Slide 1: Sorby Hills Lead-Silver-Zinc Project Pre-Feasibility Study Outcomes
Sorby Hills Lead-Silver-Zinc Project Pre-Feasibility Study Outcomes 25 August 2020 PACIFICO MINERALS LIMITED ASX:PMY

Slide 2: Disclaimer
DISCLAIMER Forward-Looking Statements Certain statements in the presentation are or may be “forward-looking statements” and represent the Company’s intentions, projections, expectations or beliefs concerning, among other things, future operating and exploration results or the Company’s future perfor

Slide 3: Cautionary Statement
CAUTIONARY STATEMENT The PFS discussed herein has been undertaken to explore the technical and economic feasibility of developing an open pit mine and adjacent processing facility to economically and sustainably exploit the Sorby Hills Lead-Silver-Zinc Mineral Resource located in the Kimberley Regio

Slide 4: Corporate Snapshot
CORPORATE SNAPSHOT (21 AUGUST 2020) SHARE PRICE Company Highlights 12-Month Share Price Performance A$ 0.024 ISSUED SHARES ✓ ASX-listed base metal explorer and developer. 2,890 M ✓ Experienced Board and Management with a proven track record in exploration and development. MARKET CAP ^ ✓ Based and fo

Slide 5: Sorby Hills Pre-Feasibility Study (August 2020)
Sorby Hills Pre-Feasibility Study (August 2020) PACIFICO MINERALS LIMITED ASX:PMY 5

Slide 6: PFS Highlights Impressive Project Economics
PFS HIGHLIGHTS IMPRESSIVE PROJECT ECONOMICS The Pre-Feasibility Study highlights the low-risk nature of the Sorby Hills Project with a well-defined large scale Mineral Resource, simple crush-mill-float processing circuit, high metal recoveries and key approvals received. Initial 10 50kt lead 1.5moz

Slide 7: Project Overview
PROJECT OVERVIEW ▪ The Sorby Hills Project is the largest undeveloped, near-surface Lead-Silver-Zinc deposit in Australia. ▪ The Project is a JV between Pacifico and Yuguang (Australia) Pty Ltd, a wholly owned subsidiary of China’s largest Lead smelting and Silver producer, Henan Yuguang Gold and Le

Slide 8: Project Overview
PROJECT OVERVIEW ▪ The JV Project comprises five granted mining leases covering six known Lead-Silver- Zinc deposits. ▪ The PFS Base Case incorporates the mining of 14.8Mt of ore over an initial 10-year life from four deposits, namely Omega, A, B and southern portion of Norton. ▪ Mined ore will be t

Slide 9: Capital and Operating Costs
CAPITAL AND OPERATING COSTS Capital Cost Estimate Operating Cost Estimate1 Capital Item A$M Cost Centre A$M A$/t ore A$/lb2 US$/lb2 Pre Production Mining 24.3 Mining 347 23.48 0.33 0.23 Process Plant incl. EPC fee 105.4 Processing 292 19.80 0.28 0.20 Infrastructure 20.5 G&A 107 7.28 0.10 0.07 Owners

Slide 10: Life of Mine Metrics
LIFE OF MINE METRICS Item Unit Base Case Item Unit Base Case Economic Assumptions Cash Flow Lead Price US$/t 2,095 Lead Revenue A$M 1,422.3 Silver Price US$/oz 21.10 Silver Revenue A$M 431.1 Exchange Rate A$:US$ 0.70 Gross Revenue A$M 1,853.3 Physicals Royalties A$M (69.5) Life of Mine (LOM) Years 9

Slide 11: Potential Upside via DMS Processing Option
POTENTIAL UPSIDE VIA DMS PROCESSING OPTION ▪ Two processing options were considered during the PFS: LOM Production Metrics for the Whole Ore and DMS Options ▪ Whole Ore (WO) Option: Where all the Run of Mine feed Parameter DMS Option WO Option reports directly from the primary crusher to the milling

Slide 12: Reserves & Resources
Reserves & Resources PACIFICO MINERALS LIMITED ASX:PMY 12

Slide 13: Mineral Resource Estimate
MINERAL RESOURCE ESTIMATE Resource Growth Since Oct. 2018 Acquisition2 • Global Resource of 44.1 Mt @ 3.3% Pb, 38g/t Ag and 0.5% Zn from 20 m 2,000 below surface and open along strike and down dip1. 1,500 • Resource size and confidence level substantially increasing with each Pb Eq. (kt) drilling pr

Slide 14: PFS Mine Plan
PFS MINE PLAN ▪ Open pit mining across four shallow deposits Base Case Mine Plan – By Resource Category with mineralisation from 20m. Tonnes ('000 t) Lead (%) 700 7.0% ▪ Flat topography and easy free dig in first 18m. 600 6.0% 500 5.0% ▪ Life of Mine Strip Ratio of 8.0x (volumetic basis). 400 4.0% ▪

Slide 15: Recent Drilling Success
RECENT DRILLING SUCCESS Pacifico’s drilling has materially increased confidence in ore body geometry, grade, and continuity, resulting in the Omega and Norton deposits with a combined strike length of over 4 km. Noteworthy Expansion and Infill Drilling Intercepts • 22.0m at 8.8% Pb, 52g/t Ag, 0.3% Z

Slide 16: Exploration Upside
EXPLORATION UPSIDE Exploration Upside • Gravity provides the best vectors and has identified several high priority targets for extensions of mineralisation. Mineralisation correlates with the transition from linear gravity lows to gravity highs. • Pacifico holds a 100% interest in a large exploratio

Slide 17: The Lead and Silver Markets
The Lead and Silver markets PACIFICO MINERALS LIMITED ASX:PMY 17

Slide 18: The Role of Lead in the Clean Energy Economy
THE ROLE OF LEAD IN THE CLEAN ENERGY ECONOMY Lead ▪ Lead batteries provide 75% of worldwide rechargeable energy storage1 ▪ Predicted growth in global lead market demand - CAGR of 6.74% between 2018 and 20222. ▪ Lead batteries are a key element in the transition to a low carbon economy, with unrivall

Slide 19: The Role of Silver in the Clean Energy Economy
THE ROLE OF SILVER IN THE CLEAN ENERGY ECONOMY Silver ▪ Silver’s industrial applications, particularly in emerging green industries, provides a supply-demand overlay to the traditional storage of wealth thematic. ▪ Silver is the best-known conductor of electricity and is used in rapidly growing sect

Slide 20: Project Development Timeline Providing Significant Newsflow
PROJECT DEVELOPMENT TIMELINE PROVIDING SIGNIFICANT NEWSFLOW On track to become a significant lead-silver producer in Western Australia. CY2020 CY2021 Q3 Q4 Q1 Q2 Q3 Q4 PFS Completed Ore Reserve Estimate DFS and Expansion Drilling Definitive Feasibility Study Permitting and Approvals Financing and Of

Slide 21: Thank You
Simon Noon – Managing Director info@pacificominerals.com.au THANK YOU www.pacificominerals.com.au PACIFICO MINERALS LIMITED ASX:PMY 21

Slide 22: Appendix
APPENDIX PACIFICO MINERALS LIMITED ASX:PMY 22

Slide 23: PFS Highlights
PFS HIGHLIGHTS Open-pit project located in a Tier-1 mining jurisdiction with a well-defined large scale Mineral Resource, a Mine Plan underpinned by LOW RISK PROJECT 92% Ore Reserves, a simple crush-mill-float processing circuit, high metal recoveries, key approvals received, pre Native Title teneme

Slide 24: Metallurgy & Processing
METALLURGY & PROCESSING ▪ PFS metallurgical and engineering studies have confirmed high mineral recoveries via a simple, conventional processing route to produce a high- quality concentrate. ▪ PFS test work confirmed average metal recoveries of 93.3% Pb and 80.3% Ag, for production of an average 62%

Slide 25: Project Layout
PROJECT LAYOUT Image: Sorby Hill Site Layout Image: 3D view of the Sorby Hills processing facilities PACIFICO MINERALS LIMITED ASX:PMY 25

Slide 26: Project Physicals
PROJECT PHYSICALS Item Unit Y-2 Y-1 Y1 Y2 Y3 Y4 Y5 Y6 Y7 Y8 Y9 Y10 TOTAL Waste Mined Mt - 5.7 9.3 8.4 16.9 19.2 12.3 8.5 9.5 9.5 7.6 - 106.9 Ore Mined Mt - 1.3 1.1 2.0 0.5 1.7 1.7 1.9 0.9 1.0 2.6 - 14.8 Measured % - 83% 67% 54% 48% 26% 71% 69% 47% - 8% - 46% Indicated % - 17% 33% 45% 50% 62% 28% 30%

Slide 27: Project Cash Flows
PROJECT CASH FLOWS Item Real Y-2 Y-1 Y1 Y2 Y3 Y4 Y5 Y6 Y7 Y8 Y9 Y10 TOTAL Lead Price US$/t 2,095 2,095 2,095 2,095 2,095 2,095 2,095 2,095 2,095 2,095 2,095 2,095 Silver Price US$/oz 21.1 21.1 21.1 21.1 21.1 21.1 21.1 21.1 21.1 21.1 21.1 21.1 Exchange Rate A$:US$ 0.7 0.7 0.7 0.7 0.7 0.7 0.7 0.7 0.7

Slide 28: Sensitivities
SENSITIVITIES NPV8 A$M 0 100 200 300 400 500 600 FX (+-20%) 135 556 Pb Price (+-20%) 127 479 Ag Price (+-20%) 248 359 Variable Opex (+-20%) 207 399 Capex (+-20%) 264 342 Fuel (+-20%) 289 319 Pb Flotation Recovery 296 316 (+-1% fresh, +-2% oxide) Ag Flotation Recovery 292 315 (+-4% fresh, +-1% oxide)

Slide 29: Equivalent Calculation
EQUIVALENT CALCULATION The contained metal equivalence formula is based on the Sorby Hills PFS including: • Lead Price US$2,095/t; • Silver Price US$21.1/oz; • Silver recovery of 80.3% (weighted average of oxide and fresh Ag recoveries); and • Silver Payability rate of 95%. It is Pacifico’s opinion

Slide 30: Study Contributors
STUDY CONTRIBUTORS Activity Consultant Resource assessment CSA Global Mining studies Entech Metallurgical Testwork DRA Pacific Process Plant and Infrastructure DRA Pacific Tailings storage Coffey Services Australia Dewatering and Water Supply Pennington Scott Product Logistics Minerals to Market Env

Slide 31: Board and Management
BOARD AND MANAGEMENT Experienced Board and Management with a proven track record in exploration and development. Gary Comb Simon Noon Richard Monti Andrew Parker Chairman Managing Director and CEO Non-Exec. Director Non-Exec. Director Engineer with over 30 years’ Experienced executive with a strong
Source: Internet Archive copy of boabmetals.com
More decks from Boab Metals Ltd
Shareholder Meeting (November 2026)11 slides · November 2026
Investor Presentation (September 2026)31 slides · Sep 29, 2026
Investor Presentation (September 2026)28 slides · Sep 8, 2026
Investor Presentation (July 2026)24 slides · Jul 16, 2026
Investor Presentation (February 2026)32 slides · Feb 27, 2026
Investor Presentation (February 2026)32 slides · February 2026