Slide 1: A Progressive Montney Producer for the New Energy Market
A Progressive Montney Producer for the New Energy Market Investor Presentation April 2024
Slide 2: Advantage Corporate Highlights
(1) Advantage Corporate Highlights Market Overview Pure Play Montney Producer Market Capitalization: $1.7 b Decades of top-tier inventory Enterprise Value: $1.9 b Net Debt(2): $233.1 m(3) (Advantage only) Glacier Gas Plant capacity of 425 mmcf/d Shares Outstanding: 161.1 m TSX 52-week high/low: AAV
Slide 3: Corporate Strategy – Strength Across the Board
Corporate Strategy – Strength Across the Board Performance Evolving Competitively ~10% compound annual production Entropy Inc. - growth Modular Carbon Capture and StorageTM Net debt(1) target of $200 m to $250 m(2) Advancing liquids development Bought back ~20% of shares and Technical enhancements d
Slide 4: 2024 Capital Investment Thesis Maximizes AFF Per Share
2024 Capital Investment Thesis Maximizes AFF Per Share(1)(2) Capital Efficiency (1) Glacier $11,600/boe/d 18 wells (18 net) 24% corporate decline rate (1) Production 65,000 to 68,000 boe/d $220 - $250 Net Debt (1) Target $200 million to $250 million(3) million Wembley Net Capital 3 wells (3 net) Exp
Slide 5: Three-Year Strategic Plan: Investing in Measured Production Growth
Three-Year Strategic Plan: Investing in Measured Production Growth Net Capital Expenditures (1)(2) Production Range (2) $300 80,000 75,000 $200 70,000 Millions 65,000 $100 60,000 55,000 $0 50,000 2023 2024 2025 2023 2024 2025 Range 1. See “Specified Financial Measures” in Advantage’s MD&A for the ye
Slide 6: Corporate Strategy: Maximize AFF per Share Growth
Corporate Strategy: Maximize AFF per Share Growth C$3.50/GJ AECO Adjusted Funds Flow per Share at Forward Pricing(1)(2) 2024 AFF Sensitivity(3) $500 $400 C$3.50/GJ AECO Free Cash Flow Dedicated to C$3.00/GJ AECO Shareholder Returns C$2.50/GJ AECO $300 Millions C$2.00/GJ AECO C$1.55/GJ AECO $200 Capi
Slide 7: World Class Assets, Operational Excellence, Environmental Leadership
World Class Assets, Operational Excellence, Environmental Leadership Disciplined Financial Management PROGRESS GLACIER Self-funded growth with free cash flow (1) Glacier Carbon Capture Prolific Gas Foundation & Storage Asset Free cash flow (1) generation with low declines and cost VALHALLA High Qual
Slide 8: Low-Cost Structure: Key Factor in Free Cash Flow Generation
Low-Cost Structure: Key Factor in Free Cash Flow Generation Op Exp Royalty Exp G&A Int Exp $25 $20 $15 $/boe $10 $5 $0 AAV Peer Peer Peer Peer Peer Peer Peer Peer Peer Peer Peer Peer 1. Excludes transportation expense as transportation is not a typical cost as it is generally associated with accessi
Slide 9: Advantage Montney Assets – Multizone Oil, Liquids and Gas Throughout
Advantage Montney Assets – Multizone Oil, Liquids and Gas Throughout Glacier Valhalla Progress Wembley Conroy, BC Doig Upper Montney D4 Middle Montney 300m D3 D2 D1 2024 Targets Lower Advantage Operated HZ Montney Belloy Offset Operator HZ 9
Slide 10: Glacier Core: World-Class Free Cash Flow Engine
Glacier Core: World-Class Free Cash Flow(1) Engine Glacier Production Forecast2 Net Capital Expenditures1,4 & FCF1 Free Cash Actuals Growth Net Operating Income1,2 Flow1 Net Capital Expenditures [MM$]1,2 04-01: 15.6 MMcf/d Base Cumulative Free Cash Flow [MM$]1,2 Engine Production boe/d3 5 well avera
Slide 11: Wembley/Pipestone: Premium Oil-Weighted Asset With Room to Run
Wembley/Pipestone: Premium Oil-Weighted Asset With Room to Run Wembley Production Forecast2 Net Capital Expenditures1 & FCF1 Actuals Net Operating Income1,2 Growth Net Capital Expenditures [MM$]1,2 Base Cumulative Free Cash Flow [MM$]1,2 Production boe/d3 $60MM+ 04-22: Q2/24 2 D4 & 1 D3 2023 2024 20
Slide 12: Progress/Valhalla: Integrated, Prolific Liquids-Rich Assets
Progress/Valhalla: Integrated, Prolific Liquids-Rich Assets Progress/Valhalla Production Forecast2 Net Capital Expenditures1,4 & FCF1 Actuals Net Operating Income1,2 2025 Gas Plant Growth Net Capital Expenditures [MM$]1,2 AAV Pipelines Sets Stage For Base Cumulative Free Cash Flow [MM$]1,2 Productio
Slide 13: Compelling Economics Across Multiple Assets
Compelling Economics Across Multiple Assets Generic Generic Generic Type Liquids AAV Tier 1 Half Cycle Production Generic Type Wells3 Type Curve4 IRR1,4 Payout1,4 Well Capital (%) (%) (months) ($MM)3 Glacier D1 Gas 97% 13 $6.8 2% Glacier D4 Gas 95% 12 $6.8 6% Glacier Upper Gas 107% 12 $6.8 2% Valhal
Slide 14: Since 2020 - All Wells Have Ranged From 2 to 14 Months Payout
Since 2020 - All Wells Have Ranged From 2 to 14 Months Payout1 2020-2022 Well Payout 1 Performance 2H 2020 average 1x payout: 8 mo 2021 average 1x payout: 6 mo 40 2x payout: 19 mo 2x payout: 11 mo 2022 average 1x payout: 6 mo 30 20 10 0 20 15 10 5 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Slide 15: Advantage Montney Gas Wells Dominated 2023 Alberta Results
Advantage Montney Gas Wells Dominated 2023 Alberta Results Calendar-Day Natural Gas Rate (Mcf/d) IP30 Natural Gas Rate (Mcf/d) IP30/100m (mcf/d/100m) 20,000 IP90 Natural Gas Rate (Mcf/d) 800 18,000 IP30/m (mcf/d/100m) 700 16,000 600 14,000 500 12,000 10,000 400 8,000 300 6,000 200 4,000 100 2,000 0
Slide 16: Advantage NEBC Conroy Acquisition – Emerging Liquids-Rich Montney Fairway
Advantage NEBC Conroy Acquisition – Emerging Liquids-Rich Montney Fairway BC AB Conroy T- North • Contiguous 100% WI land base in the Pipeline Conroy liquids-rich Montney trend Conroy Acquisition T-North Ft. Nelson • Acquired at compelling metrics Progress o 33,643 net acres (~53 net sections) NGTL
Slide 17: Deep Inventory of Gas, NGLs and Oil
Deep Inventory of Gas, NGLs and Oil Deep Inventory (1)(2) PROGRESS Tier 1 Inventory – 20 Years | Booked Inventory – 10 Years | Unbooked Inventory - ~50 Years GLACIER 2024 Budget VALHALLA Drill Count WEMBLEY Alberta: 224 Net Sections AAV Lands Liquids-Rich Tier 1 Inventory Middle Montney Two miles
Slide 18: Tier Promotion – Glacier D1 Example
Tier Promotion – Glacier D1 Example 2020 D1 Inventory Map 2024 D1 Inventory Map West Glacier Legacy Well: IP 30 1.4 mmcf/d 2020 Well: IP 30 9.5 mmcf/d East Glacier Legacy Well: IP 30 1.8 mmcf/d 2022 Well: IP 30 15.4 mmcf/d South Glacier Legacy Well: IP 30 3.3 mmcf/d 2024 Well: IP 30 16.9 mmcf/d 2024
Slide 19: Tier Promotion – Wembley Tier 1 Inventory
Tier Promotion – Wembley Tier 1 Inventory 2020 D4 Inventory Map 2023 D4 Inventory Map 2020 Inventory 2023 Inventory D4 Tier 1 D4 Tier 1 D4 Inventory D4 Inventory D4 Drilled D4 Drilled Offset D4 Previous Tier 1 Offset D4 Inventory supported by competitor wells AAV 03-10 2,107 boe/d IP30 (64% Oil and
Slide 20: Well Execution Driving Increased Tier 1 Inventory
Well Execution Driving Increased Tier 1 Inventory Glacier Tier 1 Inventory Valhalla Tier 1 Inventory Wembley Tier 1 Inventory 47% Inventory Growth 26% Inventory Growth 69% Inventory Growth 2020 Inventory Tier 1 Wells Tier 1 2024 Total 2020 Inventory Tier 1 Wells Tier 1 2024 Total 2020 Inventory Tier
Slide 21: Strategic Infrastructure Control, Flexible Pipeline Access
Strategic Infrastructure Control, Flexible Pipeline Access • 425 mmcf/d + 6,800 bbls/d capacity Glacier Gas Plant BC AB TCPL Groundbirch Lateral • 45 mmcf/d + 2,000 bbls/d Valhalla hub • 38 mmcf/d + 5,000 bbls/d Wembley hub – dual connected via AAV Progress Gas AAV Glacier Gas Plant Plant (Sanctione
Slide 22: Natural Gas Market Exposure
Natural Gas Market Exposure Revenue Exposure by Q1/24 Q2/24 Q3/24 Q4/24 2025 27 mmcf/d of TC Market Mainline to Emerson AECO 15% 9% 7% 17% 44% until Nov-32 Empress 22% 22% 23% 22% 14% Emerson 12% 12% 12% 12% 8% Dawn 12% 15% 15% 14% 13% U.S. Midwest 8% 8% 8% 3% 0% Henry Hub (2) 5% 6% 6% 6% 0% Power G
Slide 23: Celebrating Over 20 Years of Sustainability – Net Zero in View
Celebrating Over 20 Years of Sustainability – NET ZERO IN VIEW(1) Industry Leading Low Emissions Environmental Highlights 8% decrease in $2.2 million spent on abandonment and emission intensity(4) reclamation 13% decrease in 14% reduction in sites under active management methane intensity(4) from 20
Slide 24: Entropy: Commercial Carbon Capture And Storage, Today
Entropy: Commercial Carbon Capture And Storage, Today Clean Tech Pure Play Technology • Dedicated, full-service industrial • Exclusive ownership of world- CCS company leading solvent • Proprietary, innovative • Innovative process technology and commercial enhancement technologies structure • Decades
Slide 25: Entropy Inc – Uniquely Positioned in a Global Market
Entropy Inc – Uniquely Positioned in a Global Market Leading the way globally on post-combustion carbon capture Massive Market Opportunity Positioned For Success CCS: IEA Net Zero 2050 Pathway1 Pure-play, full-scope CCS offering 7,600 MTPA CCS to play an • Novel carbon capture solution essential rol
Slide 26: Global Emissions Are Predominantly Post-Combustion
Global Emissions Are Predominantly Post-Combustion Commercial Post-Combustion Carbon Capture is necessary for large-scale decarbonization Post-Combustion Emissions Canada’s Emissions – Breakdown Pre-Combustion Emissions 670 MT CO2 in 2021 • CO2 emissions from “burning fuel” • Byproduct of chemical,
Slide 27: World Map Of Active Commercial CCS Projects
World Map Of Active Commercial CCS Projects CCS projects are widely referenced and based on known technology; however… • Coloured by year in operation, sized by TPA • ~40 MTPA from existing commercial CCS projects MTPA <0.1 7 Year In Operation 1972 1995 2005 2015 2030 Based on known projects current
Slide 28: World Map Of Active Post-Combustion CCS Projects
World Map Of Active POST-COMBUSTION CCS Projects …only four operating commercial CCS projects on post-combustion emissions • Glacier (natural gas) by Entropy • Boundary Dam (coal) by SaskPower • Petra Nova (coal) by JX Nippon • Taizhou Power Plant (coal) by China Energy Investment Group Natural Gas
Slide 29: Global Post-Combustion Capture Project Comparisons
Global Post-Combustion Capture Project Comparisons Operational Glacier Phase 1A & 1B Glacier Phase 1 CE: $660/TPA Average Annual Abatement Rate: 63,000 TCO2e Capture vs Design: 90-100%1 Public Funding: C$20MM Alberta Government Capital Cost: C$31MM (1A), C$14MM (1B) On Stream Date: July 2022 (1A), D
Slide 30: Post-Combustion CCS: Reversing the Impact of Traditional Energy Extraction
Post-Combustion CCS: Reversing the Impact of Traditional Energy Extraction Geoscientists Identify Resource Drilling Operations Resource Production Resource Processing Transport to Market Carbon Captured at Source Carbon Processed/Purified Geoscientists Identify Storage Drilling Operations Transport
Slide 31: Brookfield + Canada Growth Fund: Entropy Strategic Investment
Brookfield + Canada Growth Fund: Entropy Strategic Investment Funding of $500 million and price certainty up to 1 million TPA CO2 Creating value through emissions reduction projects with de-risked financing Transition Strategy $200 Million $300 Million Strategic Investment2 Strategic Investment1 Ent
Slide 32: Canada Growth Fund Strategic Investment
Canada Growth Fund Strategic Investment1 Establishing Canada as a world-leading CCS market The 15-year Carbon Credit Offtake (CCO) commitment represents a global first in compliance markets. The financeable structure helps to de-risk and accelerate private CCS investment by establishing carbon price
Slide 33: Our Business Creating Value by Reducing Emissions
Our Business Creating Value by Reducing Emissions Emitter Full-service CCS Return on • Industrial Point • Steady State Offering to Emitters Investment Source • Environmental • Carbon Credits • Clean-burning • Jurisdiction Attributes • Clean Fuel Regulation • CCS Refundable Credits Incentive Credits
Slide 34: Measuring Performance
Measuring Performance GJ/t is the Key Success Factor in determining project efficiency Solvent Carbon Capture Heat Duty Entropy23TM vs. MEA Energy/Tonne CO2 Energy inputs costs, 5 ~3.85x lower heat duty operating costs 66% higher absorption rate Equipment size and cost Typical MEA Performance Range
Slide 35: Glacier Phase 1 – World's First Gas-Fired CCS Project, From Concept to Reality
Glacier Phase 1 – World’s First Gas-Fired CCS Project, From Concept to Reality Phase 1A Phase 1A Phase 1B Q4 2023 Phase 1B Q4 2023 Phase 1A Phase 1B Phase 2 Q2 Q4 2022 2023 2025 35
Slide 36: Introducing EntropyIQ – Data Management and Reporting for CCS
Introducing EntropyIQTM – Data Management and Reporting for CCS Proprietary Data Capture and Analysis Software ENTROPYIQ • Integration of all control systems and emissions information • Proprietary algorithms project GHG abatement levels and timing • Customizable design can be optimized for any CCS
Slide 37: Reverse Entropy Storage Using Deep Aquifers – The Local Solution Is Often Best
Reverse Entropy Storage Using Deep Aquifers – The Local Solution Is Often Best Emitters Much of North America has suitable deep saline Tonnes CO2/year (000s) geological storage potential for permanent <10 10 100 1000 >1000 sequestration Deep Saline Storage Deposition - Millions of Years Ago In-House
Slide 38: Developing Two Alberta Global-Scale Storage Hubs
Developing Two Alberta Global-Scale Storage Hubs The hubs provide strategic access to develop multiple projects in Alberta 10,000 TPA 9,000,000 TPA Natural Gas Processing Facilities Thermal Oil Facilities Power Plants Grande Prairie Net Zero Gateway 1 • • Joint venture: NorthRiver Midstream Inc. and
Slide 39: Entropy Standardized Designs
Entropy Standardized Designs iCCS Recip iCCS Thermal iCCS Turbine Capture on reciprocating Capture on boilers/steam Capture on simple or combined engines, commonly used for generation cycle gas turbines, commonly gas compression used for power generation Commercial Project: Pre-FID Projects: Pre-FID
Slide 40: Taking Action Today to De-risk Tomorrow
Taking Action Today to De-risk Tomorrow FIRST-OF-KIND SCALE UP 20 mtpa1 Reciprocating Engines Gas Plants GLACIER 200k tpa 40 ITC mtpa1 Carbon Price Thermal Oil Production OTSGs (Boilers) LEISMER 440k tpa Certainty (Other Industrial Applications) Value Gap (IRA), SIF, other 50 mtpa1 Gas Turbines & In
Slide 41: Path to Value Creation
Path to Value Creation Path to IPO(4) and value recognition for AAV involves progressing 2-3 more projects to Commercial Operations and demonstrating a robust pipeline of opportunities at earlier stages of development. Project Value Evolution MOU1 Exclusivity LOI2 FID3 Commercial IPO Ready • Abundan
Slide 42: Advantage Contact Information
Advantage Contact Information Investor Relations 1.866.393.0393 ir@advantageog.com www.advantageog.com Listed on TSX: AAV Advantage Energy Ltd. Suite 2200, 440 – 2nd Avenue SW Calgary, Alberta T2P 5E9 Main: 403.718.8000 Facsimile: 403.718.8332 Advantage Glacier Gas Plant Mike Belenkie, P.Eng. Direct
Slide 43: Appendix
Financial Discipline Operationally Nimble Focus on Profitability APPENDIX
Slide 44: Track Record of Enhancing Efficiency and Performance
Track Record of Enhancing Efficiency and Performance 2008-2022 Wells Drilled MD $12,000 Relentless Drilling, Completion, & Tie-In Cost Efficiency 7000 Relentless Drilling, Completion, & Tie-In Cost Efficiency $10,000 6000 $8,000 5000 $/Tonne Drilled Length 4000 $6,000 3000 $4,000 2000 $2,000 1000 $0
Slide 45: Advisory
Advisory Forward-Looking Information and Statements The information in this presentation contains certain forward-looking information and forward-looking statements (collectively, "forward-looking statements") within the meaning of applicable securities laws relating to the Corporation's plans and o
Slide 46: Advisory
Advisory strategic plan; that the Corporation will have sufficient financial resources required to fund its capital and operating expenditures and requirements as needed; timing and amount of net capital expenditures; the impact of increasing competition; that the Corporation’s conduct and results o
Slide 47: Advisory
Advisory changes in commodity prices, currency exchange rates, net capital expenditures, reserves or reserves estimates and debt service requirements; the occurrence of unexpected events involved in the exploration for, and the operation and development of, oil and gas properties, including hazards
Slide 48: Advisory
Advisory Financial Outlook This presentation contains information that may be considered a financial outlook under applicable securities laws about the Corporation's potential financial position, including, but not limited to, Advantage's 2024 guidance, including its anticipated AFF per share growth
Slide 49: Advisory
Advisory Information Regarding Public Issuer Counterparties Certain information contained in this presentation relating to the Corporation's public issuer counterparties and the nature of their respective businesses is taken from and based solely upon information published by such issuers. None of A
Slide 50: Advisory
Advisory Non-GAAP Financial Measures Operating Netback Operating netback is comprised of sales revenue, processing and other income and realized gains (losses) on derivatives, net of expenses resulting from field operations, including royalty expense, operating expense and transportation expense. Op
Slide 51: Advisory
Advisory Supplementary Financial Measures Corporate Decline Rate Corporate decline rate is calculated by identifying the actual or forecasted production of all the wells onstream at the start of the year, then tracking their cumulative decline by the end of the year, expressed as a percentage. Royal
Slide 52: Advisory
Advisory Oil and Gas Information Barrels of oil equivalent ("boe") and thousand cubic feet of natural gas equivalent ("mcfe") may be misleading, particularly if used in isolation. Boe and mcfe conversion ratios have been calculated using a conversion rate of six thousand cubic feet of natural gas eq
Slide 53: Advisory
Advisory Historical Production See “Production” in Advantage’s MD&A for the year ended December 31, 2023 and the three months ended March 31, 2024 for historical production disclosure by product type. Abbreviations The following abbreviations used in this presentation have the meanings set forth bel