Aura Energy Ltd · ASX:AEE

Aura Energy — Investor Presentation (June 2021)

21 slides from Aura Energy's investor presentation, June 2021

  1. Slide 1: Zero Emission Uranium Investor Presentation

    ASX:AEE AIM:AURA ZERO EMISSION Investor Presentation URANIUM June 2021

  2. Slide 2: Disclaimer

    DISCLAIMER This document, any attachments and the oral presentation on the slides (together the "Presentation") have been prepared and are being supplied to you by Aura Energy Limited (the "Company") solely for information purposes in connection with a potential offering of securities by the Company

  3. Slide 3: Investment Highlights

    INVESMENT HIGHLIGHTS • The Tiris Emission Free Uranium Project is a low capex project based on a major greenfields uranium discovery in Mauritania • 49 Mlb U3O8 resources from 66 mt @ 334 ppm U3O8 • Definitive Feasibility Study completed1: • Low capital cost of US$62.9 million • Low C1 cash cost of

  4. Slide 4: Corporate Snapshot

    CORPORATE SNAPSHOT Aura Energy (ASX:AEE) is focused on the development of its low-capex, Zero Emission Tiris Uranium Project to meet the increasing demand for uranium, as the world shifts towards a decarbonised global energy system. The Tiris Uranium Project is a major greenfields uranium discovery

  5. Slide 5: Board and Management

    BOARD AND MANAGEMENT PETER REEVE – CEO & MANAGING DIRECTOR • Over 35 years in the Australian resources industry - a metallurgist and has held positions with Rio Tinto, Shell-Billiton, Newcrest and Normet Consulting. • 7 years at JB Were as a Resource Specialist Fund Manager and Resource Corporate Fi

  6. Slide 6: Project Overview

    PROJECT OVERVIEW WORLD CLASS PROJECTS FOR THE ENERGY TRANSITION TIRIS URANIUM – MAURITANIA – 100% HÄGGÅN VANADIUM – SWEDEN 100% COMPLETED DEFINITIVE FEASIBILITY STUDY H I G H G R A D E B AT T E R Y M E TA L S • Low capital cost of US$62.9 million • 15.2 Billion lb Indicated + Inferred • Low C1 cash

  7. Slide 7: Project Advancement Initiatives

    PROJECT ADVANCEMENT INITIATIVES The Company has committed to undertake a series of activities to enhance and further advance the project towards near-term development, as per the outlined below: • Update the Tiris Resource with additional existing Sadi drillholes • Water drilling program to enhance

  8. Slide 8: Project Advancement Initiatives

    PROJECT ADVANCEMENT INITIATIVES Activity Description Indicative Timeframe Cost Tiris Vanadium • 3,000 existing sample pulps from drilling in 2011 will be resubmitted for assay for vanadium. Q3 2021 $80,000 Estimate • Several dozen drill holes from Sadi South to be submitted for assay, with a resourc

  9. Slide 9: Tiris Uranium Project

    TIRIS URANIUM PROJECT BUILDING BLOCKS TO PRODUCTION AND CASHFLOW PROJECT • Definitive Feasibility Study Completed • Further resource expansion initiatives planned for Q2 & Q3 2021 • Production and first cashflow target - 1 year from project go-ahead Mauritania URANIUM OFFTAKE EXECUTED* • 800,000 lbs

  10. Slide 10: Definitive Feasibility Study

    DEFINITIVE FEASIBILITY STUDY L O W C A P E X & L O W O P E R AT I N G C O S T PROJECT ATTIBUTES: • Shallow flat-lying surface mineralisation • Low-cost mining • Simple extraction method KEY OUTCOMES OF THE STUDY WERE: • Low capital cost of US$62.9 million • Low C1 cash cost of US$25.43/lb U3O8 • All

  11. Slide 11: Shallow Trenching

    SHALLOW TRENCHING REVEALS URANIUM CALCRETE DEPOSIT WITH M I N E R A L I S AT I O N CARNOTITE URANIUM IN A W E AT H E R E D G R A N I T E H O S T • Free Digging Mining • No Drill and Blast • Permitting in a remote desert location URANIUM M I N E R A L I S AT I O N AS CARNOTITE 11

  12. Slide 12: Simple Ore Upgrade

    SIMPLE ORE UPGRADE EMISSION FREE URANIUM FOR THE ENERGY TRANSITION 12

  13. Slide 13: Aura Energy Peer Comparison

    AURA ENERGY PEER COMPARISON L O W C A P E X , L O W O P E R A T I N G C O S T, L O W M A R K E T C A P Low Capital = Do-able Project Low AISC = Positive Cashflow US$21.00 Low Market Cap = Value Generation US$17.15 US$37.00 US$29.81 US$31.20 *Bubble size = AISC US$/lb U308 * Comparisons between proje

  14. Slide 14: The Uranium Market

    THE URANIUM MARKET S U P P LY & D E M A N D SUPPLY DEFICIT • Uranium consumed globally per year is -20Mlbs more than the amount that is mined annually, creating a significant supply deficit. COVID DISRUPTION • The global pandemic has impacted upon production resulting in a further deficits, with pro

  15. Slide 15: The Uranium Market

    THE URANIUM MARKET L I M I T E D S U P P LY A N D H I G H D E M A N D Source: World Nuclear Association, The Nuclear Fuel Report: Global Scenarios for Demand and Supply Availability 2019-2040 15

  16. Slide 16: Häggån Vanadium Project

    HÄGGÅN VANDIUM PROJECT H I G H G R A D E VA N A D I U M • 100% owned 15.2 Billion lb Vanadium Resource (330 Mt 100% owned 15.1 Indicated + 14,880 Mt Inferred)1 Billion lb Vanadium • 1.1 Billion lb High-Grade Zone Resource (Inferred) • 124 million tonnes @ 0.43% V2O5 (1.1 Billion lbs V2O5) • Shallow

  17. Slide 17: Gold and Base Metals in Mauritania

    GOLD AND BASE METALS IN MAURITIANA • Exceptional gold and base metal properties secured early 2017 • 105 km of virgin Greenstone belt with little exploration • Further field work to commence immediately, with three high priority greenstones zones to be surveyed, for a total of 6221 stations to be su

  18. Slide 18: Summary Highlights

    SUMMARY HIGHLIGHTS • The Tiris Emission Free Uranium Project is ‘’one of the worlds most compelling uranium development projects’ due to its: • Low capex • Low opex • Fast timeline to development • Tiris Uranium - Definitive Feasibility Study completed • Tasiast South Gold Project exceptional with s

  19. Slide 19: Contact

    CONTACT Peter Reeve Managing Director preeve@auraee.com +61 417 377 114 Jane Morgan Investor & Media Relations jm@janemorganmanagement.com.au +61 405 555 618 19 This ASX Release authorised by the Managing Director Aura Energy Limited Level 3, 62 Lygon Street Carlton South 3053

  20. Slide 20: JORC Resource - Tiris Zero Emission Uranium Project

    APPENDIX JORC RESOURCE -TIRIS ZERO EMISSION URANIUM PROJECT Cut-off Grade U3O8 ppm Class Tonnes/Mt U3O8 ppm U3O8 (MLBS) Measured 10.2 240 5.3 100 Indicated 24.5 220 11.7 Inferred 23.6 230 11.9 Total 58.3 230 29 Measured 4.5 350 3.5 200 Indicated 9.5 340 7.0 Inferred 8.6 390 7.3 Total 22.6 360 17.9 M

  21. Slide 21: Häggån Project - Global Inferred Resources

    APPENDIX HÄGGÅN PROJECT - GLOBAL INFERRED RESOURCES • Global Inferred Resource of 15.2 billion lbs V2O5 at 0.27% (0.1% cut-off) • At 0.4% cut-off, Inferred Resource is 90 million tonnes at 0.42% V2O5 • Includes contiguous high-grade zone of 49 million tonnes at +0.4% V2O5 between 20 and 100 metres d

Aura Energy — Investor Presentation (June 2021) on 6ix