Pure Gold Mining Inc

Pure Gold Mining — Investor Presentation (June 2018)

29 slides from Pure Gold Mining's investor presentation, June 2018

  1. Slide 1: Developing Ontario's next gold mine

    Developing Ontario’s next gold mine. June 2018 PGM:TSX-V

  2. Slide 2: Forward Looking Statement

    FORWARD LOOKING STATEMENT Cautionary Statement on Forward-Looking Information & Statements This presentation contains certain forward-looking information and statements which may not be based on fact, including without limitation, statements regarding the Company’s expectations in respect of its fut

  3. Slide 3: Madsen Gold Project

    Pure Gold Mining MADSEN GOLD PROJECT There is a global scarcity of near-term, high grade, quality gold projects in mining friendly jurisdictions. Madsen is one of a select few. We aim to build a long life mine with highly attractive economics. We have a strong foundation. Madsen is extremely well pl

  4. Slide 4: Team, Grade, Jurisdiction

    Pure Gold Mining MADSEN GOLD PROJECT TEAM Owners team in place with expert technical knowledge Madsen Project mineral resources – 1,744,000 ozs at 8.7 g/t Gold GRADE in 6.24 Mt Indicated and 296,000 ozs at 7.9 g/t Gold in 1.16 Mt Inferred(1) JURISDICTION Red Lake, Ontario, Canada – an established mi

  5. Slide 5: Company Builders

    Pure Gold Mining COMPANY BUILDERS Extensive experience in project execution, operations, exploration, and capital markets with vision to become Canada’s next iconic gold company EXECUTIVE MANAGEMENT BOARD OF DIRECTORS Darin Labrenz, President, CEO & Director Graeme Currie, Chairman • Terrane Metals,

  6. Slide 6: Capital Structure

    Pure Gold Mining CAPITAL STRUCTURE Capital Structure (as at June 15, 2018) Key Shareholders (2) Shares Outstanding 256.3 million Management & Directors 3.2% Warrants Strategic Shareholders 28.2% Exercise price $0.85 until May 24, 14.5 million AngloGold Ashanti 14.9% 2020 expiry Evanachan (Robert McE

  7. Slide 7: Madsen Gold Project, Red Lake Mining District

    Red Lake Mining District CANADIAN HIGH GRADE GOLD BELT Madsen Gold Project 2.45 million oz HISTORICAL PRODUCTION (1) 1.74 million oz INDICATED RESOURCE (1) 0.30 million oz INFERRED RESOURCE (1) Current Project Mineral Resources(1): 1,744,000 ozs at 8.7 g/t Gold in 6.24 Mt Indicated 296,000 ozs at 7.

  8. Slide 8: Madsen Development Plan

    Red Lake Mining District MADSEN DEVELOPMENT PLAN Production Expansion Exploration MADSEN MINE RUSSET SOUTH / FORK +5km GOLD SYSTEM DFS and underground Two new satellite deposits Multiple targets with near development in progress Open for expansion surface gold mineralization; Production decision in

  9. Slide 9: Low Capital, High Margin

    Madsen Gold Project LOW CAPITAL, HIGH MARGIN 2017 PEA(1) Project Attributes • High grade 10.3 g/t • 14 year mine life HEAD GRADE • Low initial capital • Low permitting risk 0.91 million • Scalable operation with potential for expansions OZ GOLD LIFE OF MINE • Skilled workforce, locally sourced ~$51M

  10. Slide 10: Infrastructure in Place

    Madsen Gold Project INFRASTRUCTURE IN PLACE 200 m 9

  11. Slide 11: Definitive Feasibility Study on Track

    Madsen Gold Project DEFINITIVE FEASIBILITY STUDY ON TRACK DFS  Fully funded study expected to complete in Q4 2018  Completed trade-off studies exploring use of Madsen #2 shaft  Evaluated existing Tailings Management Facility (TMF) capacity and completed geotechnical investigation  Completed unde

  12. Slide 12: Bulk Sample Initiated

    Madsen Gold Project BULK SAMPLE INITIATED • Targeting initial mining shapes that will underpin early years of production at Madsen • Recent drilling has defined a wide mineralized structure with strong vertical and lateral continuity • Highlights:(1) • 232.4 g/t gold over 5.2 m • 13.0 g/t gold over

  13. Slide 13: Growth Through Exploration

    Madsen Gold Project GROWTH THROUGH EXPLORATION 3 NEW SATELLITE DEPOSITS 14 DRILL READY TARGETS 47 KM2 LAND PACKAGE section • 3rd largest land package in Red Lake • Large high grade gold system that spans more than a five kilometre strike length • Controls on mineralization well understood • Wedge Ta

  14. Slide 14: Multiple Gold Zones Open for Expansion

    Madsen Target Settings MULTIPLE GOLD ZONES OPEN FOR EXPANSION (1) Further details are set out in the NI 43-101 technical report “Technical Report for the Madsen Gold Project - Restated Preliminary Economic Assessment and Initial Satellite Deposit Mineral Resource Estimates” with an effective date of

  15. Slide 15: Satellite Deposits - Expansion

    Madsen Gold Project SATELLITE DEPOSITS - EXPANSION Satellite Resources 96,000 OZ GOLD INDICATED 118,000 OZ GOLD INFERRED • Both Russet South and Fork deposits outcrop and are open for expansion • Both deposits are located approximately 1.5 km from existing milling infrastructure • Offers potential m

  16. Slide 16: Exploration - Wedge Target

    Madsen Gold Project EXPLORATION- WEDGE TARGET • Targeted gold structures controlling Madsen and Fork into Wedge Area • 3 km south by road from Madsen milling infrastructure • Highlights:(1) • 33.3 g/t Au over 8.3 m • 21.3 g/t Au over 10.3 m • 25.2 g/t Au over 2.1 m • 22.0 g/t Au over 2.0 m • 27.8 g/

  17. Slide 17: Exploration - Wedge Target

    Madsen Gold Project EXPLORATION- WEDGE TARGET • Near surface mineralization in multiple target areas with gold mineralization intersected over a strike distance of 1,000m and to depth of 500m (1) See news release dated October 31, 2016, January 31, 2018, March 22, 2018 and June 18, 2018 16

  18. Slide 18: +5km Common Mineralized System

    Madsen Property +5km COMMON MINERALIZED SYSTEM Oblique View Looking East Wedge Fork Fork Madsen McVeigh PG18-564 19.9 g/t Au/ Starratt 3.3m Russet PG16-198 Starratt South 34.0 g/t Au/ 11.0m Austin PG17-456 34.6 g/t Au/ 4.3m 8 Zone Significant AD-11-01 Gold Mineralized System, Scale Potential 14.3 g/

  19. Slide 19: Proposed Timeline

    Madsen Gold Project PROPOSED TIMELINE Planned development schedule – targeting production decision Q4 2018 18

  20. Slide 20: Low Capital Hurdle

    Pure Gold Mining LOW CAPITAL HURDLE Initial Project Capital vs. IRR 1400 Initial Project Capital (C$) Midas 1200 Bubble size represents market cap 1000 800 Falco 600 Continental Sabina 400 Victoria Eastmain Almaden Pure 200 Dalradian Equinox Gold IDM Harte 0 0 5 10 15 20 25 30 35 40 45 50 After-Tax

  21. Slide 21: Emerging Canadian Developer

    Madsen Gold Project EMERGING CANADIAN DEVELOPER Development • Definitive feasibility study underway • 7,200t bulk sample initiated • Environmental baseline work to support operational permitting • Production decision Q4 2018 Exploration • Surface drilling – increased by 21,000 metres with focus on e

  22. Slide 22: Appendix

    x< fa) z Ww ou o. <x

  23. Slide 23: Current Mineral Resource

    Madsen Gold Project CURRENT MINERAL RESOURCE Grade Contained Gold Deposit Classification Tonnes g/t Au (oz.) Madsen Indicated 5,785,000 8.9 1,648,000 Madsen Inferred 587,000 9.4 178,000 Fork Indicated 194,000 6.5 40,000 Fork Inferred 255,000 5.8 47,000 Russet South Indicated 259,000 6.7 56,000 Russe

  24. Slide 24: PEA

    Madsen Gold Project PEA 2017 PEA (1) Project Attributes Mineable Resource 3.0 Mt @ 10.3 g/t • Total gold production of ~911,500 Initial CAPEX ounces over a 14 year mine life at an $51 million average diluted head grade of 10.3 g/t gold (1) After-Tax Payback 2.8 years  Underground mining operation C

  25. Slide 25: PEA Details

    Madsen Gold Project PEA DETAILS Parameters • Underground mining via a combination of conventional cut & fill and shrinkage methods • $50.9 million in pre-production capital costs over a 12-month period  Majority of cost for mill upgrades, ramp and surface development  New ventilation and dewaterin

  26. Slide 26: Preliminary Economic Assessment

    Madsen Gold Project PRELIMINARY ECONOMIC ASSESSMENT Initial Capital (C$50.9M) Low Capital Hurdle Total Initial Capital 50.9 (C$M) Underground Development Sustaining Capital 134.7 $14.3M (C$M) Electrical Mill $2.4M $9.6M Surface $4.8M Contingency $6.6M Mobile Scalable low capital platform Water Venti

  27. Slide 27: Preliminary Economic Assessment

    Madsen Gold Project PRELIMINARY ECONOMIC ASSESSMENT High Margin Detail (US$/oz @ US$1,275/oz) Low Cost Profile Power, $66 G&A, $112 Total Cash Cost 595 (US$/oz) Processing, $74 Mining Cost, All-in Sustaining Cash 714 $342 Cost (US$/oz) Sustaining Capital, $118 44% NET FCF Margin (pre-tax) per PEA @

  28. Slide 28: Project Enhancement Opportunities

    Madsen Gold Project PROJECT ENHANCEMENT OPPORTUNITIES Resource Expansion Potential • Ongoing exploration • Initial satellite deposits add 96,000 ounces indicated, 118,000 ounces inferred - open • Expansion opportunities at Madsen Optimization of Mine Plan • Investigate mechanized cut and fill and lo

  29. Slide 29: Corporate Inquiries

    Corporate Inquiries: Darin Labrenz President & CEO t: 604.646.8000 info@puregoldmining.ca PGM:TSX-V 1900 – 1055 West Hastings Street Vancouver, BC V6E 2E9 www.puregoldmining.ca

Pure Gold Mining — Investor Presentation (June 2018) on 6ix