Entergy Corporation · NYSE:ETR

Entergy — Q4 2024 Earnings Presentation

58 slides from Entergy's earnings presentation, Feb 18, 2025

  1. Slide 1: Fourth quarter 2024 earnings call

    Fourth quarter 2024 earnings call 0 February 18, 2025

  2. Slide 2: Caution regarding forward-looking statements and Regulation G compliance

    Caution regarding forward-looking statements and Regulation G compliance In this presentation, and from time to time, Entergy Corporation makes certain “forward-looking statements” within the meaning of the Private Securities Litigation Reform Act of 1995. Such forward-looking statements include, am

  3. Slide 3: Table of contents

    Table of contents Section Slides Business discussion 3–9 Appendix About Entergy 11 2025 regulatory timeline 12 Utility 13–32 Financial and forecast disclosures 33–51 Financial summaries and Regulation G reconciliations 52–56 2

  4. Slide 4: Key takeaways

    Key takeaways  2024 results 2024 adjusted EPS – Adjusted EPS in top half of guidance range $3.65 – Strong credit metrics 2024 OCF  Raised four-year capital plan and longer-term $4.5B outlooks  Robust pipeline of potential new customers Credit Strong actuals and outlooks  Customer-centric stakeho

  5. Slide 5: Updating capital plan and raising outlooks

    Updating capital plan and raising outlooks Growth and customer demands driving investments 4-year capital plan; cumulative $B Equity needs; $B Adjusted EPS; $ 37 Remaining EEI1 need Completed 3.3 1.4 25E 26E 27E 28E 25E–26E 26E–28E 24 25E 26E 27E 28E settlement settlement Note: Entergy executed a tw

  6. Slide 6: 2024 adjusted earnings per share

    2024 adjusted earnings per share Entergy adjusted EPS; $ 0.23 0.01 0.73 (0.02) (0.30) (0.15) (0.18) (0.06) 4.10 3.80 3.80 3.88 3.39 3.39 3.70 3.70 3.65 3.65 1 23 Utility Utility Utility Utility Utility P&O Income Share effect 24 operating other other other interest taxes – 1 rev. less fuel, O&M oper

  7. Slide 7: Credit

    Credit Credit ratings1 (outlooks) E-AR E-LA E-MS E-NO E-TX SERI ETR Moody’s A2 A2 A2 Baa2 A3 Baa2 Baa2 (stable) (stable) (stable) (stable) (stable) (stable) (stable) S&P A A A BBB A BBB+ BBB+ (stable) (stable) (stable) (stable) (stable) (stable) (stable) Key ETR credit metrics Agency 25E–28E thresho

  8. Slide 8: Updated equity plan

    Updated equity plan Supports credit and helps fund $2.7B incremental capital since EEI Illustrative Equity needs; $B Equity cash inflow by year Completed1 Remaining need 25E–26E, contracted Sufficient market capacity to satisfy with ATM 3.3 >75% expected to be Completed in settled in 27E–28E 1.4

  9. Slide 9: Raising adjusted EPS outlooks

    Raising adjusted EPS outlooks Greater than 8% CAGR1 through 28E, removing top end of the range Entergy adjusted EPS; $ 5.10–5.40 4.65–4.95 4.25–4.45 3.65 3.75–3.95 Midpoints at EEI 24 25E 26E 27E 28E As-reported 2.45 Note: Entergy executed a two-for-one forward stock split that was effective with tr

  10. Slide 10: 2025 adjusted EPS drivers

    2025 adjusted EPS drivers Illustrative Entergy adjusted EPS; $ 3.65 3.75–3.95 24 Utility Utility Utility Utility Utility Income tax rate, 25E operating rev. other O&M other other interest share effect guidance 2 less fuel, operating income expense purch. power, expenses1 and reg. chgs. As-reported 2

  11. Slide 11: Appendix

    10 Appendix eS) entergy

  12. Slide 12: About Entergy

    About Entergy Vertically integrated utility with five operating companies in four states – AR, LA, MS, and TX 3 million retail customers 24,479 MW owned and leased generating assets 16,100 circuit miles of interconnected high-voltage transmission lines 106,900 circuit miles of distribution lines 202

  13. Slide 13: 2025 regulatory timeline

    2025 regulatory timeline Regulatory activities 1Q25 2Q25 3Q25 4Q25 FRPs E-AR Filing E-LA Filing  E-MS Filing 1  E-NO Filing  Investment E-AR Lake Catherine Unit 5 Filing E-LA invest. for new customer Filing E-LA resilience rider Filing  Filing  E-LA West Bank 230 kV Filing E-LA West Bank 500 k

  14. Slide 14: Utility overview

    Utility overview E-AR E-LA1 E-MS E-NO1 E-TX • Electric utility – • Electric and gas utility • Electric utility – • Electric and gas utility • Electric utility – 735,000 customers – 1,110,000 electric 459,000 customers – 209,000 electric 524,000 customers • Authorized ROE: customers • Authorized ROE:

  15. Slide 15: Utility 2024 weather-adjusted electric retail sales

    Utility 2024 weather-adjusted electric retail sales 123 TWh Governmental E-TX E-AR 2% 17% 19% Residential 29% E-NO 5% By By Industrial operating 46% customer E-MS company class 10% Commercial E-LA 23% 49% 14

  16. Slide 16: Utility generation overview

    Utility generation overview Renewables 1 Renewables 2% Coal 3% Purchases 8% CT / CCCT 16% 43% Coal CT / CCCT 3% 42% Nuclear Owned and 2024 sources 21% leased capability of energy as of 12/31/24 142 TWh 24 GW Nuclear 27% Legacy gas / oil Legacy gas 25% 10% Note: the percentage of renewable and nuclea

  17. Slide 17: Jurisdictional base rate filing frameworks

    Jurisdictional base rate filing frameworks E-AR E-LA E-MS E-NO E-TX1 SERI Latest filing 7/5/24 (FRP) 8/27/24 (FRP) 3/1/24 (FRP) 4/30/24 (FRP) 7/1/22 Monthly cost of date (rate case) service Rate effective Jan. following filing Sept. following filing April following filing2 Sept. following filing 35

  18. Slide 18: Entergy Arkansas

    Entergy Arkansas E-AR (currently in rates) Metric Detail Authorized ROE 9.15% – 10.15% Rate base $11.3B retail rate base (2025 test year) WACC (after-tax) 5.58% Equity ratio 37.9% (47.0% excluding $2.0B ADIT at 0% rate) Regulatory construct Forward test year FRP; result outside ROE band reset to mid

  19. Slide 19: E-AR Lake Catherine Unit 5 CT generation CECPN

    E-AR Lake Catherine Unit 5 CT generation CECPN Project overview (docket 24-072-U) Item Details MW 446 MW Plant Type CT with H2 capability Location Hot Spring County, AR Targeted in-service date 4Q28 Key dates Date Event 2/21/25 Settlement or issues list 3/5/25 Hearing 3/31/25 Requested decision 18 S

  20. Slide 20: Entergy Louisiana

    Entergy Louisiana E-LA (currently in rates) Metric Detail – electric Detail – gas1 Authorized ROE 9.3% – 10.1% 9.3% – 10.3% Rate base $16.4B (12/31/23 test year) $0.16B + $0.1B TRM rider + $0.3B DRM rider +$(0.4B) (9/30/23 test year) tax reform rider WACC (after-tax) 6.81% 7.08% Equity ratio 50.81%

  21. Slide 21: E-LA investment to support new customer

    E-LA investment to support new customer Filing highlights (docket U-37425) • A variety of generation and transmission resources proposed in connection with service to a new customer facility in north Louisiana, including: – three new CCCTs totaling 2,262 MW, each of which will be enabled for future

  22. Slide 22: E-LA Bayou Power Station filing

    E-LA Bayou Power Station filing Procedural schedule suspended to evaluate cost Project overview (docket U-37131) Item Details MW 112 Estimated cost TBD Location Leeville, LA Targeted in-service date 2028 Proposed recovery mechanism FRP with deferral until costs can be reflected in rates if needed Ke

  23. Slide 23: E-LA Francine cost recovery filing

    E-LA Francine cost recovery filing Plan to propose new framework to accelerate future recovery Filing highlights (docket U-37468) • $186M restoration costs for Hurricane Francine ꟷ $153M distribution capital (to be placed in rate base, recovered through DRM, requesting 3/1/25 rate effective date, su

  24. Slide 24: E-LA West Bank 230kV transmission filing

    E-LA West Bank 230kV transmission filing Settlement filed Project overview (docket U-37143) • Seeks approval of a portfolio of Amite South transmission projects located on the west bank of the Mississippi River, including construction of a 500/230kV substation • Total estimated cost $499M, proposed

  25. Slide 25: E-LA West Bank 500kV transmission filing

    E-LA West Bank 500kV transmission filing Project overview (docket U-37467) • A portfolio of Amite South transmission projects located on the west bank of the Mississippi River, including construction of a new 84-mile 500kV line • Total estimated cost $955M, proposed to be recovered through TRM, if a

  26. Slide 26: E-LA resilience plan cost recovery rider

    E-LA resilience plan cost recovery rider Semi-annual filing Filing highlights (docket U-36625) • $329M rate base • $39M incremental revenue requirement • ROE, WACC, and equity ratio from most recent FRP Key dates Date Event March 2025 Rate effective date 25

  27. Slide 27: Entergy Mississippi

    Entergy Mississippi E-MS (currently in rates) Metric Detail Authorized ROE 10.91% performance-adjusted midpoint (10.56% + 0.35% performance factor); 9.91% – 11.92% range (annual redetermination based on formula) Rate base $4.5B (2024 forward test year) WACC (after-tax) 7.52% Equity ratio 49.67% Regu

  28. Slide 28: Entergy New Orleans

    Entergy New Orleans E-NO (currently in rates) Metric Detail – electric Detail – gas1 Authorized ROE 8.85% – 9.85% (9.35% midpoint) Rate base $1.3B $0.2B (12/31/23 test year plus known and measurables through 12/31/24) WACC (after-tax) 7.28% Equity ratio 55% Regulatory FRP with forward-looking featur

  29. Slide 29: Entergy Texas

    Entergy Texas E-TX (currently in rates) Metric Detail Authorized ROE 9.57% Rate base $4.4B (12/31/21 test year) $0.5B DCRF (through 6/30/24) WACC (after-tax) 6.61% Equity ratio 51.2% Regulatory Historical test year rate case1; interim rate base construct riders: TCRF2, DCRF3, and GCRR4 Key rate chan

  30. Slide 30: E-TX generation CCN filing

    E-TX generation CCN filing Project overview (docket 56693) Item Legend Power Station Lone Star Power Station MW 754 453 Est. total investment $1.6B $0.8B Plant type CCCT with H2 capability and CCS-enabled CT with H2 capability Location Jefferson County, TX Liberty County, TX In-service date 2028 202

  31. Slide 31: E-TX renewable CCN filing

    E-TX renewable CCN filing Project overview (docket 56865) Item Segno Solar Votaw Solar MW 170 141 Plant type Solar photovoltaic Solar photovoltaic Location Polk County, TX Hardin County, TX In-service date 2027 2028 Recovery mechanism GCRR GCRR Key dates Date Event 2/20/25 E-TX rebuttal testimony an

  32. Slide 32: E-TX TCRF filing

    E-TX TCRF filing Filing highlights (docket 57162) • $137M net transmission investment from 1/1/22 through 6/30/24 • $10M revenue requirement • ROE, WACC, and equity ratio from most recent rate case Key dates Date Event 2/20/25 PUCT open meeting 3/13/25 PUCT open meeting 3/27/25 PUCT open meeting 31

  33. Slide 33: System Energy Resources

    System Energy Resources Grand Gulf Nuclear Station Energy and capacity allocation1 SERI (most recent monthly bill) E-AR Metric Detail E-NO 24% 20% Principal asset Ownership and leasehold interest in GGNS Authorized ROE 9.65% Last calculated $1.83B rate base WACC (after-tax) 7.41% Equity ratio 52.0%

  34. Slide 34: Financial and forecast disclosures

    Financial and forecast disclosures 33

  35. Slide 35: Key guidance drivers

    Key guidance drivers 2025 adjusted EPS guidance range $3.75 – $3.95 Driver Assumption (in EPS, except where noted) Regulatory proceedings Full year of 2024 rate actions and planned 2025 rate actions See Adjusted EPS – quarterly considerations slides and individual OpCo slides Weather $(0.15) YoY cha

  36. Slide 36: Adjusted EPS – quarterly considerations

    Adjusted EPS – quarterly considerations 2024 items of note (EPS, unless otherwise noted) 1Q 2Q 3Q 4Q ETR as-reported EPS 0.18 0.11 1.50 0.65 Adjustments (0.36) (0.85) - (0.01) ETR adjusted EPS 0.54 0.96 1.50 0.66 Diluted average number of common shares outstanding (in millions) 428 429 431 438 2024

  37. Slide 37: Adjusted EPS – quarterly considerations (continued)

    Adjusted EPS – quarterly considerations (continued) 2024 items of note (continued) 1Q 2Q 3Q 4Q 2024 key rate actions (annualized pre-tax rate change) E-MS grid mod rider1 (Feb.) $14M E-MS FRP2 (Apr.) $65M E-MS vegetation/storm1 and interim capacity riders (July) $52M E-LA FRP (incl. higher nuc. depr

  38. Slide 38: Strong customer growth

    Strong customer growth Rolling forward to 2024 base year Cumulative weather-adjusted retail sales growth vs 2024; TWh 37 ~12% – 13% 22 Industrial CAGR 28E vs 24 13 7 25E 26E 27E 28E Residential Commercial Industrial 37

  39. Slide 39: Diversified large industrials

    Diversified large industrials Industry and geographic diversity Large industrials Large industrials Sales growth 28E vs 24; TWh Sales volume by year; TWh ~72 ~35 ~35 E-TX E-MS E-LA E-AR By OpCo By industry 25E 26E 27E 28E All other Other chemicals Agricultural chemicals Transportation Primary metals

  40. Slide 40: Strong long-term retail sales growth

    Strong long-term retail sales growth Driven by diverse industrial growth; residential and commercial essentially flat Four-year sales trends; MWh Total retail Industrial ~6% – 7% CAGR ~12% – 13% CAGR 24 25E 26E 27E 28E 24 25E 26E 27E 28E Residential Commercial <1% <1% CAGR CAGR 24 25E 26E 27E 28E 24

  41. Slide 41: New generation to meet growing demand

    New generation to meet growing demand Approved / in progress Regulatory reviews pending Owned / Est. in Owned / Est. in Project MW PPA service1 Project MW PPA service1 Flat Fork Solar (E-AR) 200 PPA 2025 ETR OpCo filings Forgeview Solar (E-AR) 200 PPA 2025 Segno Solar (E-TX) 170 Owned 2027 Sterlingt

  42. Slide 42: A clean portfolio that supports growth

    A clean portfolio that supports growth Expanding renewables, planning for optionality with H2, CCS Planned resource capacity; GW ~44 ~36 ~27 24 28E 1 33E1 Nuclear Renewables H2 and CCS capable 2 Modern gas Legacy gas Coal Non-generating resources 3 Includes owned resources and purchased power contra

  43. Slide 43: Improving resilience through multiple channels

    Improving resilience through multiple channels Strong growth reducing relative risk Accelerated resilience programs Relative storm risk declining • Program designed to upgrade assets that are not up to latest standards Illustrative • Prioritizes projects with highest benefit/cost ratio $1B as a % of

  44. Slide 44: Capturing new large customers

    Capturing new large customers Starts with stakeholder engagement Guiding principles Customers  Deliver benefits for all key stakeholders  Responsive to customer timeline without Elected Regulators compromising regulatory oversight officials  Include customer protections Owners Vendors • Minimum b

  45. Slide 45: Investing for customer benefits

    Investing for customer benefits Four-year capital plan 25E–28E capital plan by function1 Other Generation 2 Distribution baseline 4 8 $37B Other new 10 generation 8 Transmission 5 Renewables Calculations may differ due to rounding 44 1. Excludes capital funded with contribution in aid of constructio

  46. Slide 46: Investment for customers supports growth

    Investment for customers supports growth Capital investment and depreciation expense; Projected rate base1,2; $B cumulative1; $B 37 27 66 59 52 18 45 40 8 25E 26E 27E 28E 24E 25E 26E 27E 28E Capital investment Depreciation expense 1. Excludes capital funded with contribution in aid of construction f

  47. Slide 47: Delivering strong credit and cash flow

    Delivering strong credit and cash flow Building capacity for unexpected events, stronger growth Credit outlooks Moody’s CFO pre-working capital to debt 16 Cumulative OCF outlook 15 Capacity 14 Moody’s downgrade threshold ~$21B 13 25E–28E 12 24 25E 26E 27E 28E S&P FFO to debt 16 15 14 Capacity 25E 26

  48. Slide 48: Three-year capital plan by OpCo

    Three-year $M capital plan by OpCo1 E-AR 25E 26E 27E Total E-LA 25E 26E 27E Total Distribution 360 290 310 960 Distribution 1,140 1,100 685 2,925 Transmission 80 70 95 245 Transmission 945 1,435 1,270 3,650 Generation Generation Renewables - - - - Renewables 150 325 1,170 1,645 Other new generation

  49. Slide 49: Three-year capital plan by OpCo (continued)

    Three-year $M capital plan by OpCo1(continued) E-TX 25E 26E 27E Total SERI 25E 26E 27E Total Distribution 450 395 325 1,170 Distribution - - - - Transmission 310 410 830 1,550 Transmission - - - - Generation Generation Renewables 255 190 170 615 Renewables - - - - Other new generation 520 580 115 1,

  50. Slide 50: Sources and uses of cash

    Sources and uses of cash Four-year sources and uses (25E–28E)1; $B ~5 ~5 ~4 ~0.5 ~11 ~37 ~21 Sources Uses OCF Capital investment Utility debt (net) and nuclear fuel Parent debt (net) Common dividends LDC sale proceeds Equity 25E-28E Calculations may differ due to rounding 49 1. Subject to change

  51. Slide 51: Financing assumptions

    Financing assumptions Issuances1 Debt maturity schedule as of 12/31/242; $M Company 25E 26E 27E 28E Company 25E 26E 27E 28E Utility long-term debt E-AR - 600 - 350 E-AR 195 780 - 715 E-LA 300 650 450 425 E-LA 1,225 2,245 2,325 1,805 E-MS - - 150 375 E-MS 545 750 530 860 E-NO 78 85 - - E-NO 80 110 -

  52. Slide 52: 2025 ETR adjusted EPS sensitivities

    2025 ETR adjusted EPS sensitivities Estimated annual Variable Description of sensitivity EPS impact (+/-) Utility Retail sales volume 1% change in residential MWh sold ~0.03 incremental to plan1 1% change in commercial MWh sold ~0.015 1% change in industrial MWh sold ~0.01 Other O&M 1% change in exp

  53. Slide 53: Financial summaries and Regulation G reconciliations

    Financial summaries and Regulation G reconciliations 52

  54. Slide 54: Earnings summary

    Earnings summary Table 1: Full year earnings summary $ in millions Per share in $ 2024 2023 2024 2023 As-reported (after-tax) Utility 1,827 2,507 4.23 5.90 Parent & Other (771) (151) (1.79) (0.35) Consolidated 1,056 2,357 2.45 5.55 Less adjustments Utility (289) 611 (0.67) 1.44 Parent & Other (233)

  55. Slide 55: Regulation G reconciliations

    Regulation G reconciliations Table 2: ETR adjusted earnings Reconciliation of GAAP to non-GAAP measures (Pre-tax except for income taxes and totals; $ in millions) 2024 2023 Net income (loss) attributable to ETR Corp. 1,056 2,357 Less adjustments: Utility - E-LA adjustment to a regulatory liability

  56. Slide 56: Regulation G reconciliations

    Regulation G reconciliations Table 2: ETR adjusted earnings Reconciliation of GAAP to non-GAAP measures (After-tax, per share in $) 2024 2023 Net income (loss) attributable to ETR Corp. 2.45 5.55 Less adjustments: Utility - Louisiana state income tax rate change, including an adjustment to E-LA’s as

  57. Slide 57: Utility book ROEs

    Utility book ROEs Table 3: Utility book ROE summary LTM ending December 31, 2024 ($ in millions) E-AR E-LA E-MS E-NO E-TX Utility1 As-reported earnings available to common stock (a) 325 888 256 16 292 1,827 Less adjustments: 1Q24 E-AR write-off of regulatory asset related to the opportunity sales pr

  58. Slide 58: ETR ETR

    5) entergy