    Advanced Lead-Zinc Resource Development May 2018 Pegmont Deposit Queensland, Australia

  2. Slide 2: Important Information

    Slide 2: Important Information

    IMPORTANT INFORMATION Cautionary Statement on Forward Looking Information This presentation is not directed to, or intended for distribution to or use by, any person or entity that is a citizen or resident or located in any locality, state, country or other jurisdiction where such distribution, publ

  3. Slide 3: Investment Highlights

    Slide 3: Investment Highlights

    INVESTMENT HIGHLIGHTS • Option to acquire 100%, Expenditure and Drill Metre Option Commitments Satisfied • Queensland, Australia : Top Tier Mining Jurisdiction • Lead and Zinc prices at 10 year highs • Close to Existing Mills: Osborne out of feed June ’18, Cannington declining grades, lower producti

  4. Slide 4: Senior Management and Board of Directors

    Slide 4: Senior Management and Board of Directors

    SENIOR MANAGEMENT AND BOARD OF DIRECTORS Michael Williams Peter Voulgaris David Baker Doug Flegg B B.Eng.(Hons), MEngSci. MAusIMM, MAIG MBA CA MBA CFA President, CEO, Director Director, Qualified Person Director (independent) Director (independent) Over 20 years of experience as a senior Over 20 yea

  5. Slide 5: Consultants & Advisors

    Slide 5: Consultants & Advisors

    CONSULTANTS & ADVISORS Ocean Partners David Esser Geoff Richmond B.Sc. (Hons) Geology, MAIG B.Sc. (Metallurgy) FAusiMM Concentrate Marketing Advisor Contract Exploration Manager Contract Chief Metallurgist Ocean Partners Holdings Limited is a base and precious metals concentrate trader providing Ove

  6. Slide 6: Corporate Structure

    Slide 6: Corporate Structure

    CORPORATE STRUCTURE Shares Issued and Outstanding* 144,861,491 Warrants ($0.30 | exp. 05/19) 11,263,328 Options ($0.25 | exp. 10/18) 1,125,000 Options ($0.15 | exp. 12/21) 5,075,000 Options ($0.30 | exp. 10/22) 4,850,000 Fully Diluted 167,174,819 Refined Zinc – Sun Metals Zinc Smelter Townsville Sha

  7. Slide 7: Transaction (All Amounts in Australian Dollars)

    Slide 7: Transaction (All Amounts in Australian Dollars)

    TRANSACTION (ALL AMOUNTS IN AUSTRALIAN DOLLARS) • Option to acquire 100% Amended Agreement Status December 2015 • $2.25m cash payments over 4.5 On TSX:V Approval $250,000 Paid years - $1.0m remaining 2014 Drill Program $350,000 Paid Completed by Vendor • $3m in exploration expenditures over During 2

  8. Slide 8: Mount Isa / McArthur River Province – World Class Lead & Zinc

    Slide 8: Mount Isa / McArthur River Province – World Class Lead & Zinc

    MOUNT ISA / MCARTHUR RIVER PROVINCE – WORLD CLASS LEAD & ZINC McArthur River Mine – Glencore, One of the Worlds Largest Pb/Zn Resources • Production cut backs Myrtle & Teena Projects – Teck • Teck exercised pre-emptive right to acquire Rox’s 30% for total value of $19.6m Century Mine – New Century R

  9. Slide 9: Infrastructure

    Slide 9: Infrastructure

    INFRASTRUCTURE Australia^ 2nd Largest lead producer 2nd Largest zinc producer 4th Largest silver producer Queensland* Australia's largest producer of copper, lead and zinc* Home to over 100 metalliferous mines www.vendettaminingcorp.com | TSXv : VTT ^ Source: U.S. Geological Survey, Mineral Commodit

  10. Slide 10: Infrastructure

    Slide 10: Infrastructure

    INFRASTRUCTURE • 28 km from South32’s Cannington Mine, one of the world’s largest lead and silver mines (3.2 Mtpa) • 25 km from Chinova’s Osborne copper-gold Mine (2Mtpa) • Concentrate rail loading sidings at Phosphate Hill and Cloncurry Mt Isa, a regional mining centre Korea Zinc Townsville: Refine

  11. Slide 11: Infrastructure

    Slide 11: Infrastructure

    INFRASTRUCTURE North Access via Existing Mine Haul Roads Drive Up Drill Sites, Low Cost Drilling East Access via Cannington Mine, Public Gravel & Paved Roads www.vendettaminingcorp.com | TSXv : VTT 11

  12. Slide 12: June 2017 Mineral Resource Update

    Slide 12: June 2017 Mineral Resource Update

    JUNE 2017 MINERAL RESOURCE UPDATE Area Classification Material type Tonnes (kt) Pb % Zn % Ag g/t Transition 685 5.2 2.5 9 Indicated Sulphide 1,379 5.7 2.7 11 Open Pit Total 2,064 5.5 2.6 10 (Zones 1,2,3, & BHZ) Transition 1,035 5.3 2.6 8 Inferred Sulphide 5,276 5.5 2.4 9 Total 6,311 5.4 2.4 9 Underg

  13. Slide 13: Geology

    Slide 13: Geology

    GEOLOGY • Broken Hill Type deposit : Mid Proterozoic stratiform, hosted in banded iron formation and garnet rich quartzite • Galena and Sphalerite mineralisation, banded semi massive to massive • Country rock is a high grade metamorphic quartzite grading out to gneisses (meta-sediments) • Tight isoc

  14. Slide 14: Development Strategy

    Slide 14: Development Strategy

    DEVELOPMENT STRATEGY • Goal : +10 years of Mining Inventory at +1Mtpa Open Pit & Underground • Open Pits & Proximal Underground are the Value Drivers 2017 Drilling focused on increasing Resource Confidence and Expansion of the Open Pit constrained mineralisation June 2017 2.1Mt Indicated & 6.3Mt Inf

  15. Slide 15: Zones 1, 2 & 3 - Open Pit Target

    Slide 15: Zones 1, 2 & 3 - Open Pit Target

    ZONES 1, 2 & 3 - OPEN PIT TARGET • Majority of Zone 1 & 2 Mineral Resources < 100m below surface and constrained within Open Pit Shell • Locked Cycle Metallurgical test work completed, page19 • Identified High Grade Structures not Drilled Systematically in the Past • Room for further expansion and i

  16. Slide 16: Burke Hinge Zone (BHZ) – Open Pit Target

    Slide 16: Burke Hinge Zone (BHZ) – Open Pit Target

    BURKE HINGE ZONE (BHZ) – OPEN PIT TARGET • Located on mining lease ML2621 • Shallowest known sulphide mineralisation at Pegmont, commencing approx. 24 m below surface with Transition (70-80% sulphide) outcropping at surface • Potential low strip starter pit • 250 m Strike length, drilled to a depth

  17. Slide 17: Bridge Zone - 2017 Exploration Success

    Slide 17: Bridge Zone - 2017 Exploration Success

    BRIDGE ZONE - 2017 EXPLORATION SUCCESS • Located on mining lease ML2621 • Successfully drill tested conceptual structural target: connection of the moderate dipping BHZ & the flat dipping Zone 2 • Maiden Mineral Resource to be included in the 2018 Updated Mineral Resource Estimate • Open along strik

  18. Slide 18: Zone 5 – Increasing Zinc Grades

    Slide 18: Zone 5 – Increasing Zinc Grades

    ZONE 5 – INCREASING ZINC GRADES D D’ • Located on EPM 26210 • Known strike length 500 m • Zinc grades continue to improve towards SW and Zinc to Lead ratios approaching or exceeding 1:1 • Open down dip and down plunge to NE and SW • Open Cycle Metallurgical test work completed, page 18 Cross Section

  19. Slide 19: Metallurgy

    Slide 19: Metallurgy

    METALLURGY • 2016/2017 Open Cycle Flotation Test Work performed on diluted composites from Sulphide Zone 5 and BHZ, plus Transition BHZ • 2017/2018 Open and Locked Cycle Flotation Test Work performed on diluted composites of Sulphide Zones 1, 2, 3 and Bridge, plus Transition Zone 1 • Bond Ball Work

  20. Slide 20: Metallurgy

    Slide 20: Metallurgy

    METALLURGY Head Grades Lead Circuit Zinc Circuit (diluted) Area Test Type Pb Recovery Pb Con. Zn Recovery Zn Con. Pb % Zn% % Grade % % Grade % Sulphide Mineralization Zone 1 Locked Cycle 7.92 3.34 91.8 66.3 75.5 54.5 Zone 2 Locked Cycle 7.28 3.23 90.8 67.8 71.3 54.9 Zone 3 Locked Cycle 7.42 3.04 89.

  21. Slide 21: Exploration

    Slide 21: Exploration

    EXPLORATION • BONANZA • BHZ “look-a-like”, potentially two moderately dipping lenses • Same structural position as BHZ • Limited exploration drilling: • PMRD037 5.0 m @ 3.06% Pb, 3.69% Zn • PMRD038 3.4 m @ 2.27% Pb, 3.42% Zn • Encouraging Pb:Zn ratios, potential to develop a shallow open pit target

  22. Slide 22: Comparisons

    Slide 22: Comparisons

    COMPARISONS Selected TSX Projects – Resource & Lead / Zinc Grade Comparison Open Pit ± Underground Projects Highlighted, shaded Projects are Underground Only 60 24% 50 20% 40 16% LEAD + ZINC % TONNES (Mt) 30 12% 20 8% 10 4% 0 0% Measured Indicated Inferred Pb+Zn % Note : tonnes represents companies

  23. Slide 23: 2018 Objectives

    Slide 23: 2018 Objectives

    2018 OBJECTIVES Mineral Resource Update Q2 and PEA Q3 2018 Continue to expand shallow open pit resource (Zones 1, 2 & 3) and nearby underground mineralization (Bridge Zone) Further metallurgical test work on Transition Mineralisation Test regional exploration targets and develop new targets (drillin

  24. Slide 24: Appendices

    Slide 24: Appendices

    APPENDICES • Geological Model : Broken Hill Type Model • Ground Conditions • Zinc : Upward Price Pressure www.vendettaminingcorp.com | TSXv : VTT 24

  25. Slide 25: Geological Model: Broken Hill Type Model

    Slide 25: Geological Model: Broken Hill Type Model

    GEOLOGICAL MODEL : BROKEN HILL TYPE MODEL What is a Broken Hill Type Deposit • Not as common as VMS but with similarities. • Sedimentary basins overprinted by high-grade metamorphism (amphibolite or granulite) • Stacked lenses with low aspect ratio (longer & wider compared to thickness) • Mineralisa

  26. Slide 26: Ground Conditions

    Slide 26: Ground Conditions

    GROUND CONDITIONS Ground Conditions at Pegmont would be classified as “very good” on Barton’s Q system. The deposit is hosted in a quartzite, characterised by very low joint counts, 100% RQD and high intact rock strength (UCS ~100 to 285MPa as tested). There is also a distinct lack of faulting, geol

  27. Slide 27: Zinc: Upward Price Pressure

    Slide 27: Zinc: Upward Price Pressure

    ZINC : UPWARD PRICE PRESSURE Mine closures/reductions since 2013 have removed about 15% of the global supply outpacing Mine closures to alter foreseeable new mine development. supply / demand balance • Brunswick Mine – Xstrata (250 ktpa) – CLOSED 2013 • Perseverance Mine – Glencore (100 ktpa) – CLOS

  28. Slide 28: Mining Corp.

    Slide 28: Mining Corp.

    MINING CORP. TSXv:VTIT

Source: Internet Archive copy of vendettaminingcorp.com

More decks from Vendetta Mining Corp.

All 16 Vendetta Mining decks