  1. Slide 1: Energy for Change

    ENERGY FOR CHANGE 1 March 2018

  2. Slide 2: Key questions

    Key questions: • What is Adaro Energy guidance for 2018? • What is the outlook for coal industry? • What is the progress of Adaro Energy’s projects? • What is Adaro Energy’s strategy and future plans? 2

  3. Slide 3: Adaro Energy 2018 guidance

    Adaro Energy 2018 guidance Coal production (Mt) Consolidated planned strip ratio (bcm/t) 56.2 5.6 5.7 54 - 56 5.2 4.9 4.6 4.5 52.3 52.5 51.5 51.8 2013A 2014A 2015A 2016A 2017A 2018F 2013A 2014A 2015A 2016A 2017A 2018F Operational EBITDA (US$ billions) Capital expenditure (US$ million) 1.3 – 1.5 750

  4. Slide 4: Strong price momentum has continued

    Strong price momentum has continued 120 750 110 700 100 650 90 600 80 550 RMB US$ 70 500 60 450 50 400 40 350 30 300 Global Coal Newcastle (US$) QHD 5500 NAR (RMB) • Coal price remains resilient supported by supply tightness and firm coal demand. • Seaborne thermal coal demand increased by 3% y-o-y

  5. Slide 5: Long term coal demand outlook remains robust

    Long term coal demand outlook remains robust… Seaborne thermal coal demand by country (Mt) • As China’s dominant role in the seaborne market gradually cedes, Southeast Asia and India will become the key drivers. • Electrification in the developing world continues to drive coal demand. Despite renewa

  6. Slide 6: …especially from Southeast Asia

    …especially from Southeast Asia Coal capacity additions inSoutheast Asia per annum • Coal remains as the fuel of choice for developing economies in Southeast Asia. – Affordable and abundant. • Between 2018-2020 there will be ~13GW of coal fired capacity commissioning in SEA. • Total SEA coal import

  7. Slide 7: Quick look on Indonesia

    Quick look on Indonesia Indonesia generation-mix and exports (TWh, Mt) • Indonesia will need to constantly balance its export and domestic market, especially in the near term when exports remain high. » With nearly 50 GW of coal capacity additions and domestic demand growing 2.5 times between now to

  8. Slide 8: Performance of Adaro Energy

    Performance of Adaro Energy 8

  9. Slide 9: Resilient operational and financial results

    Resilient operational and financial results OPERATIONAL 2017 2016 % Change Production (Mt) 51.79 52.64 -2% Sales (Mt) 51.82 54.09 -4% OB removal (Mbcm) 238.70 234.13 2% FINANCIAL (US$ millions, unless indicated) 2017 2016 % Change Net Revenue 3,258 2,524 29% Core Earnings 646 398 62% Operational EBI

  10. Slide 10: Solid balance sheet and strong cash generation

    Solid balance sheet and strong cash generation Reduced debt and achieved net cash Strong cash balance and free cash flow generation 2,500 2.0 1400 2,000 1.6 1200 1,500 1.2 1000 1,000 0.8 800 500 0.4 600 0 0.0 400 2012 2013 2014 2015 2016 2017 -500 -0.4 200 Net debt (cash) (million US$) Net debt to e

  11. Slide 11: Cost control – key in delivering strong performance

    Cost control – key in delivering strong performance Adaro’s estimated coal cash cost 45% Operational EBITDA margin breakdown (2017) 40% 35% Fixed overhead, Mining, 30% 5% 35% - 40% 25% Coal processing, 20% 10% 15% 10% Freight & 5% handling, 20% 0% Harum PTBA Adaro ITMG Shenhua Fuel, 25% - Source: Bl

  12. Slide 12: Delivering return to shareholder

    Delivering return to shareholder 150 60% 50% 120 40% 90 30% 60 20% 30 10% 0 0% 2012 2013 2014 2015 2016 Dividend (million US$) Payout Ratio • Adaro has continued to pay dividend through the cyclical downturn. • Dividend payout ratio since IPO in 2008 averages ~38% and in total we have paid US$1.07 b

  13. Slide 13: Snapshot of Adaro Energy

    ak wr adaro# STORY years, Snapshot of Adaro Energy :

  14. Slide 14: Business model that creates sustainable value

    Business model that creates sustainable value PT Adaro Energy, Tbk (AE) *Simplified Corporate Structure Adaro Mining Adaro Mining Adaro Logistics Power Services Adaro Indonesia (AI) 88.5% Saptaindra Sejati 100% Maritim Barito 100% Makmur Sejahtera 100% Coal mining, S Kalimantan (SIS) Perkasa (MBP) W

  15. Slide 15: Adaro Mining

    Adaro Mining 15

  16. Slide 16: Diversified Coal Assets Across Indonesia

    Diversified Coal Assets Across Indonesia 5 Deepening Coal Product Portfolio and Set to Capitalize Assets to Support Indonesia’s Development 6 1 2 3 4 Adaro has more than 13.5 billion tonnes (Bt) of coal resources (including option to acquire 7.9 Bt) and 1.2 Bt of coal reserves. 1 2 3 4 5 6 Adaro Bal

  17. Slide 17: Over two decades of solid production performance

    Over two decades of solid production performance Adaro’s historical production 60 350 2018 2017 2016 Units Guidance Actual Actual Production 300 50 Mt 54 – 56 51.8 52.6 volume Overburden Removal (Mbcm) Strip ratio bcm/tonne 4.9 4.61 4.45 250 40 Production (Mt) 200 30 150 20 100 10 50 0 0 1998 2011 1

  18. Slide 18: Strong customer base with focus on Indonesia

    Strong customer base with focus on Indonesia Customer type by volume (2017) Geographical breakdown of customers (2017) Philippines, Others, 4% 3% 10% Spain, 4% Indonesia, 20% Taiwan, 6% Hong Kong, 7% Malaysia, 15% India, 8% Power China, 12% Others 90% Japan, 10% South Korea, 11% * Others include cem

  19. Slide 19: Snapshot of Adaro MetCoal Companies (AMC)

    Snapshot of Adaro MetCoal Companies (AMC) • Adaro Energy completed the acquisition of AMC from BHP Billiton for 7 CCOWs in Central and East Kalimantan. • The transaction value was $120 million for 75% of the properties. Adaro now owns 100% of the asset. • First coal production has started at the Haj

  20. Slide 20: Adaro Services and Logistics

    Adaro Services and Logistics 20

  21. Slide 21: Ensuring operational excellence

    Ensuring operational excellence Strengthens Adaro’s Earnings Profile as Contribution to Parent Co Increases • Key part of our vertical integration. • Ensures operational excellence, productivity improvement and timely reliable delivery to customers. • Non coal mining business accounted for 20% of Ad

  22. Slide 22: Adaro Power

    Adaro Power 22

  23. Slide 23: Building the foundation of Adaro's future

    Building the foundation of Adaro’s future Bhimasena Power Indonesia Tanjung Power Indonesia Capacity 2x1000 MW 2x100 MW Stake 34% 65% Acquired Partner(s) J-Power (34%), Itochu (32%) Korea EWP (35%) Location Central Java South Kalimantan • Signed 25 years PPA with PLN • Signed PPA with PLN • Total Ca

  24. Slide 24: Conclusions and takeaways

    Conclusions and takeaways • Coal market is poised towards supply and demand balance. • Indonesia to lessen coal export and focus on the domestic market. • Long term fundamental for coal remains promising. - Indonesia, Southeast Asia and India will be the main drivers. • Our resilient business model