  1. Slide 1: Rare Earths in a Sand Pit

    162.50 Dy For personal use only Investor presentation | October 2023 | ASX: AHK Rare Earths in a Sand Pit

  2. Slide 2: Disclaimer

    Disclaimer The information contained in this presentation has been provided by Ark Mines Ltd (Company) and other sources identified herein. The information contained in this presentation is for informational purposes only and is not a recommendation as to whether to invest in the Company’s shares. T

  3. Slide 3: Corporate snapshot

    Corporate snapshot Overview Share price and volume ASX Code AHK Shares on Issue 55m For personal use only Share price ~$0.19 Options on issue 15,172,500 Market capitalisation $10.00M Cash balance (approx.) $3.01M Top 20 shareholders Company personnel Name Position Experience Roger Jackson Executive

  4. Slide 4: A rare earth project with low start-up capex and low operational cost

    A RARE EARTH PROJECT WITH LOW START-UP CAPEX LOW OPERATIONAL COST AND NEAR-TERM DEVELOPMENT POTENTIAL WITH THE LOWEST SANDY ENVIRONMENTAL IMPACT MITCHELL For personal use only HOSTS ALL THE RARE EARTHS, PLUS HEAVY MINERAL, THE ONLY INLAND NIOBIUM AND PHOSPHATE SURFACE EXPRESSED THE PROJECT HAS ACCES

  5. Slide 5: Sandy Mitchell REE HM Project location

    Sandy Mitchell REE HM Project location For personal use only 300km west of Cairns and 100km North of Chillagoe Sits on only one station – 750,000 acres in size

  6. Slide 6: The Sandy Mitchell Project

    THE SANDY MITCHELL PROJECT SANDY ➢ 147km2 EPM 28013 ‘Sandy Mitchell’ – an advanced Rare Earths Project in North Queensland ➢ The sand hosts grains of mostly monazite (light rare earths) but also Xenotime (heavy rare earths) and Zirconium's and Titanium’s and Niobium MITCHELL ➢ Total Rare Earth Oxide

  7. Slide 7: Scale

    SCALE • The size of the thorium anomaly correlating with REE enriched alluvial sands within the Project tenement is 10,067 ha. • Sands with Heavy Minerals and Rare Earths are eroded from Sandstones to the North. These sandstones were paleao beach settings where the rare earths and Heavys were sorted

  8. Slide 8: Continuous rehabilitation at Sandy Mitchell

    CONTINUOUS REHABILATION AT SANDY MITCHELL Sparse grass with some small trees For personal use only Sand – average 10m from surface Mining Direction Metamorphic Basement LOW IMPACT MINING LOW ENVIRONMENTAL IMPACT ✓ No Drill and Blast ✓ No Chemicals ✓ No overburden ✓ No Salts No Acids ✓ No clay to dea

  9. Slide 9: Well advanced compared to other rare earth projects

    Well advanced compared to other rare earth projects PLACER DEPOSITS HAVE DISTINCT ADVANTAGES OVER HARD ROCK ADD CLAY-BASE RARE EARTH PROJECTS Ionic Clays Hard Rocks PLACER (SANDY MITCHELL) For personal use only Capex Heavy, Overburden/strip development costs, Mining Capex lite and utilizing low-cost

  10. Slide 10: Combined company investment highlights

    Combined company investment highlights Phase 2 drilling program underway now at Sandy Mitchell, undertake further metallurgical test work and apply for Mining Licence For personal use only Advancing processing and off-take discussions – considerable interest in Sandy Mitchell from local processors a