Labrador Uranium Inc

Labrador Uranium — Investor Presentation (May 2023)

34 slides from Labrador Uranium's investor presentation, May 3, 2023

  1. Slide 1: Building a Premier Canadian Uranium Exploration Company

    BUILDING A PREMIER CANADIAN URANIUM EXPLORATION COMPANY TRANSFORMATIONAL ACQUISITION OF THE ANGILAK PROJECT CORPORATE PRESENTATION – MAY 2023 CSE:LUR | OTCQB:LURAF | FRA:El1

  2. Slide 2: Disclaimer

    2 Disclaimer CAUTIONARY NOTE REGARDING FORWARD-LOOKING INFORMATION This presentation contains "forward-looking information" within the meaning of applicable available if and when needed and on reasonable terms to conduct further exploration and The mineral resource estimates for Moran Lake contained

  3. Slide 3: Overview

    -_ a a LABRADOR = U R A N |

  4. Slide 4: Project Overview – Strong Canadian Portfolio

    Project Overview – Strong Canadian Portfolio 4 A Premier Canadian Uranium Exploration Company CMB Project, Labrador Angilak Project, Nunavut 635 km2 (265 mi2) 1,520 km2 (536 mi2) 43.3 m lbs U3O8 Historical Resources at 0.69% U3O8 Moran Lake and Anna Lake $8m Budget 2023 $7m Budget 2023 By-Products M

  5. Slide 5: Pro Forma Capital Structure

    5 Pro Forma Capital Structure Angilak Acquisition Closing Early June 2023 DISTRIBUTE PP CURRENT TO VALORE PRO FORMA FINANCING S/H Shares, basic o/s (million) 70.1 100.0 33.0 203.1 PP to fund 2023 Options (million) 6.5 6.5 Angilak work Warrants (million) 13.9 16.5 30.4 program Shares, F.D. (million)

  6. Slide 6: Experienced Board & Management

    6 Experienced Board & Management Name Change to Latitude Uranium Post Angilak Closing Board of Directors Management & Technical Team Phil Williams John Jentz Richard Patricio Justin Reid Greg Duras Nancy Normore Drew Heasman Paul Pearson Executive Chairman CEO and Director Director, CEO Mega Directo

  7. Slide 7: Angilak Project

    I LABRADOR U R A N I|U M ANGILAK PROJECT

  8. Slide 8: Nunavut is a Mining Friendly Territory

    8 Nunavut is a Mining Friendly Territory Polaris Teck Cominco Excellent Jurisdiction for Exploration & Mining Nanisivik Breakwater Mary River Baffinland ▪ Settled land claim, based on clearly defining all rights and obligations of Inuit people and mining industry ▪ Permitting process is clear, fair

  9. Slide 9: Angilak is a District Scale Uranium Project

    9 Angilak is a District Scale Uranium Project Lac 50 Trend Historical Inferred Resource: 43.3 Mlbs U3O8 @ 0.69% in 2.8 Mt ▪ 68,552 hectares (685 km2) 20 km ▪ $95+ million (12 mi) invested since 1975 40 km (25 mi) 1. See Project Footnotes on slide 20 for further technical details. CSE:LUR | OTCQB:LUR

  10. Slide 10: Lac 50 Trend

    10 Lac 50 Trend B Lac 50 Trend Historical 43-101 Resource: 43.3 M lbs U3O8 @ 0.69% (2.8 MT U3O8) 20 km (12 mi) 40 km CSE:LUR | OTCQB:LURAF | FRA:El1 (25 mi) www.labradoruranium.com

  11. Slide 11: High Grade & Shallow Historical Resource

    11 High Grade & Shallow Historical Resource HISTORICAL INFERRED MINERAL RESOURCE ESTIMATE (MARCH 1, 2013) Category Cut-off Tonnes U3O8 Ag Mo Cu U3O8 Ag Mo Cu ▪ 335 drill holes totaling 60,258 m % (000s) % g/t % % M lbs 000 oz M lbs M lbs ▪ All zones start at surface Inferred 0.20 2,831 0.69 20.6 0.1

  12. Slide 12: 2km Gap Between J4 & EE

    12 2km Gap Between J4 & EE ▪ Winter drilling was not done historically ▪ Winter drilling can be done on and around the frozen lakes and bodies of water ▪ Need to plan winter lake drilling at start of season (April-May) CSE:LUR | OTCQB:LURAF | FRA:El1 www.labradoruranium.com

  13. Slide 13: Resource Expansion Targets

    13 Resource Expansion Targets Discovery Potential Between Zones & on Strike & Off-Sets PROVEN & EFFECTIVE TARGETING METHODOLOGY 1. Uranium-bearing structures (graphite-chlorite tuffs) are highly conducted 2. Ground VLF-EM defines distinct and well-defined targets typically associated with near-surfa

  14. Slide 14: Lac 50 Trend

    14 Lac 50 Trend Main, Western Extension Zones (off-map) Zero drill holes east along J4-Ray trend (over 4.5 km) One drill hole J4 West Target* Eastern (18/21 holes hit U3O8) Extension *pre-resource J4, Ray Zones Zone Lake Lake Lake Lake 1 km Basemap: WorldView-3 true colour imagery, and VLF-EM (Frase

  15. Slide 15: Lac 50 Favourable Economic Profile

    Lac 50 Favourable Economic Profile ▪ Grade is important ▪ Other important economic drivers include: ▪ Ore body orientation ▪ Structural controls ▪ Mining method ▪ Metallurgy ▪ Ore sorting / Grade upgrading CSE:LUR | OTCQB:LURAF | FRA:El1 www.labradoruranium.com 15

  16. Slide 16: Beneficiation & Metallurgical Testing

    Beneficiation & Metallurgical Testing 16 Angilak Project Impurity Analysis of Yellowcake Product from Lac 50 deposit Test results indicate potential to cost-effectively extract Limited without Limited without Angilak Yellowcake uranium and produce a high purity yellowcake product Penalty rejection U

  17. Slide 17: CMB Project

    I LABRADOR U R A N I|U M CMB PROJECT

  18. Slide 18: Dominant Land Position in Central Mineral Belt of Labrador

    18 Dominant Land Position in Central Mineral Belt of Labrador +50 Years of Exploration & Data by Various Companies CMB Project ▪ 152,865 ha covering a significant portion of the belt ▪ Significant resource base with strong discovery potential belt wide Anna Lake Anna Lake Deposit1 Trend ▪ Nearby lar

  19. Slide 19: Anna Lake & Mustang Lake Projects

    Anna Lake & Mustang Lake Projects 19 Proximal to Paladin Energy’s Michelin Deposit ▪ Multiple uranium and polymetallic targets ▪ Located ~15 km northwest of Michelin Deposit Anna Lake ▪ Trend Anna Lake Strike length of 750 m and extends down-dip to 663 m within broadly undulating sheetlike body and

  20. Slide 20: Moran Lake C Zone

    20 Moran Lake C Zone Uranium & Vanadium Mineralization with Expansion Potential ▪ Access by helicopter and float plane out of Goose Bay ▪ >C$25M of historic exploration work completed ▪ Uranium mineralization is structurally controlled, typically hosted within fracture systems and to a lesser extent

  21. Slide 21: CMB Project – Regional Targeting

    CMB Project – Regional Targeting 21 District Scale Uranium and Copper Exploration Mineral Occurrences Geology Lake Water Geochem Till Radiometrics Sediment Geochem TARGETING SURFACE Lake Gravity Sediment Geochem Magnetics Trace Geochem ▪ Significant historical exploration work by multiple private an

  22. Slide 22: Dual Focused Strategy

    22 Dual Focused Strategy $15 Million Work Program Planned For 2023 District Wide Target and Project Generation Near Term Angilak Resource Growth Airborne survey and soil geochemistry to add drill targets Angilak 6,000 m drill testing key targets in Lac 50 trend Mustang Lake Ground geophysics and tar

  23. Slide 23: Building a Premier Canadian Uranium Exploration Company

    23 Building a Premier Canadian Uranium Exploration Company Transformative Two emerging Proven company acquisition of the uranium camps with builders with a large, high-grade massive discovery leading technical Angilak Project potential team CSE:LUR | OTCQB:LURAF | FRA:El1 www.labradoruranium.com

  24. Slide 24: Appendix

    a ai a LABRADOR = U R A N |

  25. Slide 25: Angilak Location & Infrastructure

    Angilak Location & Infrastructure 25 Angilak Camp Transportation & Logistics ▪ Camp capable of hosting 50+ people ▪ ~225 km south of the community of during the summer Bake Lake, with regular flights to/from ▪ Open during exploration season from Winnipeg, MB and Yellowknife, NWT Orano April to Septe

  26. Slide 26: Overview of Mining in Nunavut

    Overview of Mining in Nunavut 26 ▪ Mining has been the key economic driver in the Canadian north for the past 90+ years with at least one new mine opening each decade since the 1930’s ▪ The NWT & Nunavut Chamber of Mines has been the voice of the Canadian north mining since 1967 ▪ Shortly after Nuna

  27. Slide 27: Nunavut Mine Permitting is Well Established

    Nunavut Mine Permitting is Well Established 27 ▪ Angilak is comprised of [139] mineral claims and a single Inuit Owned Land (IOL) parcel that has an mining agreement with NTI ▪ Nunavut Tunngavik Inc. (NTI) is the corporation responsible for administering subsurface mineral rights on Inuit-owned land

  28. Slide 28: Geology of Angilak & Lac 50 Trend

    Geology of Angilak & Lac 50 Trend 28 ▪ Lac 50 is a basement hosted, vein-hydrothermal type, unconformity- associated uranium deposit ▪ The Lac 50 Trend is structurally and stratigraphically controlled within a graphitic (graphite-chlorite) tuff unit in Archean basement basaltic metavolcanics ▪ Miner

  29. Slide 29: Proven & Effective Targeting Methodology

    Proven & Effective Targeting Methodology ▪ U-bearing structures are highly conductive ▪ Ground VLF-EM defines distinct and well-defined targets typically associate with near-surface uranium mineralization VLF-EM CSE:LUR | OTCQB:LURAF | FRA:El1 www.labradoruranium.com

  30. Slide 30: Proven & Effective Targeting Methodology

    Proven & Effective Targeting Methodology ▪ Geochemistry effectively zeros in on uraniferous structures ▪ U-in-soils geochemistry and enzyme- leach (EL) soil sampling VLF-EM U-in-Soils CSE:LUR | OTCQB:LURAF | FRA:El1 www.labradoruranium.com

  31. Slide 31: Proven & Effective Targeting Methodology

    Proven & Effective Targeting Methodology Multiple additional U-rich structures Property-wide, drill-ready targets ▪ Drill test down-dip targets with coincident VLF- EM conductors and U-in-soils anomalies ▪ High-grade U drill intercepts followed up down-dip and along strike VLF-EM U-in-Soils Drilling

  32. Slide 32: Proven & Effective Targeting Methodology

    Proven & Effective Targeting Methodology Pre-resource target (i.e. Pulse, Hot, ML, Blaze, Spark, Flare) ▪ Extensive high-grade U3O8 is intercepts led to development of Lac 50 resource ▪ Multiple targets drilled pre-EL soils, so massive discovery and resource expansion potential remains VLF-EM U-in-S

  33. Slide 33: Project Footnotes

    33 Project Footnotes ANGILAK HISTORICAL MINERAL RESOURCE ESTIMATE 1. The mineral resource estimates contained in this table are considered to be “historical estimates” as defined under NI 43-101, and are not considered by LUR or ValOre to be current. 2. Reported by ValOre Metals Corporation in a Tec

  34. Slide 34: Contact Information

    CSE:LUR | OTCQB:LURAF | FRA:El1 Contact Information Labrador Uranium 303 – 217 Queen St. West Toronto, ON, Canada M5V 0R2 www.labradoruranium.com Email: info@labradoruranium.com

Labrador Uranium — Investor Presentation (May 2023) on 6ix