Pure Gold Mining — Investor Presentation (June 2018)
29 slides from Pure Gold Mining's investor presentation, June 2018
Slide 1: Developing Ontario's next gold mine
Developing Ontario’s next gold mine. June 2018 PGM:TSX-V
Slide 2: Forward Looking Statement
FORWARD LOOKING STATEMENT Cautionary Statement on Forward-Looking Information & Statements This presentation contains certain forward-looking information and statements which may not be based on fact, including without limitation, statements regarding the Company’s expectations in respect of its fut
Slide 3: Madsen Gold Project
Pure Gold Mining MADSEN GOLD PROJECT There is a global scarcity of near-term, high grade, quality gold projects in mining friendly jurisdictions. Madsen is one of a select few. We aim to build a long life mine with highly attractive economics. We have a strong foundation. Madsen is extremely well pl
Slide 4: Team, Grade, Jurisdiction
Pure Gold Mining MADSEN GOLD PROJECT TEAM Owners team in place with expert technical knowledge Madsen Project mineral resources – 1,744,000 ozs at 8.7 g/t Gold GRADE in 6.24 Mt Indicated and 296,000 ozs at 7.9 g/t Gold in 1.16 Mt Inferred(1) JURISDICTION Red Lake, Ontario, Canada – an established mi
Slide 5: Company Builders
Pure Gold Mining COMPANY BUILDERS Extensive experience in project execution, operations, exploration, and capital markets with vision to become Canada’s next iconic gold company EXECUTIVE MANAGEMENT BOARD OF DIRECTORS Darin Labrenz, President, CEO & Director Graeme Currie, Chairman • Terrane Metals,
Slide 6: Capital Structure
Pure Gold Mining CAPITAL STRUCTURE Capital Structure (as at June 15, 2018) Key Shareholders (2) Shares Outstanding 256.3 million Management & Directors 3.2% Warrants Strategic Shareholders 28.2% Exercise price $0.85 until May 24, 14.5 million AngloGold Ashanti 14.9% 2020 expiry Evanachan (Robert McE
Slide 7: Madsen Gold Project, Red Lake Mining District
Red Lake Mining District CANADIAN HIGH GRADE GOLD BELT Madsen Gold Project 2.45 million oz HISTORICAL PRODUCTION (1) 1.74 million oz INDICATED RESOURCE (1) 0.30 million oz INFERRED RESOURCE (1) Current Project Mineral Resources(1): 1,744,000 ozs at 8.7 g/t Gold in 6.24 Mt Indicated 296,000 ozs at 7.
Slide 8: Madsen Development Plan
Red Lake Mining District MADSEN DEVELOPMENT PLAN Production Expansion Exploration MADSEN MINE RUSSET SOUTH / FORK +5km GOLD SYSTEM DFS and underground Two new satellite deposits Multiple targets with near development in progress Open for expansion surface gold mineralization; Production decision in
Slide 9: Low Capital, High Margin
Madsen Gold Project LOW CAPITAL, HIGH MARGIN 2017 PEA(1) Project Attributes • High grade 10.3 g/t • 14 year mine life HEAD GRADE • Low initial capital • Low permitting risk 0.91 million • Scalable operation with potential for expansions OZ GOLD LIFE OF MINE • Skilled workforce, locally sourced ~$51M
Slide 10: Infrastructure in Place
Madsen Gold Project INFRASTRUCTURE IN PLACE 200 m 9
Slide 11: Definitive Feasibility Study on Track
Madsen Gold Project DEFINITIVE FEASIBILITY STUDY ON TRACK DFS Fully funded study expected to complete in Q4 2018 Completed trade-off studies exploring use of Madsen #2 shaft Evaluated existing Tailings Management Facility (TMF) capacity and completed geotechnical investigation Completed unde
Slide 12: Bulk Sample Initiated
Madsen Gold Project BULK SAMPLE INITIATED • Targeting initial mining shapes that will underpin early years of production at Madsen • Recent drilling has defined a wide mineralized structure with strong vertical and lateral continuity • Highlights:(1) • 232.4 g/t gold over 5.2 m • 13.0 g/t gold over
Slide 13: Growth Through Exploration
Madsen Gold Project GROWTH THROUGH EXPLORATION 3 NEW SATELLITE DEPOSITS 14 DRILL READY TARGETS 47 KM2 LAND PACKAGE section • 3rd largest land package in Red Lake • Large high grade gold system that spans more than a five kilometre strike length • Controls on mineralization well understood • Wedge Ta
Slide 14: Multiple Gold Zones Open for Expansion
Madsen Target Settings MULTIPLE GOLD ZONES OPEN FOR EXPANSION (1) Further details are set out in the NI 43-101 technical report “Technical Report for the Madsen Gold Project - Restated Preliminary Economic Assessment and Initial Satellite Deposit Mineral Resource Estimates” with an effective date of
Slide 15: Satellite Deposits - Expansion
Madsen Gold Project SATELLITE DEPOSITS - EXPANSION Satellite Resources 96,000 OZ GOLD INDICATED 118,000 OZ GOLD INFERRED • Both Russet South and Fork deposits outcrop and are open for expansion • Both deposits are located approximately 1.5 km from existing milling infrastructure • Offers potential m
Slide 16: Exploration - Wedge Target
Madsen Gold Project EXPLORATION- WEDGE TARGET • Targeted gold structures controlling Madsen and Fork into Wedge Area • 3 km south by road from Madsen milling infrastructure • Highlights:(1) • 33.3 g/t Au over 8.3 m • 21.3 g/t Au over 10.3 m • 25.2 g/t Au over 2.1 m • 22.0 g/t Au over 2.0 m • 27.8 g/
Slide 17: Exploration - Wedge Target
Madsen Gold Project EXPLORATION- WEDGE TARGET • Near surface mineralization in multiple target areas with gold mineralization intersected over a strike distance of 1,000m and to depth of 500m (1) See news release dated October 31, 2016, January 31, 2018, March 22, 2018 and June 18, 2018 16
Slide 18: +5km Common Mineralized System
Madsen Property +5km COMMON MINERALIZED SYSTEM Oblique View Looking East Wedge Fork Fork Madsen McVeigh PG18-564 19.9 g/t Au/ Starratt 3.3m Russet PG16-198 Starratt South 34.0 g/t Au/ 11.0m Austin PG17-456 34.6 g/t Au/ 4.3m 8 Zone Significant AD-11-01 Gold Mineralized System, Scale Potential 14.3 g/
Slide 19: Proposed Timeline
Madsen Gold Project PROPOSED TIMELINE Planned development schedule – targeting production decision Q4 2018 18
Slide 20: Low Capital Hurdle
Pure Gold Mining LOW CAPITAL HURDLE Initial Project Capital vs. IRR 1400 Initial Project Capital (C$) Midas 1200 Bubble size represents market cap 1000 800 Falco 600 Continental Sabina 400 Victoria Eastmain Almaden Pure 200 Dalradian Equinox Gold IDM Harte 0 0 5 10 15 20 25 30 35 40 45 50 After-Tax
Slide 21: Emerging Canadian Developer
Madsen Gold Project EMERGING CANADIAN DEVELOPER Development • Definitive feasibility study underway • 7,200t bulk sample initiated • Environmental baseline work to support operational permitting • Production decision Q4 2018 Exploration • Surface drilling – increased by 21,000 metres with focus on e
Slide 22: Appendix
x< fa) z Ww ou o. <x
Slide 23: Current Mineral Resource
Madsen Gold Project CURRENT MINERAL RESOURCE Grade Contained Gold Deposit Classification Tonnes g/t Au (oz.) Madsen Indicated 5,785,000 8.9 1,648,000 Madsen Inferred 587,000 9.4 178,000 Fork Indicated 194,000 6.5 40,000 Fork Inferred 255,000 5.8 47,000 Russet South Indicated 259,000 6.7 56,000 Russe
Slide 24: PEA
Madsen Gold Project PEA 2017 PEA (1) Project Attributes Mineable Resource 3.0 Mt @ 10.3 g/t • Total gold production of ~911,500 Initial CAPEX ounces over a 14 year mine life at an $51 million average diluted head grade of 10.3 g/t gold (1) After-Tax Payback 2.8 years Underground mining operation C
Slide 25: PEA Details
Madsen Gold Project PEA DETAILS Parameters • Underground mining via a combination of conventional cut & fill and shrinkage methods • $50.9 million in pre-production capital costs over a 12-month period Majority of cost for mill upgrades, ramp and surface development New ventilation and dewaterin
Slide 26: Preliminary Economic Assessment
Madsen Gold Project PRELIMINARY ECONOMIC ASSESSMENT Initial Capital (C$50.9M) Low Capital Hurdle Total Initial Capital 50.9 (C$M) Underground Development Sustaining Capital 134.7 $14.3M (C$M) Electrical Mill $2.4M $9.6M Surface $4.8M Contingency $6.6M Mobile Scalable low capital platform Water Venti
Slide 27: Preliminary Economic Assessment
Madsen Gold Project PRELIMINARY ECONOMIC ASSESSMENT High Margin Detail (US$/oz @ US$1,275/oz) Low Cost Profile Power, $66 G&A, $112 Total Cash Cost 595 (US$/oz) Processing, $74 Mining Cost, All-in Sustaining Cash 714 $342 Cost (US$/oz) Sustaining Capital, $118 44% NET FCF Margin (pre-tax) per PEA @
Slide 28: Project Enhancement Opportunities
Madsen Gold Project PROJECT ENHANCEMENT OPPORTUNITIES Resource Expansion Potential • Ongoing exploration • Initial satellite deposits add 96,000 ounces indicated, 118,000 ounces inferred - open • Expansion opportunities at Madsen Optimization of Mine Plan • Investigate mechanized cut and fill and lo
Slide 29: Corporate Inquiries
Corporate Inquiries: Darin Labrenz President & CEO t: 604.646.8000 info@puregoldmining.ca PGM:TSX-V 1900 – 1055 West Hastings Street Vancouver, BC V6E 2E9 www.puregoldmining.ca