Slide 1: Vickery Extension Project – CCC Meeting
Whitehaven Coal Limited VICKERY EXTENSION PROJECT – CCC MEETING 11 APRIL 2016
Slide 2: Agenda
Agenda Topic Introduction Project description Environmental assessment update Community consultation General business Date and agenda for next meeting 2
Slide 3: Introduction
Introduction Present and apologies. Declaration of pecuniary or other interests. Previous minutes. 3
Slide 4: Project Description
Project Description Vickery Coal Project (Approved Mine) approved by DP&E 19 September 2014. Vickery Extension Project: • Increase in ROM extraction rate from 4.5 Mtpa to 10 Mtpa. • Increase in open cut mining footprint (including mining of Vickery South). • Construction and operation of an on-s
Slide 5: Project Description - Approved Mine
Project Description - Approved Mine 5
Slide 6: Project Description - Extension Project
Project Description - Extension Project 6
Slide 7: Project Description - Rail
Project Description - Rail > WHITEHAVEN COAL ‘Mining Tenement Boundory (MLB Cl) Eeplration Tenement Boundary (EL & AUTH) Segab Coal Nine - oposed Ally Infrostrudure Areas Extension Project Components Extent of Open Cut Extent of Out of Pit Waste Rock Emplacement Inhostrocture Area. Topol Stedgile In
Slide 8: Operational Workforce
Operational Workforce Operational workforce of approximately 450 full time equivalent personnel (increase of approximately 200 personnel from the Approved Mine). In keeping with Whitehaven’s local employment policies it is anticipated that approximately will be 70% local hires distributed across
Slide 9: Construction Workforce
Construction Workforce Construction workforce of approximately 500 full time equivalent personnel. Assumed to be non-local hires for purpose of impact assessment. Estimate that 90% of construction workforce would reside in the Boggabri accommodation camp. 9
Slide 10: Employee Vehicle Movements
Employee Vehicle Movements Access to site via existing sealed roads from Gunnedah and Boggabri: • Blue Vale Road • Rangari Road • WHC private haul road Road Transport Assessment to assess potential impacts to road network. 10
Slide 11: Environmental Assessment Update
Environmental Assessment Update State Significant Development assessment process 11
Slide 12: Environmental Impact Statement
Environmental Impact Statement Environmental Impact Statement currently being prepared. Anticipate EIS lodgement mid 2016. Specialist Assessments Groundwater Assessment Road Transport Assessment Surface Water Assessment Socio-economic Assessment Flooding Assessment Historic Heritage Assessment N
Slide 13: Community Consultation
Community Consultation CCC meeting 11 April 2016. Project newsletter to be distributed. Community information session and second CCC meeting to be held late May. One-on-one meetings with neighbours. Engagement with local councils. 13
Slide 14: Community Consultation
Community Consultation General business. Date and agenda for next meeting. Questions? 14
Slide 15: Thankyou for your attendance
Thankyou for your attendance 15