —_ Fa Area == Byarometre® |

  8. Slide 8: Indicated Resource

    INDICATED RESOURCE 3.1 Billion 146.9 Million lbs oz *Cu *Ag 4.4 Million oz *Au Refer to slide 8 for additional details regarding the reporting of the Filo del Sol resources statement. 8

  9. Slide 9: Positive Pre-Feasibility Results

    POSITIVE PRE-FEASIBILITY RESULTS PFS Results (January 13, 2019) $1.86 billion NPV Pre-Tax NPV (8%) & IRR 27% IRR $1.28 billion NPV After-Tax NPV (8%) & IRR 23% IRR Undiscounted After-Tax Cash Flow (LOM) $3.23 billion Payback Period from start of processing 3.4 Years (undiscounted, after-tax cash flo

  10. Slide 10: Metal Production Profiles

    METAL PRODUCTION PROFILES UNIQUE TO HAVE THIS LEVEL OF COPPER, GOLD AND SILVER PRODUCED Annual Metal Production (based on 12-year LOM)  67,000 t Cu  159,0000 oz Au  8,653,000 oz Ag A National Instrument 43-101 – Standards of Disclosure for Mineral Projects (“NI 43-101”) Technical Report, entitled

  11. Slide 11: Mineral Resource

    MINERAL RESOURCE Total Resource Tonnes Cu Au Ag lbs Cu Ounces Au Ounces Ag Zone Cutoff Category (millions (%) (g/t) (g/t) (millions) (thousands) (thousands) Indicated 49.9 0.04 0.42 3.0 45 679 4,810 AuOx 0.20 g/t Au Inferred 20.8 0.08 0.34 2.4 35 226 1,580 Indicated 259.2 0.38 0.29 2.7 2,166 2,385 2

  12. Slide 12: 2018/2019 Drill Results

    2018/2019 DRILL RESULTS MINERALIZED ALL THE WAY ~4,700 m program  7 holes drilled  6 out of 7 ending in mineralization  Resource remains open North to South and at depth  Continuous mineralization of a 3km North to South distance and 900m East to West  Extended depth of mineralization 530m dee

  13. Slide 13: 2018/2019 Drilling Results: First Holes

    2018/2019 DRILLING RESULTS First 2 Holes – March 18, 2019 • FSDH025 & FSDH026 HOLE-ID From (m) To (m) Length (m) Cu % Au g/t Ag g/t FSDH025 0.0 1025.0 1025.0 0.30 0.22 1.6 incl. 334.0 466.0 132.0 0.48 0.30 1.2 FSDH026 0.0 613.9 613.9 0.39 0.34 1.6 incl. 14.0 474.0 460.0 0.45 0.34 1.6 and incl. 14.0

  14. Slide 14: 2018/2019 Drilling Results: Second Holes

    2018/2019 DRILLING RESULTS Second 2 Holes – May 23, 2019 • FSDH027 & FSDH028 HOLE-ID From (m) To (m) Length (m) Cu % Au g/t Ag g/t FSDH027 0.0 545.4 545.4 0.22 0.28 1.8 incl 318.0 422.0 104.0 0.37 0.34 3.5 FSDH028 16.0 563.5 547.5 0.40 0.78 8.0 incl 155.0 164.0 9.0 0.18 22.04 15.2 and incl 390.0 563

  15. Slide 15: 2018/2019 Drilling Results: Final Holes

    2018/2019 DRILLING RESULTS Final 3 Holes – May 28, 2019 • FSDH029, FSDH030 & FSDH031 HOLE-ID From (m) To (m) Length (m) Cu % Au g/t Ag g/t FSDH029 0.0 800.1 800.1 0.24 0.26 1.8 incl 6.0 42.0 36.0 0.78 0.20 3.1 FSDH030 134.0 512.0 378.0 0.44 0.89 42.5 incl 190.0 244.0 54.0 1.05 0.83 1.4 and incl 262.

  16. Slide 16: Next Steps

    NEXT STEPS Ongoing environmental studies and data collection in support of project permitting Initiate flotation metallurgical testwork on transition zone material Define program for 2019/2020 field season 16

  17. Slide 17: Experienced Management Team

    EXPERIENCED MANAGEMENT TEAM EXPERTISE IN EXPLORATION, PROJECT STUDIES, FINANCING Adam Lundin, President and CEO Wojtek Wodzicki, Technical Consultant • See biography on next slide (Board of Directors) • See biography on next slide (Board of Directors) Jamie Beck, Vice President Corporate Development

  18. Slide 18: Strong & Reputable Board

    STRONG & REPUTABLE BOARD EXPERTISE IN EXPLORATION, PROJECT STUDIES, FINANCING, M&A TRANSACTIONS Lukas Lundin, Chairman (non-executive) Paul McRae • Successful entrepreneur focused on natural resources. • Distinguished global reputation in project and • Has led numerous companies through successful c

  19. Slide 19: Probable Mineral Reserves

    PROBABLE MINERAL RESERVES Filo del Sol Mineral Reserve Statement (@ 0.01 $/t NVPT cut-off) Tonnage Grade Contained Metal Category (all domains) (Mt) Cu (%) Au (g/t) Ag (g/t) NVPT ($/t) Cu (M lbs) Au (K oz) Ag (K oz) Proven _ _ _ _ _ _ _ _ Probable 259.1 0.39 0.33 15.1 25.30 2,226 2,764 126,028 Total

  20. Slide 20: Board and Management

    BOARD AND MANAGEMENT For more information contact: Michelle Fyfe Robert Eriksson Investor Relations Canada Investor Relations and Media Sweden info@filo-mining.com reriksson@rive6.ch Tel: +1 604 689 7842 Tel: +46 (0)8 440 5450 Suite 2000 – 885 West Georgia Street Vancouver, BC Canada V6C3E8 www.filo

Filo Mining — Shareholder Meeting (June 2019) on 6ix