DuPont de Nemours, Inc. · NYSE:DD
DuPont de Nemours — DuPont — Technical Presentation (2016)
29 slides from DuPont de Nemours's technical presentation, 2016
Slide 1: High-Temperature Transformers Are Key to Grid Resilience
Slide 2: Agenda
Overview of U.S. electrical power grid New regulations Role of high-temperature transformers in grid resiliency Agenda High-temperature transformer applications Fast-deployable transformers for grid resiliency Rapid recovery transformer initiative Conclusions 2
Slide 3: U.S. Electrical Power Grid
“National power grid” is really 3 interconnected regional grids - More than 7,600 power stations - 80,000 miles of EHV transmission lines - 90% of electricity passing through EHV transformers U.S. Electrical Power Grid Operated by Equipment of Needs expansion 3,000 utilities widely differing and upg
Slide 4: Aging Infrastructure of U.S. Electrical Power Grid
Aging ~51% 60% 70% Infrastructure of U.S. Electrical Power Grid of U.S. generating capacity in of circuit breakers are of transmission lines plants at least 36 years old 30+ years old and power transformers are 25+ years old 4
Slide 5: Power Outages On the Rise
Power Outages 3 of the 5 massive U.S. blackouts occurred since 2004* On the Rise Power outages are up 67% from 2011 to 2014 On average, ~500,000 people are affected daily by power outages* 58% of U.S. power outages due to: - Severe weather** - Thunderstorms - Hurricanes - Blizzards 5 *Lexington Inst
Slide 6: Power Outages On the Rise (continued)
Power Outages Other causes of power outages: On the Rise - Equipment malfunctions, circuit overloads and load shedding** (continued) - 20% of sustained outages (lasting >1 minute) caused by failing electrical equipment - Headline Quote: “Delta system failure marks wake-up call for airline industry”
Slide 7: Power Transformer—A Critical Component
Critical to the reliable operation of the electrical power grid Failure of a single unit can cause: - Temporary service interruption - Lead to collateral damage Custom-designed equipment Power - Costs millions of dollars Transformer— - Not interchangeable A Critical Weigh hundreds of tons— Component
Slide 8: Homeland Security Identifies Vulnerability
Average age of substation transformers is beyond designed life Vandalism/terrorist activity Homeland Security Extreme weather/global warming Identifies - Heavy rains/rising ocean → flooding Vulnerability - Heat waves/forest fires - Higher ambient temperatures - Hurricanes/tornadoes/severe storms - G
Slide 9: Presidential Policy Directive-21
CRITICAL INFRASTRUCTURE SECURITY AND RESILIENCE Issued February 12, 2013 Presidential Policy Identifies 16 critical infrastructure sectors Directive-21 Defines resilience as: “the ability to prepare for and adapt to changing conditions and withstand and recover rapidly from disruptions. Resilience i
Slide 10: FERC Ordered Development of Physical Security Standards
FERC Ordered Development In 2014, Federal Energy Regulatory Commission (FERC) took action of Physical to enhance grid resilience Security FERC directed North American Electric Reliability Corporation (NERC) to: Standards - Develop reliability standards - Require owners/operators of bulk-power system
Slide 11: High-Temperature Transformers Play Key Role in Grid Resiliency
High-temperature liquid-immersed transformers offer possibility of: High-Temperature - Increased capacities for replacement units - Same size Transformers - Matching terminations Play Key Role in - Unprecedented mobility - Even very large capacity Grid Resiliency - Emergency replacement - True step-
Slide 12: High-Temperature Liquid-Immersed Transformers
DuPont™ Nomex® insulation celebrates 50 years in 2017 Long history of proven performance—40+ years High-Temperature Recent global standards (IEEE Liquid-Immersed and IEC) help guide development Transformers Insulation offering expanding— widest selection in years Use of high-temperature insulation e
Slide 13: High-Temperature Transformer Applications
High-Temperature Transformer Applications Photo by Tamini Transformatori Srl Photo by ABB Photo by CG Power Systems, Belgium Photo by ABB 13
Slide 14: Typical Mobile Substations
For temporary or emergency use Less than 100 MVA Full hybrid insulation system Typical Mobile - 65/95° C top oil/average winding rise - High-temperature wire insulation, Substations spacers and strips Photo credit: Delta Star, Inc - Highest capacity for road weight limit Mixed hybrid insulation syst
Slide 15: Substation Transformer in Seoul, South Korea
SITUATION Bridge collapse forces switch from three 1-phase units due to reduced weight limits on city bridges CHALLENGES INCLUDED - Weight limits Substation - Need for increased capacity Transformer SOLUTION in Seoul, - 60 MVA, 138 kV liquid-immersed transformer South Korea - DuPont™ Nomex® hybrid i
Slide 16: Comparison of Three 1-Phase Units vs Single 3-Phase Unit
Conventional 3x1 PH 20 MVA Light Weight 3PH 60 MVA Comparison of Transformer 22.35 Ton per 20 MVA TR 28.8 Ton Three 1-Phase Tractor 8.5 Ton 6.76 Ton Units vs Single Trailer 6.3 Ton 4.37 Ton 3-Phase Unit Total Weight 37.15 Ton per 20 MVA TR 39.93 Ton Length 5,050 mm 4,060 mm Width 2,610 mm 2,500 mm H
Slide 17: Compact Transformer for Urban Substation in Grenoble, France
SITUATION Aging 10 MVA transformer in densely populated city center needed to be replaced Compact Transformer for CHALLENGES INCLUDED - Need for significantly increased capacity Urban Substation - Compact size to fit in existing substation Photo by CG Power Systems, Belgium in Grenoble, - Very low n
Slide 18: Interconnecting Transformer
Photo by ABB Photo by ABB ESCELSA: 3-Phase ABB Hybrid Power Transformer Rated Power (Emergency) MVA 300 (380) Interconnecting Rated Voltages (BIL) kV 230/138-138/13.8 Transformer HV BIL kV 1,050 Top Oil Temp Rise K 65 Avg Wdg Temp Rise K 65 (95) Total Mass Tons 330 - Overloadable grid transformer -
Slide 19: Building on the Past to Address Grid Resiliency
Long history of proven successes for substations and mobile substations - Natural to use high-temperature transformers - As response to challenge of grid resiliency Building on the High-temperature insulation Past to Address - Expanding selection Grid Resiliency - Helping enable innovative transform
Slide 20: First 250 MVA, 400 kV Fast-Deployable Transformer
SITUATION Power utility in Spain needed to new design concept - Fast-deployable emergency replacement units - Needed larger capacity - Replace existing 117 MVA First 250 CHALLENGES INCLUDED - Compact size MVA, 400 kV - Reduced weight Fast-Deployable - Easier shipping by standard truck Transformer -
Slide 21: Fast-Deployable Network Transformer in Spain
Fast-Deployable Network Transformer in Spain Photo by ABB 21
Slide 22: Fast-Deployable Transformer—Size Reduction Example
Standard Conventional Hybrid Insulation Substation Fast-Deployable Fast-Deployable Transformer Transformer Transformer Rated Power (p.u.) 1 0.6 1.25 Load Losses (p.u.) 1 0.87 1.74 Fast-Deployable No Load Losses 1 0.60 0.77 Transformer— @100% Exc. (p.u.) Size Reduction Shipping Weight (p.u.) 1 0.53 0
Slide 23: Rapid Recovery Transformer Initiative
Consortium formed over past decade U.S. Department of Homeland Security (DHS) Science & Technology Directorate (S&T) Electric Power Research Institute (EPRI) Rapid Recovery CenterPoint Energy, an energy delivery company headquartered in Houston, Texas Transformer ABB, a global leader in power and au
Slide 24: Rapid Recovery Transformer—RecX Prototype
Designed to replace the most common EHV transformers used by utilities SOLUTION - Three 1-phase transformers - DuPont™ Nomex® hybrid insulation system chosen to reduce both size and weight Rapid Recovery - 345 kV at 200 MVA each Transformer— - Weighs 63 tons (vs. 100 to 400 tons for current power tr
Slide 25: Rapid Recovery Transformer—RecX
Rapid Recovery Transformer— Photo by ABB RecX Photo by DHS S&T Photo by ABB 25
Slide 26: Siemens Grid Resiliency Solutions
Siemens Transformers globally launched its resiliency concept “Pretact™” at the 2016 Hannover Fair Siemens Grid First order is for six ultra-flexible siemens.com/transformers Resiliency units for a major utility in the U.S. Solutions - 335/136 kV at 100 MVA each - DuPont™ Nomex® hybrid insulation sy
Slide 27: Conclusions
Driving need for development of contingency plans - Aging infrastructure → more frequent/more severe outages - Increasing consumption - New regulations High-temperature, liquid-immersed transformers will play a key role in grid resiliency plans for many utilities - Increased reliability - Higher cap
Slide 28: Learn More About Nomex in High-Temperature Applications
Learn More About Read the following case studies at nomexpaper.dupont.com Nomex® in - Compact Transformer for Urban Substation in Grenoble High-Temperature - ABB’s First 250 MVA, 400 kV Fast-Deployable Transformer Applications - Rapid Recovery Transformer—RecX 28
Slide 29: nomexpaper.dupont.com
nomexpaper.dupont.com Contact Rick Marek: nomexpaper.dupont.com/contact This information corresponds to our current knowledge on the subject and may be subject to revision as new knowledge becomes available. It is your responsibility to investigate other sources of information on this issue that mor