ArcelorMittal South Africa Limited · JSE:ACL
ArcelorMittal South Africa — Corporate Update (May 2015)
28 slides from ArcelorMittal South Africa's corporate update, May 5, 2015
Slide 1: Newcastle Works
ArcelorMittal Newcastle Works 05 May 2015
Slide 2: Overview: ArcelorMittal South Africa
OVERVIEW: ARCELORMITTAL SOUTH AFRICA
Slide 3: Locations of operations
Locations of operations Vanderbijlpark Works • Gauteng province • 2 blast furnaces; 3 basic oxygen Vereeniging Works furnaces • Gauteng Province • Slabs, plates, hot-rolled, cold- • components for automotive rolled, electro galvanised (EGL), industry, Seamless tubes, Profiles tinplate, colour coated
Slide 4: ArcelorMittal SA Factor Dashboard National Summary
ArcelorMittal SA Factor Dashboard National Summary As South Africa's leading steel producer, ArcelorMittal South Africa plays a vital role in the economy. Total Direct GDP contribution reached R26bn or 1% in 2014 . This contribution is based on 's expenditure on raw materials, labour, capital expend
Slide 5: ArcelorMittal SA Factor Dashboard of Newcastle plant
ArcelorMittal SA Factor Dashboard of Newcastle plant Arcelormittal South Africa continues to play a vital role in the economy of KwaZulu-Natal province, with a total value addition of R3.5bn ( direct GDP) in 2014. ArcelorMittal SA’s Newcastle plant a key socio-economic contributor Total of R985 m in
Slide 6: Outlook for Q2 2015
Outlook for Q2 2015 Domestic demand remains under pressure while imports are still flowing into South Africa Production to be reduced further by 6% to 4 300tpd to reduce the steel stock on hand. Sales volumes expected to be lower due to market constraints (reduced export allocation) and due to
Slide 7: Overview: Newcastle Works
“_< ArcelorMittal OVERVIEW: NEWCASTLE WORKS
Slide 8: Newcastle Management Team
Newcastle Management Team Assistant Yvette Venter General Manager Gerald Gadd Works Manager: Works Manager: Works Manager: Works Manager: Manager: Manager: Primary Steelmaking, GM Iron Making Finishing & Dispatch, QM Secondary Rolling Eng. & Projects Coke & Chem Marketing: Long Planning & Logistics
Slide 9: Newcastle Works - Key Figures
Newcastle Works - Key Figures Key Indicators 2013 2014 Safety Performance, LTIFR 0.64 0.60 EBITDA R1029m - R122m Liquid steel Production (‘000 1 568 609 tons) Sales tons (‘000tons) 878 597 Percentage Domestic Sales 88% 86% Manpower (average FTEs per 1591 1547 permanent month) TCOE (Incl. own; HL & R
Slide 10: Production Flow and Equipment
Production Flow and Equipment MARKET 9
Slide 11: Projects: Blast Furnace N5
“_< ArcelorMittal PROJECTS BLAST FURNACE N5
Slide 12: Blast furnace N5 Reline
Blast furnace N5 Reline Project commenced on 12 May 2014 and was completed on 7 November 2014. Safety - 151 injuries (1 Fatality, 2 LTI’s). A total of 2.6 million man-hours was worked on site (at peak 2 400 people on site, of which 50% were local). Project duration of 179 days was 54 days lo
Slide 13: Blast furnace N5 rebuild
Blast furnace N5 rebuild New off-gas piping viewed from 93m New staves ready for installation Monster scaffold at the stockhouse 12
Slide 14: Blast furnace N5 rebuild
Blast furnace N5 rebuild Removal of old hopper Lancing the bear Row 6 staves installation Arrival of a portion of the new cyclone Site at night 13
Slide 15: Blast furnace N5 rebuild
Blast furnace N5 rebuild 14 Input stocks Removal of the down piping Rebar inventory ready for rolling to customer specifications Looking from the bottom up into the furnace Removal of the off-gas system
Slide 16: Economic spin-off
Economic spin-off • Of the R2 billion spent, R1.3 billion was made available for items or services available in South Africa. R392 million (or 30%) was spent in the northern KwaZulu-Natal region. • A total of R198 million in direct orders was placed with local vendors and a further R104 million was
Slide 17: Projects: Zero Effluent Discharge
PROJECTS ZERO EFFLUENT DISCHARGE
Slide 18: Zero Effluent Discharge
Zero Effluent Discharge
Slide 19: Background
Background Newcastle Works has been using the practice of irrigation to dispose of effluent since 1973. Newcastle Works decided to phase out this practice in accordance to Water Act passed in South Africa in 1998. According to the new act, no release of effluent to the river is allowed, this m
Slide 20: Technical Solution
Technical Solution The proposal was thus to segregate the effluent streams to enable correct treatment and recycling back into the process water distribution Between 2001 and 2014, the following plants were constructed: • Cold Lime softening plant: to remove the hardness salts from a cleaner str
Slide 21: Benefits of ZED
Benefits of ZED Phasing out of irrigation with effluent Treating and re-using all process effluent No effluent is discharged into the environment Reducing the raw water extraction to 500m3/hr (about 40% reduction) Complying with South African legal requirements 20 5/7/2015
Slide 22: Implementation of the Project
Implementation of the Project Total Cost to achieve ZED: R 428.83m Civil work: Steffanutti Stocks Civil consultant: Thompson van Eck Piping plus equipment installation : WABE Electrical supply to plant: Cato Ridge Electrical Safety Statistics: No LTIs, 1 RWDC, 13 First Aid 21 5/7/2015
Slide 23: Current Status & Achievements
Current Status & Achievements The Biological Treatment plant was commissioned in April 2014 and is successful in removing Ammonia, Phenols, Cyanide, and Organics from the effluent Started hot commissioning of the Reverse Osmosis Plant The Evaporator and Crystalliser Plant commissioned in Septe
Slide 24: Sustainability
“_< ArcelorMittal Sustainability
Slide 25: CAPEX spent on Environmental projects to date
CAPEX spent on Environmental projects to date Year Project Capital 2001 Old waste site cut-off trenches R3.5m 2003 & 2010 New waste site & phase 2 R49m 2003 - 2008 Water strategy (phases 1 – 4) R234m 2004 - 2011 Rehabilitation of historical dumps R33m 2000 - 2009 Air quality projects R69.3m 2008 – 2
Slide 26: Socio-economic Development
Socio-economic Development R8.2m spent in 2014 • 10 new homes in Blaauwbosch near Newcastle were built by employees during International solidarity holidays Science center • Signed an MOU for the Newcastle Science Center to assist the Department of Education with teacher development training • O
Slide 27: Communities
ArcelorMittal n 2 ¢ 5 € = fe) O
Slide 28: Thank You
“<— ArcelorMittal THANK YOU 27