Slide 1: Corporate Presentation – December 2020
Corporate Presentation – December 2020
Slide 2: Disclaimer
Disclaimer Statements contained in this presentation which are not historical facts are measured mineral resources, indicated mineral resources and inferred forward-looking statements that involve risks, uncertainties and other factors mineral resources, while recognized and required by Canadian reg
Slide 3: Licensed Low-Cost U.S. ISR Projects
Licensed Low-Cost U.S. ISR Projects Operational Infrastructure – Ready to Ramp Up U.S. Production Profile 4M lbs./yr Aggressively Expanded Project Portfolio Through Acquisitions During the Downturn Largest U.S. Resource Base of Fully Permitted ISR Projects in Texas and Wyoming of any U.S. Based Prod
Slide 4: Reactor Demand Significantly Exceeds Primary Production
Reactor Demand Significantly Exceeds Primary Production Spot Prices Below Production Costs and Hedges Falling Off 2020 Demand expected = 182M lbs. 2020 Production expected = 122M lbs. 2020 Production Gap is 60M lbs. below requirements Cumulative Gap is 317M lbs. by 2026 Source: UxC Market Outlook Q4
Slide 5: Uranium Spot Price Up 13% Year-to-Date
Uranium Spot Price $29.50/lb. Up 13% Year-to-Date 66% Increase Over November 2016 Low ($17.75/lb) Spot Daily Long Term $160 $140 $138.00 2005: Major Mine $120 Disruptions (Cigar Lake, $70.00 McArthur River) US $/lb U308 $100 2011: Fukushima event $80 $60 $37.00 $29.50 $40 Financial Crisis $20 Nov 20
Slide 6: U.S. Uranium Mining & Nuclear Energy Enjoying Historic Support in Washington D.C.
U.S. Uranium Mining & Nuclear Energy Enjoying Historic Support in Washington D.C. Bi-Partisan Support for Nuclear Energy – First Time in 48 years Democratic Party Platform Supports Nuclear Energy World’s Largest Nuclear Reactor Fleet Over Reliance on Imports Prompts National Security Concerns – No U
Slide 7: Diversified Asset Portfolio Low-Cost ISR & Production Ready
Diversified Asset Portfolio Low-Cost ISR & Production Ready Canada - Athabasca Basin Resources (M lbs.) Project Name Stage 58 M lbs. Measured & Indicated Diabase (E) M&I NA Inferred NA 45 M lbs. Inferred U3O8 Paraguay ISR Uranium Portfolio Resources (M lbs.) Project Name Stage M&I Inferred Yuty (D)
Slide 8: U.S. Project Portfolio Infrastructure, Resources and Permits
U.S. Project Portfolio Infrastructure, Resources and Permits Uranium Stage: Hobson Processing Plant (E) Exploration Production Capacity of 2 M lbs./year Texas Hub & Spoke ISR Portfolio Vanadium (D) In Development (NT) Near Term Production WY CO AZ NM TX U.S. Conventional Portfolio Wyoming Reno Creek
Slide 9: Our Team
Our Team Amir Adnani Spencer Abraham Scott Melbye President, CEO, Director Chairman, Board of Directors Executive Vice President An entrepreneur, founding CEO of UEC, Served as a U.S. Senator from 1995 to 2001, as 35 years of experience in senior roles with founder and Chairman of GoldMining Inc., S
Slide 10: UEC At a Glance
UEC At a Glance Member of the Russell 3000® Index $5.1 M Cash(1) $15 M Public Offering Financing Closed on Sep 24, 2020(2) Securities(3) $12.1 M market value of 14 M shares of Uranium Royalty Corp (URC: TSX-V) 197.4 M 14.5 M 16.5 M 228.5 M Share Structure Outstanding Warrants + Options(4) Fully Dilu
Slide 11: Hub & Spoke Production Strategy
Hub & Spoke Production Strategy South Texas 11
Slide 12: Hobson is fully licensed and permitted
Hobson is fully licensed and permitted. The Processing Plant has a 2M lbs. / year physical capacity 12
Slide 13: Palangana ISR Mine First Producing Mine Proof of Concept
Palangana ISR Mine First Producing Mine Proof of Concept $10M 6 months construction Initial CAPEX timeline • Low cash-cost of $21.77/lb during operation Production • Fully permitted including Ready expanded mine permit • Received 10-year renewal permits in 2019 Similar Costs • The major permits for
Slide 14: Palangana Production Area (PA-1)
Palangana Production Area 1 (PA-1) In-Situ Recovery (ISR) Technology Low Cost & Environmentally Friendly Palangana Ion Exchange Facility 14
Slide 15: Resin Hauling Truck And Trailer
Resin Hauling Truck And Trailer 15
Slide 16: Burke Hollow ISR Project Growth Ahead
Burke Hollow ISR Project Growth Ahead ▪ Discovery of six trends since 2012 ▪ 7.09M lbs. in 4.06Mt grading 0.088% U3O8 ▪ Leach amenability testing indicates recovery greater than 90% ▪ ~20,000 acres located ~50 miles from Hobson Processing Plant. ▪ 50% of the property unexplored South Texas *See news
Slide 17: Burke Hollow Advancing Towards Uranium Extraction
Burke Hollow 2019 Drilling Discovers Advancing Towards Additional Mineralization in Production Area 1 Uranium Extraction ✓ 72 monitor wells installed The following final permits have been issued: ✓ Enlarged the Production Area 1 ✓ Mine Production Area (PA-1) zone ✓ Two Class I disposal wells ✓ Aquif
Slide 18: Reno Creek ISR Project
Reno Creek ISR Project The largest permitted, pre-construction ISR uranium project in the U.S. Strategic Location within the Heart of the Powder River Basin, Wyoming Received a modified Permit to Construct in 2019, allowing the construction of the Central Processing Plant (CPP) and ISR wellfields 18
Slide 19: Reno Creek ISR Project Pre-Feasibility Study Underway
M & I Resource 26M lbs. Reno Creek ISR Project of U3O8 grading 0.041% within 32Mt* Pre-Feasibility Study Inferred Resource 1.49M lbs. Underway of U3O8 grading 0.039% within 1.92Mt* First time since 1980 that the major mineralized trends have been consolidated Considerable ISR exploration and expansi
Slide 20: Reno Creek: Project Timeline
Reno Creek: Project Timeline Aug 2017: Sept. 2016: UEC Closes July 2013: Updated June 2012: Acquisition May 2018: Repurchase of resource Exploration of the Fully UEC 5% Gross July 2015: to current June 2011: success Licensed Completes the Production Permit to 22M lbs. 350-hole resource discovers new
Slide 21: Anderson Project - Arizona
Anderson Project - Arizona NI 43-101 compliant resource*: A Large U.S. ▪ Indicated Resource: 29.5Mt, 17M lbs. avg. grade of 0.029% Resource ▪ Inferred Resource: 14.3Mt, 12M lbs. with avg. grade of 0.046% 9,852 Acres Project located ~75 miles northwest of Phoenix, AZ Between 1955-1958 with ~$40M spen
Slide 22: Slick Rock Project - Colorado
Slick Rock Project - Colorado NI 43-101 Compliant Resource*: Technical ▪ Inferred Resource: 2.5Mt, 11.6M lbs. avg. grade of 0.228% Report ▪ Inferred Resource: 2.5Mt, 69.6M lbs. vanadium with avg. grade of 1.37% Low ▪ $21M initial CAPEX with an annual production CAPEX of 438,000 pounds U3O8 + vanadiu
Slide 23: ISR District Opportunity in Paraguay
ISR District Opportunity in Paraguay Similar geology as South Texas and leveraging ~$50M of historic exploration work by Anschutz and Cameco, including new work completed by UEC. Project Historic Operator Stage Resource (M lbs) Yuty Cue Resources / Exploration / 8.9M lbs. in 7.8Mt grading 0.052% Cam
Slide 24: Alto Paraná Titanium Project
Alto Paraná Titanium Project Project Overview ▪ One of the highest-grade and largest-known Cut-Off % % % Ilmenite Tonnes Thickness Ferro-Titanium deposits in the world % TiO2 Fe2O3 calc Billions (m) ▪ NI 43-101 compliant resource with a mineral 6.0 7.41 23.58 13.95 4.94 6.61 exploration claim of 70,
Slide 25: Titanium Feedstock Market
Titanium Feedstock Market – TiO2 prices hitting 3-year highs Price of TiO2 Feedstock - ilmenite (USD per tonne) $200 ▪ 90% of TiO2 feedstocks (ilmenite) used UEC signed $175 for pigment manufacturing option to acquire ▪ Strong price recovery for ilmenite since $150 Alto Paraná 2017, with positive ou
Slide 26: Investment Summary
Investment Summary ▪ Fully permitted and state of the art infrastructure advantage with Hobson Processing Plant ▪ Pipeline of fully licensed, low-cost ISR projects – potential production profile of 4M lbs./year in Texas and Wyoming ▪ U.S. projects can provide supply under the NFWG strategy, includin
Slide 27: Nuclear Energy Saves Lives – Improves Quality of Life
Nuclear Energy Saves Lives – Improves Quality of Life Nuclear is the safest way to make reliable electricity and has saved over 3 million lives that would have been lost prematurely to deadly air pollution from energy alternatives. https://www.nextbigfuture.com/2019/01/nuclear-power-has-saved-3-4-mi
Slide 28: Germany’s “Energiewende” “Failed Energy Policy”
Germany’s “Energiewende” France Gets 72% of its “Failed Energy Policy” Electricity from Nuclear Power THEY ENJOY: 160 Billion Euro Investment in “Green Energy” has resulted in: ✓ Per kW carbon emissions 1/10 that of Germany ✓ Electricity rates 1/2 that of Germany ▪ Zero Progress in Reducing Carbon E
Slide 29: Nuclear Power Growth Remains Robust
Nuclear Power Growth Remains Robust 29 442 Operable Reactors Worldwide 53 Units Under Construction 52 New Reactors Connected since 2012 2.6% CAGR Nuclear Growth Expected (2020-2027)1 ▪ China announced that it is likely to triple nuclear power capacity by 2030 ▪ India plans for 21 new nuclear reactor
Slide 30: Small Modular Reactor (SMR)
Small Modular Reactor (SMR) An Important Emerging Market ▪ SMR global market: 65-85 GWe by 2035 – small scalable reactors: ▪ Size: 5 up to 300 MWe ▪ Simpler design - lower capital and operating cost ▪ Cost competitive with natural gas ▪ Western U.S. utilities planning for 12 of the NuScale Power SMR
Slide 31: Need for New Production – Beyond Existing Mines
Need for New Production – Beyond Existing Mines Trade Tech’s “Market Appetite” for New Production Inventory Overhang Appetite for New Production Secondary Supply Established Production Base (Weighted) Reactor Requirements Drawing Down Uranium Price Too Low to Stimulate New Production Within the Perm
Slide 32: Utility Procurement Cycle: Old Contracts Rolling Off
Utility Procurement Cycle: Old Contracts Rolling Off…New Contracts Need to be Signed Utility Uncommitted Demand Historic Long Term Contracting Source: UxC Market Outlook Q3 2020 32
Slide 33: Global Cost Curve – Most U.S. Production is ISR
Global Cost Curve – Most U.S. Production is ISR Source: TradeTech 33
Slide 34: Overdependence on Foreign Supplies
Overdependence on Foreign Supplies “ The Department of Energy is working to end U.S. reliance on Russia for nuclear fuel, plans to begin processing U.S. uranium as early as next year ” Secretary Dan Brouillette U.S. Uranium Imports vs. Production: 1970-2019 Imports as % Million lbs U308 of Productio
Slide 35: Bottom Line - Positive Market Outlook
Bottom Line - Positive Market Outlook ✓ Demand Growth – 52 reactors added to grid in past 8 years - generation has recovered to pre-Fukushima levels. Global Nuclear Power Growth is expected at a CAGR of 2.6% over the period 2020-2027. IEA sees future installed nuclear capacity growth of over 15% to
Slide 36: Combined Resource Summary
Combined Resource Summary(1) Projects Measured & Indicated Inferred Hub & Spoke ISR Portfolio Tons Grade Lbs U3O8 Tons Grade Lbs U3O8 Texas ISR (‘000) (% U3O8) (‘000) (‘000) (% U3O8) (‘000) Palangana 393 0.14 1,057 328 0.18 1,154 Burke Hollow - - - 4,064 0.088 7,093 Goliad 3,790 0.05 5,475 1,547 0.0
Slide 37: URANIUM ENERGY CORP UEC: NYSE American