  1. Slide 1: Sorby Hills Lead-Silver-Zinc Project Pre-Feasibility Study Outcomes

    Slide 1: Sorby Hills Lead-Silver-Zinc Project Pre-Feasibility Study Outcomes

    Sorby Hills Lead-Silver-Zinc Project Pre-Feasibility Study Outcomes 25 August 2020 PACIFICO MINERALS LIMITED ASX:PMY

  2. Slide 2: Disclaimer

    Slide 2: Disclaimer

    DISCLAIMER Forward-Looking Statements Certain statements in the presentation are or may be “forward-looking statements” and represent the Company’s intentions, projections, expectations or beliefs concerning, among other things, future operating and exploration results or the Company’s future perfor

  3. Slide 3: Cautionary Statement

    Slide 3: Cautionary Statement

    CAUTIONARY STATEMENT The PFS discussed herein has been undertaken to explore the technical and economic feasibility of developing an open pit mine and adjacent processing facility to economically and sustainably exploit the Sorby Hills Lead-Silver-Zinc Mineral Resource located in the Kimberley Regio

  4. Slide 4: Corporate Snapshot

    Slide 4: Corporate Snapshot

    CORPORATE SNAPSHOT (21 AUGUST 2020) SHARE PRICE Company Highlights 12-Month Share Price Performance A$ 0.024 ISSUED SHARES ✓ ASX-listed base metal explorer and developer. 2,890 M ✓ Experienced Board and Management with a proven track record in exploration and development. MARKET CAP ^ ✓ Based and fo

  5. Slide 5: Sorby Hills Pre-Feasibility Study (August 2020)

    Slide 5: Sorby Hills Pre-Feasibility Study (August 2020)

    Sorby Hills Pre-Feasibility Study (August 2020) PACIFICO MINERALS LIMITED ASX:PMY 5

  6. Slide 6: PFS Highlights Impressive Project Economics

    Slide 6: PFS Highlights Impressive Project Economics

    PFS HIGHLIGHTS IMPRESSIVE PROJECT ECONOMICS The Pre-Feasibility Study highlights the low-risk nature of the Sorby Hills Project with a well-defined large scale Mineral Resource, simple crush-mill-float processing circuit, high metal recoveries and key approvals received. Initial 10 50kt lead 1.5moz

  7. Slide 7: Project Overview

    Slide 7: Project Overview

    PROJECT OVERVIEW ▪ The Sorby Hills Project is the largest undeveloped, near-surface Lead-Silver-Zinc deposit in Australia. ▪ The Project is a JV between Pacifico and Yuguang (Australia) Pty Ltd, a wholly owned subsidiary of China’s largest Lead smelting and Silver producer, Henan Yuguang Gold and Le

  8. Slide 8: Project Overview

    Slide 8: Project Overview

    PROJECT OVERVIEW ▪ The JV Project comprises five granted mining leases covering six known Lead-Silver- Zinc deposits. ▪ The PFS Base Case incorporates the mining of 14.8Mt of ore over an initial 10-year life from four deposits, namely Omega, A, B and southern portion of Norton. ▪ Mined ore will be t

  9. Slide 9: Capital and Operating Costs

    Slide 9: Capital and Operating Costs

    CAPITAL AND OPERATING COSTS Capital Cost Estimate Operating Cost Estimate1 Capital Item A$M Cost Centre A$M A$/t ore A$/lb2 US$/lb2 Pre Production Mining 24.3 Mining 347 23.48 0.33 0.23 Process Plant incl. EPC fee 105.4 Processing 292 19.80 0.28 0.20 Infrastructure 20.5 G&A 107 7.28 0.10 0.07 Owners

  10. Slide 10: Life of Mine Metrics

    Slide 10: Life of Mine Metrics

    LIFE OF MINE METRICS Item Unit Base Case Item Unit Base Case Economic Assumptions Cash Flow Lead Price US$/t 2,095 Lead Revenue A$M 1,422.3 Silver Price US$/oz 21.10 Silver Revenue A$M 431.1 Exchange Rate A$:US$ 0.70 Gross Revenue A$M 1,853.3 Physicals Royalties A$M (69.5) Life of Mine (LOM) Years 9

  11. Slide 11: Potential Upside via DMS Processing Option

    Slide 11: Potential Upside via DMS Processing Option

    POTENTIAL UPSIDE VIA DMS PROCESSING OPTION ▪ Two processing options were considered during the PFS: LOM Production Metrics for the Whole Ore and DMS Options ▪ Whole Ore (WO) Option: Where all the Run of Mine feed Parameter DMS Option WO Option reports directly from the primary crusher to the milling

  12. Slide 12: Reserves & Resources

    Slide 12: Reserves & Resources

    Reserves & Resources PACIFICO MINERALS LIMITED ASX:PMY 12

  13. Slide 13: Mineral Resource Estimate

    Slide 13: Mineral Resource Estimate

    MINERAL RESOURCE ESTIMATE Resource Growth Since Oct. 2018 Acquisition2 • Global Resource of 44.1 Mt @ 3.3% Pb, 38g/t Ag and 0.5% Zn from 20 m 2,000 below surface and open along strike and down dip1. 1,500 • Resource size and confidence level substantially increasing with each Pb Eq. (kt) drilling pr

  14. Slide 14: PFS Mine Plan

    Slide 14: PFS Mine Plan

    PFS MINE PLAN ▪ Open pit mining across four shallow deposits Base Case Mine Plan – By Resource Category with mineralisation from 20m. Tonnes ('000 t) Lead (%) 700 7.0% ▪ Flat topography and easy free dig in first 18m. 600 6.0% 500 5.0% ▪ Life of Mine Strip Ratio of 8.0x (volumetic basis). 400 4.0% ▪

  15. Slide 15: Recent Drilling Success

    Slide 15: Recent Drilling Success

    RECENT DRILLING SUCCESS Pacifico’s drilling has materially increased confidence in ore body geometry, grade, and continuity, resulting in the Omega and Norton deposits with a combined strike length of over 4 km. Noteworthy Expansion and Infill Drilling Intercepts • 22.0m at 8.8% Pb, 52g/t Ag, 0.3% Z

  16. Slide 16: Exploration Upside

    Slide 16: Exploration Upside

    EXPLORATION UPSIDE Exploration Upside • Gravity provides the best vectors and has identified several high priority targets for extensions of mineralisation. Mineralisation correlates with the transition from linear gravity lows to gravity highs. • Pacifico holds a 100% interest in a large exploratio

  17. Slide 17: The Lead and Silver Markets

    Slide 17: The Lead and Silver Markets

    The Lead and Silver markets PACIFICO MINERALS LIMITED ASX:PMY 17

  18. Slide 18: The Role of Lead in the Clean Energy Economy

    Slide 18: The Role of Lead in the Clean Energy Economy

    THE ROLE OF LEAD IN THE CLEAN ENERGY ECONOMY Lead ▪ Lead batteries provide 75% of worldwide rechargeable energy storage1 ▪ Predicted growth in global lead market demand - CAGR of 6.74% between 2018 and 20222. ▪ Lead batteries are a key element in the transition to a low carbon economy, with unrivall

  19. Slide 19: The Role of Silver in the Clean Energy Economy

    Slide 19: The Role of Silver in the Clean Energy Economy

    THE ROLE OF SILVER IN THE CLEAN ENERGY ECONOMY Silver ▪ Silver’s industrial applications, particularly in emerging green industries, provides a supply-demand overlay to the traditional storage of wealth thematic. ▪ Silver is the best-known conductor of electricity and is used in rapidly growing sect

  20. Slide 20: Project Development Timeline Providing Significant Newsflow

    Slide 20: Project Development Timeline Providing Significant Newsflow

    PROJECT DEVELOPMENT TIMELINE PROVIDING SIGNIFICANT NEWSFLOW On track to become a significant lead-silver producer in Western Australia. CY2020 CY2021 Q3 Q4 Q1 Q2 Q3 Q4 PFS Completed Ore Reserve Estimate DFS and Expansion Drilling Definitive Feasibility Study Permitting and Approvals Financing and Of

  21. Slide 21: Thank You

    Slide 21: Thank You

    Simon Noon – Managing Director info@pacificominerals.com.au THANK YOU www.pacificominerals.com.au PACIFICO MINERALS LIMITED ASX:PMY 21

  22. Slide 22: Appendix

    Slide 22: Appendix

    APPENDIX PACIFICO MINERALS LIMITED ASX:PMY 22

  23. Slide 23: PFS Highlights

    Slide 23: PFS Highlights

    PFS HIGHLIGHTS Open-pit project located in a Tier-1 mining jurisdiction with a well-defined large scale Mineral Resource, a Mine Plan underpinned by LOW RISK PROJECT 92% Ore Reserves, a simple crush-mill-float processing circuit, high metal recoveries, key approvals received, pre Native Title teneme

  24. Slide 24: Metallurgy & Processing

    Slide 24: Metallurgy & Processing

    METALLURGY & PROCESSING ▪ PFS metallurgical and engineering studies have confirmed high mineral recoveries via a simple, conventional processing route to produce a high- quality concentrate. ▪ PFS test work confirmed average metal recoveries of 93.3% Pb and 80.3% Ag, for production of an average 62%

  25. Slide 25: Project Layout

    Slide 25: Project Layout

    PROJECT LAYOUT Image: Sorby Hill Site Layout Image: 3D view of the Sorby Hills processing facilities PACIFICO MINERALS LIMITED ASX:PMY 25

  26. Slide 26: Project Physicals

    Slide 26: Project Physicals

    PROJECT PHYSICALS Item Unit Y-2 Y-1 Y1 Y2 Y3 Y4 Y5 Y6 Y7 Y8 Y9 Y10 TOTAL Waste Mined Mt - 5.7 9.3 8.4 16.9 19.2 12.3 8.5 9.5 9.5 7.6 - 106.9 Ore Mined Mt - 1.3 1.1 2.0 0.5 1.7 1.7 1.9 0.9 1.0 2.6 - 14.8 Measured % - 83% 67% 54% 48% 26% 71% 69% 47% - 8% - 46% Indicated % - 17% 33% 45% 50% 62% 28% 30%

  27. Slide 27: Project Cash Flows

    Slide 27: Project Cash Flows

    PROJECT CASH FLOWS Item Real Y-2 Y-1 Y1 Y2 Y3 Y4 Y5 Y6 Y7 Y8 Y9 Y10 TOTAL Lead Price US$/t 2,095 2,095 2,095 2,095 2,095 2,095 2,095 2,095 2,095 2,095 2,095 2,095 Silver Price US$/oz 21.1 21.1 21.1 21.1 21.1 21.1 21.1 21.1 21.1 21.1 21.1 21.1 Exchange Rate A$:US$ 0.7 0.7 0.7 0.7 0.7 0.7 0.7 0.7 0.7

  28. Slide 28: Sensitivities

    Slide 28: Sensitivities

    SENSITIVITIES NPV8 A$M 0 100 200 300 400 500 600 FX (+-20%) 135 556 Pb Price (+-20%) 127 479 Ag Price (+-20%) 248 359 Variable Opex (+-20%) 207 399 Capex (+-20%) 264 342 Fuel (+-20%) 289 319 Pb Flotation Recovery 296 316 (+-1% fresh, +-2% oxide) Ag Flotation Recovery 292 315 (+-4% fresh, +-1% oxide)

  29. Slide 29: Equivalent Calculation

    Slide 29: Equivalent Calculation

    EQUIVALENT CALCULATION The contained metal equivalence formula is based on the Sorby Hills PFS including: • Lead Price US$2,095/t; • Silver Price US$21.1/oz; • Silver recovery of 80.3% (weighted average of oxide and fresh Ag recoveries); and • Silver Payability rate of 95%. It is Pacifico’s opinion

  30. Slide 30: Study Contributors

    Slide 30: Study Contributors

    STUDY CONTRIBUTORS Activity Consultant Resource assessment CSA Global Mining studies Entech Metallurgical Testwork DRA Pacific Process Plant and Infrastructure DRA Pacific Tailings storage Coffey Services Australia Dewatering and Water Supply Pennington Scott Product Logistics Minerals to Market Env

  31. Slide 31: Board and Management

    Slide 31: Board and Management

    BOARD AND MANAGEMENT Experienced Board and Management with a proven track record in exploration and development. Gary Comb Simon Noon Richard Monti Andrew Parker Chairman Managing Director and CEO Non-Exec. Director Non-Exec. Director Engineer with over 30 years’ Experienced executive with a strong