Eldorado Gold Corporation · TSX:ELD

Eldorado Gold — Investor Presentation (August 2025)

66 slides from Eldorado Gold's investor presentation, Aug 1, 2025

  1. Slide 1: Investor Presentation August 2025

    INVESTOR PRESENTATION AUGUST 2025 Skouries operations team – July 2025

  2. Slide 2: Forward Looking Statement

    Forward Looking Statement Definitions and Photos: Capitalized terms used in this presentation but not otherwise defined herein have the meanings ascribed thereto in the Management’s Discussion and Analysis dated July 31, 2025 of Eldorado Gold Corporation for the three and six months ended June 30, 2

  3. Slide 3: Non-IFRS Measures

    Non-IFRS Measures Certain non-IFRS financial measures and ratios are included in this presentation, including total cash costs ($/oz sold), all-in sustaining costs ("AISC") ($/oz sold), adjusted net earnings, adjusted net earnings per share, adjusted EBITDA, cash flow from operating activities befor

  4. Slide 4: Diversified Portfolio of Long-Life, High-Quality Assets

    Diversified Portfolio of Long-Life, High-Quality Assets Kassandra Mines, GREECE Diverse Asset Portfolio ⚫ Olympias ⚫ Skouries ⚫ Stratoni • Operations in Türkiye, Greece and Canada ⚫ Olympias, GREECE (15-year mine life) 2024 Au Production 69,532 oz • 11.9 Moz of P&P gold reserves(2) 2024 AISC/oz sold

  5. Slide 5: Strong Investment Rationale

    Strong Investment Rationale Eldorado is driving investor returns by focusing on four key areas Pipeline of Strategic Focused Attractive Financial Growth Projects on Sustainability Valuation Position • Our Sustainability Integrated • Advancing high-quality Greek assets • Cash and cash equivalents of

  6. Slide 6: Upcoming Value Drivers

    Upcoming Value Drivers Focused on upcoming value drivers CORPORATE • Multi-year guidance demonstrates 33% growth on gold production over three-year period, based on 2024 production TÜRKIYE • Kışladağ Engineering and geometallurgical studies focused on the understanding of future mining phases and op

  7. Slide 7: 2025 Guidance and 3-Year Growth Profile

    2025 Guidance and 3-Year Growth Profile Growing production with significant upside from Skouries Au & Cu production 2025 3-YEAR PRODUCTION OUTLOOK(3): GOLD INCREASING 43% FROM 2023 TO 2027 GOLD PRODUCTION: 460,000 – 500,000 oz COPPER PRODUCTION STARTING IN 2026 800 ~43% Growth 80 TOTAL CASH COSTS(1)

  8. Slide 8: Attractive Valuation

    Attractive Valuation Advancing high-quality Greek assets creates re-rating potential Consensus P/NAV Consensus EV/2025E EBITDA(1) Source: FactSet; data as of July 31, 2025 Source: FactSet; data as of July 31, 2025 (1) These are non-IFRS financial measures or ratios. See Slide 2 ‘Non-IFRS Measures’ f

  9. Slide 9: Strong Financial Position

    Strong Financial Position Focus on maintaining solid financial position providing flexibility to unlock value across our business Liquidity Position(1,2) (as of June 30, 2025) TOTAL LIQUIDITY: $1.13 billion Cash and cash equivalents + availability on senior secured credit facility 49 CASH & CASH EQU

  10. Slide 10: Skouries

    Skouries High-grade gold-copper porphyry deposit that is a key driver of Eldorado’s growth story OVERVIEW ADVANCING SKOURIES Location Halkidiki Peninsula, Greece • €680 M financing package (including additional cost overrun facility) secured for the development of Deposit type Gold-copper porphyry S

  11. Slide 11: Skouries Project Update: Capital Cost & Schedule

    Skouries Project Update: Capital Cost & Schedule Commercial production expected mid-2026; Initial 20-year mine life with robust economics Project Capital Variance Accelerated Operational Capital $86 $21 $1,063 CAPITAL COST ESTIMATE: $1.06 B $36 ACCELERATED MINING COST ESTIMATE: $154 M $920 $154 US$

  12. Slide 12: Skouries: Recent Achievements

    Skouries: Recent Achievements Skouries progressing to plan: First production expected in Q1 2026 and commercial production in mid-2026; Construction project capital invested since restart of construction to June 30, 2025: $705.7 million Q2 2025 HIGHLIGHTS • Q2 2025 project capital: $117 million and

  13. Slide 13: Skouries Progress: September 2024 through July 2025

    Skouries Progress: September 2024 through July 2025 12

  14. Slide 14: Process Plant

    Process Plant Piping and cable installations continued and mechanical installations are proceeding in the support infrastructure areas July 2025 September 2024 13

  15. Slide 15: Process Plant – West Side Infrastructure

    Process Plant – West Side Infrastructure Process plant substation, lime plant and flotation blower buildings structurally complete. The control building fourth floor concrete is complete with work progressing on the final elevation. Secondary substation Process compressor building Process control bu

  16. Slide 16: Process Plant – East Side Infrastructure

    Process Plant – East Side Infrastructure Installation of the equipment for the lime plant silos has been completed, with cladding and roofing work having started in July. The foundation for the guar plant, which is the last structure to be completed, has commenced, and the mechanical construction of

  17. Slide 17: Thickeners

    Thickeners Concrete works and mechanical installations for two (of three) thickeners are complete. Work is advancing on the associated infrastructure with the pumphouse building structural and mechanical rough set complete, and pipe rack construction advancing. Thickener #2 Thickener #1 Water storag

  18. Slide 18: Filtered Tailings Building

    Filtered Tailings Building Filtered tailings building: Structural steel installation is 75% complete as July 31, and mechanical work progressed with the installation of the six feeder conveyors and the collector conveyor completed in June – advancing as planned July 2025 September 2024 17

  19. Slide 19: Primary Crusher

    Primary Crusher The concrete work advanced to the 2nd of three elevations; apron feeder and associated chutes installed; bottom shell of primary crusher pre-assembled, expected to be installed in August June 2025 September 2024 Primary Crusher installation – completion expected in September 18

  20. Slide 20: Coarse Ore Stockpile & Reclaim Feed Tunnel

    Coarse Ore Stockpile & Reclaim Feed Tunnel Conveyor foundations between the primary crusher and coarse ore stockpile are advancing along with the stockpile dome foundations. The reclaim tunnel concrete and escape tunnel concrete are complete. Pre-assembly of the three reclaim feeders and associated

  21. Slide 21: Skouries: Advancing Construction

    Skouries: Advancing Construction July 2025 20

  22. Slide 22: Skouries: Fully Funded with Strategic Project Financing Partners

    Skouries: Fully Funded with Strategic Project Financing Partners Maximizing shareholder value with well-aligned strategic partnerships Key Features of Term Facility PROJECT IS • Non-recourse to Eldorado; secured by Hellas Gold FULLY FUNDED • Blended interest rate of approximately 6%(1) • 10-year ter

  23. Slide 23: Skouries: Land Reclamation in Parallel with Mining Activity

    Skouries: Land Reclamation in Parallel with Mining Activity Bringing the mine progressively back to as close to its original condition as early as possible TAILINGS MANAGEMENT SUPPORTS PROGRESSIVE RECLAMATION • Tailings are a by-product of the extraction process • At Skouries – we are utilizing filt

  24. Slide 24: Lamaque Complex

    Lamaque Complex Underground gold mine located in Val-d’Or, Québec. The high-grade orogenic Triangle deposit feeds the current mine life. OVERVIEW EXPLORATION UPSIDE Location Québec, Canada • Ormaque and Triangle deposits remain open at depth Ownership 100% • Large resource base and exploration upsid

  25. Slide 25: Lamaque Complex

    Lamaque Complex Strong Q2 production driven partially by early processing of a portion of the second bulk sample at Ormaque Q2 2025 HIGHLIGHTS • Q2 gold production of 50,640 oz at total cash costs(1) of $721/oz sold • Production in Q2 2025 impacted by: Higher throughput in the quarter driven by earl

  26. Slide 26: Lamaque Complex: Advancing Ormaque

    Lamaque Complex: Advancing Ormaque Second bulk sample partially processed in Q2 2025. First round drilling Maintenance bay 25

  27. Slide 27: Kışladağ

    Kışladağ Kışladağ is a low-grade, bulk-tonnage, open pit operation that uses heap leaching for gold recovery OVERVIEW ENHANCING EFFICIENCIES Location Uşak Province, Türkiye • Investment focused on closing the HPGR circuit on track for an update with Q3 2025 results Ownership 100% • A decision has be

  28. Slide 28: Kışladağ

    Kışladağ Celebrated the four millionth ounce produced in May; cumulatively five million ounces have been produced in Türkiye Q2 2025 HIGHLIGHTS • Q2 gold production of 46,058 oz at total cash costs(1) of $1,133/oz sold • Production in Q2 2025 benefited from: Continued leaching of gold ounces stacked

  29. Slide 29: Kışladağ: Improving irrigation engineering

    Kışladağ: Improving irrigation engineering Sub-cell collection system Deep ripping system 28

  30. Slide 30: Kışladağ: Completed North-ADR Plant

    Kışladağ: Completed North-ADR Plant North-ADR plant First gold pour in late October 2024 Top: Aerial view of North-ADR plant and infrastructure; Bottom: Interior of North-ADR plant 29

  31. Slide 31: Efemçukuru

    Efemçukuru High-grade underground operation located in Izmir Province in western Türkiye OVERVIEW MAINTAIN CONSISTENT PRODUCTION Location İzmir Province, Türkiye • Efemçukuru focused on continuous improvement Ownership 100% • Efemçukuru met annual production guidance for 10th consecutive year, since

  32. Slide 32: Efemçukuru

    Efemçukuru Inline quarter – production and cost Q2 2025 HIGHLIGHTS • Q2 gold production of 21,093 oz at total cash costs(1) of $1,335/oz sold • Gold grade, throughput, and production inline with expectations Q2 2025 2025 Guidance Gold Production 21,093 oz 70 – 80 K oz Total cash costs ($/oz sold)(1)

  33. Slide 33: Olympias

    Olympias Carbonate replacement style deposit with high gold grades and an orebody that will allow for increased mining rates OVERVIEW FOCUS ON GROWTH Location Halkidiki Peninsula, Greece • Continue to deliver Olympias productivity Ownership 100% improvements and expand processing plant capacity from

  34. Slide 34: Olympias

    Olympias Gold production during the quarter increased by 35% and total cash costs(1) decreased by 34% compared to Q1 2025 Q2 2025 HIGHLIGHTS • Q2 gold production of 15,978 oz at total cash costs(1) of $1,578/oz sold • Production in Q2 2025 benefited from: Sustained improvements in mining productivit

  35. Slide 35: Environmental Rehabilitation at Olympias

    Environmental Rehabilitation at Olympias Eldorado restored over 32 acres of an area that was used by a previous operator to improperly dispose of tailings containing arsenopyrite. Before restoration work (2012) After restoration work (2021) RESTORATION OF OLD OLYMPIAS ARSENOPYRITE CONCENTRATE STORAG

  36. Slide 36: Perama Hill

    Perama Hill Low-cost epithermal gold-silver project with transformative growth potential OVERVIEW SUPPORTS THE GROWTH PIPELINE Location Thrace, Greece • Next mine expected to be developed after Skouries Ownership 100% • Exploration potential in the Thrace region Mine type Open pit supports opportuni

  37. Slide 37: Perama Hill

    Perama Hill Upcoming catalysts • Social & Environmental Due Diligence – Ongoing (2025) • Project optimization and studies are ongoing to prepare permitting documentation Future developments • EIA submission • EIA Approval & Presidential Decree (PD) issued • Submission of full Social & Environmental

  38. Slide 38: Exploration

    Exploration 7) eldorado gold 37

  39. Slide 39: 2025 Exploration: Focused in Eldorado's Operating Jurisdictions

    2025 Exploration: Focused in Eldorado’s Operating Jurisdictions Includes In-Mine Resource Conversion and Expansion Drilling, Drill Testing Multiple Near-Mine and Early-Stage Targets, as well as Generating Projects and New Targets through Generative Initiatives Generate & Grow Expand & Enhance Suppor

  40. Slide 40: Climate Change Strategy – Our GHG Emissions Mitigation Target

    Climate Change Strategy – Our GHG Emissions Mitigation Target Mitigate GHG emissions by an amount equal to 30% of our 2020 baseline by 2030, on a “business-as-usual” basis(1) Journey to Decarbonization Our GHG Emissions Mitigation Target Achievement Pathway • Eldorado implemented 21,255 tCO2e of GHG

  41. Slide 41: ESG Recognized as a Key Priority

    ESG Recognized as a Key Priority Eldorado ESG performance as a mid-cap miner includes recognition of strong sustainability management practices ESG Rating Performance Recognition for Responsible Mining Canada’s Best Companies in 2025 by • MAC-TSM Level AAA on Tailings Management TIME and Statista at

  42. Slide 42: Appendix

    >< Q Zz uu o. o. Sg

  43. Slide 43: Eldorado Gold Executive Management Team

    Eldorado Gold Executive Management Team Experienced Operators Supported by a Committed and Proven Leadership Team Executive Leadership George Burns Paul Ferneyhough Frank Herbert Simon Hille Louw Smith President & CEO EVP & CFO EVP, GC, and Chief EVP, Technical Services EVP, Development, Compliance

  44. Slide 44: Eldorado Share Price Performance

    Eldorado Share Price Performance Relative Share Price Performance Capital Structure Common Shares 203,199,350 outstanding(1) Share purchase options(1,2) 2,773,305 Performance share units(1) 1,044,489 Closing share price(3) $20.50 (NYSE: EGO) Market Capitalization(3,4) $4.3 B 52-week Share Price $13.

  45. Slide 45: Q2 2025 Operations Update

    Q2 2025 Operations Update Strong operational performance during Q2 2025: maintaining full year production guidance, expect to be at or above the high end of the cost guidance Q2 2025 2025 Guidance Total Cash Total Cash Asset Production (oz) AISC(1) ($/oz) Production (K oz) AISC(1) ($/oz) Costs(1) ($

  46. Slide 46: 2025 Production & Cost Guidance

    2025 Production & Cost Guidance Kışladağ, Türkiye Lamaque Complex, Canada 2025 GOLD PRODUCTION BY MINE(3) Type Open pit Type Underground Gold Production 160 – 170 Koz Gold Production 170 – 180 Koz 14% Total Cash Costs(1,2) $1,020 – $1,120 Total Cash Costs(1,2) $790 – $890 AISC(1,2) $1,200 – $1,300 A

  47. Slide 47: 3-Year Operating Outlook

    3-Year Operating Outlook Gold production (midpoint) increasing 33% over 3 years driven by growth projects Gold Production (000’ oz) 2024A(1) 2025E 2026E(2) 2027E Lamaque Complex 197(1) 170 – 180 180 – 190 175 – 185 Kışladağ 174 160 – 170 135 – 145 165 – 175 Efemçukuru 80 70 – 80 75 – 85 70 – 80 Olym

  48. Slide 48: Hedge Portfolio

    Hedge Portfolio Managing gold and copper downside price exposure Skouries Project Finance Related Hedges Gold Hedges - Zero Cost Collar • Gold and copper swaps for delivery on June 30, 2026, as follows: • Mitigate volatility risk of the gold price during a period of elevated investment in the Skouri

  49. Slide 49: Sustainability Framework and SIMS

    Sustainability Framework and SIMS SIMS minimum performance standards operationalize our Framework’s four key commitments to ESG-related topics Healthy Environments Now Safe, Inclusive and Responsibly Produced & The Future Engaged & Prosperous Innovative Operations Products Communities • Implementing

  50. Slide 50: Inclusive Diversity

    Inclusive Diversity Committed to fostering safe and inclusive workplaces that value diversity, personal growth and innovation​ Global Initiatives Operating Sites • Updated Equity, Diversity & Inclusion Strategy created with input GREECE from the global employee workforce • 2024 Sustainability Bronze

  51. Slide 51: World Gold Council: Gold 247

    World Gold Council: Gold 247 What is Gold 247 Gold Why Now? The World Gold Council’s strategic vision for 247TM Gold has a systemic role in the world’s transforming the global gold market and economy – as an investment, a reserve elevating gold into the mainstream of asset, a source of employment an

  52. Slide 52: Why Gold & Where do we see Gold Price Moving

    Why Gold & Where do we see Gold Price Moving Now is the time for generalists. Long-Term Store of Value: ▪ Gold has been used as a store of value for thousands of years. ▪ During geopolitical turmoil or financial crises, investors often flock to gold as a Relative Performance over 20-years Relative P

  53. Slide 53: 2025 Full Year Gold Outlook

    2025 Full Year Gold Outlook: central banks and ETF investors likely to drive demand with economic uncertainty supporting gold’s role as a risk hedge Gold Demand Hit New Record in 2024 Central Banks – Buyers for 15 Consecutive Years Quarterly gold demand in volume, tonnes, and value, US$bn(1) Annual

  54. Slide 54: Financial Results

    Financial Results ($ millions unless otherwise noted) Q2 2025 Q1 2025 YTD 2025(4) 2024 2023 2022 Operating Metrics Realized Gold Price ($/oz) 3,270 2,933 3,112 2,405 1,944 1,787 Gold produced (oz) 133,769 115,893 249,662 520,293 485,139 453,916 Total cash costs(1) ($/oz sold) 1,064 1,153 1,106 940 8

  55. Slide 55: Historical Operating Results – Lamaque Complex

    Historical Operating Results – Lamaque Complex Q2 2025(2) YTD 2025(3) FY 2024(2) Q1 2025 Q4 2024(2) Q3 2024 Q2 2024 Operating Data Tonnes milled 251,573 499,822 943,509 248,549 256,628 232,165 220,157 Head grade (g/t Au) 6.62 6.00 6.74 5.38 8.05 6.03 6.95 Average recovery rate 94.7% 94.3% 96.1% 94.0

  56. Slide 56: Historical Operating Results – Kışladağ

    Historical Operating Results – Kışladağ Q2 2025 YTD 2025(2) FY 2024 Q1 2025 Q4 2024 Q3 2024 Q2 2024 Operating Data Tonnes placed on pad 3,368,735 6,563,465 13,123,978 3,194,730 3,434,938 3,511,662 3,415,604 Head grade (g/t Au) 0.74 0.77 0.81 0.79 0.70 0.86 0.92 Gold ounces produced 46,058 90,377 174

  57. Slide 57: Historical Operating Results – Efemçukuru

    Historical Operating Results – Efemçukuru Q2 2025 YTD 2025(3) FY 2024 Q1 2025 Q4 2024 Q3 2024 Q2 2024 Operating Data Tonnes milled 134,064 261,849 541,782 127,785 138,837 131,374 134,540 Head grade (g/t Au) 5.75 5.64 5.39 5.52 5.32 5.37 5.92 Average recovery rate (to concentrate) 92.2% 92.0% 91.9% 9

  58. Slide 58: Historical Operating Results – Olympias

    Historical Operating Results – Olympias Q2 2025 YTD 2025(3) FY 2024 Q1 2025 Q4 2024 Q3 2024 Q2 2024 Operating Data Tonnes milled 118,475 217,077 446,732 98,602 109,186 124,374 94,575 Head grade (g/t Au) 8.21 7.96 8.54 7.65 8.05 9.16 8.11 Gold average recovery rate (to concentrate) 76.5% 76.1% 82.3%

  59. Slide 59: Mineral Reserves (Gold, Silver) as of September 30, 2024

    Mineral Reserves (Gold, Silver) as of September 30, 2024 Project Proven Mineral Reserves Probable Mineral Reserves Total Proven and Probable Tonnes Au Contained Au Tonnes Au Contained Au Tonnes Au Contained Au Gold (x1000) g/t ounces (x1000) (x1000) g/t ounces (x1000) (x1000) g/t ounces (x1000) Efem

  60. Slide 60: Mineral Reserves (Copper, Lead, Zinc) as of September 30, 2024

    Mineral Reserves (Copper, Lead, Zinc) as of September 30, 2024 Project Proven Mineral Reserves Probable Mineral Reserves Total Proven and Probable Tonnes Cu Contained Cu Tonnes Cu Contained Cu Tonnes Cu Contained Cu Copper (x1000) % tonnes (x1000) (x1000) % tonnes (x1000) (x1000) % tonnes (x1000) Sk

  61. Slide 61: Mineral Resources (Gold, Silver) as of September 30, 2024

    Mineral Resources (Gold, Silver) as of September 30, 2024(1) Project Measured Resources Indicated Resources Total Measured and Indicated Inferred Resources Tonnes Au Contained Au Tonnes Au Contained Au Tonnes Au Contained Au Tonnes Au Contained Au Gold (x1000) g/t ounces (x1000) (x1000) g/t ounces (

  62. Slide 62: Mineral Resources (Copper, Lead, Zinc) as of September 30, 2024

    Mineral Resources (Copper, Lead, Zinc) as of September 30, 2024 Project Measured Resources Indicated Resources Total Measured and Indicated Inferred Resources Contained Contained Contained Contained Tonnes Cu Cu tonnes Tonnes Cu Cu tonnes Tonnes Cu Cu tonnes Tonnes Cu Cu tonnes Copper (x1000) % (x10

  63. Slide 63: Notes on Mineral Resources and Reserves

    Notes on Mineral Resources and Reserves General Mineral Reserves and Mineral Resources are as of September 30, 2024 The Mineral Reserves and Mineral Resources were classified using logic consistent with the CIM Definition Standards for Mineral Resources & Mineral Reserves (2014) incorporated, by ref

  64. Slide 64: Notes on Mineral Reserves (cont'd)

    Notes on Mineral Reserves (cont’d) Mineral Reserve Notes Eldorado reports Mineral Reserves in accordance with CIM Definition Standards. Mineral Reserves for the operating sites (Efemcukuru, Kisladag, Olympias, and within the Lamaque Complex – Ormaque and Triangle) were determined using a long-term g

  65. Slide 65: Notes on Mineral Resources

    Notes on Mineral Resources Mineral Resource Notes: Eldorado reports Mineral Resources in accordance with CIM Definition Standards. All Mineral Resources are assessed for reasonable prospects for eventual economic extraction (RPEEE). The Resource cut-off grades or values (e.g. gold equivalent) are de

  66. Slide 66: Thank You

    Thank You TSX: ELD NYSE: EGO eldoradogold.com

Eldorado Gold — Investor Presentation (August 2025) on 6ix