Petrofac Limited · OTC:POFCY
Petrofac — H1 2016 Earnings Presentation
27 slides from Petrofac's earnings presentation, Aug 30, 2016

Slide 1: Interim Results 2016
INTERIM RESULTS 2016 30 August 2016 1

Slide 2: Important notice
Important notice • This document has been prepared by Petrofac • Certain statements in this presentation are Limited (the Company) solely for use at forward looking statements. Words such as presentations held in connection with its "expect", "believe", "plan", "will", "could", Interim Results 2016

Slide 3: Agenda
Agenda • On track to deliver • Putting legacy projects behind us • Delivering value from the IES portfolio • Continuing to drive cost optimisation • Focusing on our core strengths • Managing our balance sheet 3

Slide 4: On track to deliver
On track to deliver • Net profit of US$236m before Laggan-Tormore loss; expect to deliver full year net profit in 2016 in line with expectations • Exceptional items and certain re-measurements of US$123m post-tax, primarily non-cash items related to IES; net book value of IES portfolio stands at US$

Slide 5: Putting legacy projects behind us
Putting legacy projects behind us Laggan-Tormore • Laggan-Tormore project operating successfully and exporting gas since February • Fully demobilised from project site and received provisional acceptance certificate from client, confirming completion of the project FPF1 upgrade and modification • FP

Slide 6: Delivering value from the IES portfolio
Delivering value from the IES portfolio Berantai Risk Service Contract (RSC) • Reached mutual agreement with PETRONAS for cessation of the Berantai RSC from 30 September 2016 • PETRONAS will reimburse the balance of outstanding capital and operational expenditures over the period to June 2017 • Owne

Slide 7: Continuing to drive cost optimisation
Continuing to drive cost optimisation • Successfully bedded-in new organisational structure, both functionally and operationally, with improved cost structure • Continue to strive for best in class performance, underpinning our strong reputation for project delivery • Remain focused on operational e

Slide 8: Focusing on our core strengths
Focusing on our core strengths • E&C/EPS backlog is predominantly with National Oil Companies in our core markets • Existing backlog gives us excellent revenue visibility for the second half of 2016 and full year 2017 30 June 2016 E&C/EPS backlog 30 June 2016 Group backlog ageing by geography (US$bn

Slide 9: Focusing on our core strengths (continued)
Focusing on our core strengths (continued) E&C active and submitted bids by geography • Actively bidding on a large number of Engineering & Construction projects where award is expected in 2H 2016 or 1H 2017 Middle East Africa • Continuing investment from clients in our core markets in both key upst

Slide 10: Managing the balance sheet
Managing the balance sheet Net debt stood at US$877m at 30 June 2016, reflecting: • Cash generated from operating activities (including working capital (WC) adjustments, non- current items, interest, tax, etc.) of US$205m • Investing activities of US$188m • Financing activities of US$208m, including

Slide 11: Managing the balance sheet (continued)
Managing the balance sheet (continued) Balance sheet remains robust and prudently managed, reflected in investment grade credit ratings Credit ratings • Internal gearing ratio target of net debt/EBITDA Moodys Baa3 (negative outlook) < 1X (excluding net finance leases) • Covenants: net debt/EBITDA of

Slide 12: Income statement
Income statement 1H 20161 1H 20151 US$m US$m 3,888 3,180 Revenue Operating profit2,3 340 213 Profit before tax2 288 163 Income tax expense (44) (33) Non-controlling interests (8) - Profit for the period attributable to 236 130 Petrofac Limited shareholders2 EBITDA2 433 305 ROCE4 12% 10% EPS, diluted

Slide 13: Exceptional items and certain re-measurements
Exceptional items and certain re-measurements Exceptional items and certain re- US$m Pre-tax impairment Tax Post-tax impairment measurements predominantly relate to IES portfolio Seven Energy 671 - 67 • Investment in Seven Energy carrying value Berantai RSC 27 (1) 26 reviewed in light of operating e

Slide 14: Engineering & Construction
Engineering & Construction • Revenue h29% – record levels of activity as we deliver progress on our portfolio of projects, having closed 2015 with a record level of year-end backlog • Underlying1 net profit h54% - reflecting the above and the phasing of profit recognition • Underlying1 net margin 7.

Slide 15: Engineering & Production Services
Engineering & Production Services • Revenue h3% – reflecting an increase in revenues from EPCm projects, which more than offset a reduction in activity and cost deflation on operations and engineering contracts • Net profit h456%, net margin 6.4% - improved performance on our reimbursable and EPCm p

Slide 16: Integrated Energy Services
Integrated Energy Services • Revenue i14% – primarily reflecting lower levels of production from the Chergui gas concession due to extended shut-ins • Lower net profit reflects impact of Chergui shut-ins, partially offset through on-going operational and overhead cost savings; 1H 2015 benefited from

Slide 17: Summary
Summary • On track to deliver – Full year net profit in 2016 in line with expectations • Putting legacy contracts behind us – Completion of Laggan-Tormore project and delivery of FPF1 floating production facility • Delivering value from the IES portfolio – Close-out of Berantai RSC and progressing o

Slide 18: Appendices
APPENDICES Petrofac ©

Slide 19: Appendix 1: Key E&C/EPS projects
NOC/NOC led company/consortium Appendix 1: Key E&C/EPS projects Joint NOC/IOC company/consortium IOC/IOC led company/consortium Original contract value to Petrofac In Salah southern fields development, Algeria US$1,200m Petro Rabigh, Saudi Arabia Undisclosed Jazan oil refinery, Saudi Arabia US$1,400

Slide 20: Appendix 2: Key IES projects
Appendix 2: Key IES projects Production Enhancement Contracts (PEC) END DATE Magallanes and Santuario, Mexico 2037 Pánuco, Mexico* 2043 Arenque, Mexico 2043 Risk Service Contracts (RSC) Berantai development, Malaysia** 2020 Equity Upstream Investments Block PM304, Malaysia 2026 Chergui gas concessio

Slide 21: Appendix 3: IES net book value
Appendix 3: IES net book value Intangible oil and gas Oil and gas assets assets (Block PM304, (Block PM304, Chergui and other pre- Greater Stella Area and PECs) development costs) development per note 15 Total US$m US$m US$m US$m Cost At 1 January 2016 1,426 86 160 1,672 Additions 10 1 31 42 Decreas

Slide 22: Appendix 4: Effective tax rate
Appendix 4: Effective tax rate Effective tax rate (ETR) by segment 1H 2016* 1H 2015* Engineering & Construction 26% (7)% Engineering & Production Services 16% 62% Integrated Energy Services (40)% (33)% Group 24% 0% * Before exceptional items and certain re-measurements. • The Group’s effective tax r

Slide 23: Appendix 5: Restated 31 December 2015 results
Appendix 5: Restated 31 December 2015 results Petrofac restated historical results for the year ended 31 December 2015 Consolidation Exceptional items Engineering & Engineering & Integrated Energy adjustments & Business and certain re- Construction Production Services Services Corporate & others eli

Slide 24: Appendix 6: Employee numbers
Appendix 6: Employee numbers Aberdeen Woking London Mumbai Chennai Kuala Lumpur Sharjah Abu Dhabi Key operating centres Other operating locations Corporate services 1,800 100 • Approximately 18,200 people in 7 key operating centres and 24 offices E&C 5,000 EPS • 32% of our employees are IES sharehol

Slide 25: Appendix 7: Segmental performance
Appendix 7: Segmental performance 1H 2016 revenue by reporting segment 1H 2016 revenue by geography 4% 5% 4% 14% 4% 20% Oman UAE E&C Algeria United Kingdom EPS Kuwait 27% Malaysia 27% IES Saudi Arabia Other 76% 12% 7% • Engineering & Construction earned 76% of Group revenues in 1H 2016 • Middle East

Slide 26: Appendix 8: Group reorganisation
Appendix 8: Group reorganisation segments reporting 2016 Engineering & Engineering & Production Services Integrated Energy Construction (E&C) (EPS) Services (IES) service lines Onshore Offshore Offshore Engineering & 2015 Engineering & Capital Projects & Consulting Training Production Developments C

Slide 27: For further details, please contact
For further details, please contact Jonathan Low Head of Investor Relations jonathan.low@petrofac.com +44 20 7811 4930 Jonathan Edwards Investor Relations Manager jonathan.edwards@petrofac.com +44 20 7811 4936 27
Source: company website
More decks from Petrofac Limited
Investor Presentation (2025)22 slides · Aug 15, 2025
H1 2024 Earnings Presentation25 slides · Sep 30, 2024
FY2023 Earnings Presentation29 slides · May 31, 2024
H1 2023 Earnings Presentation27 slides · Aug 10, 2023
FY2022 Earnings Presentation33 slides · Apr 27, 2023
Investor Presentation (2023)20 slides · 2023