Southern Palladium Ltd. · ASX:SPD

Southern Palladium — Africa Down Under (September 2025)

17 slides from Southern Palladium's conference presentation, Sep 1, 2025

  1. Slide 1: Southern Palladium Limited: The Next Major PGM Development Opportunity

    SOUTHERN PALLADIUM LIMITED THE NEXT MAJOR PGM DEVELOPMENT OPPORTUNITY PAGE 1

  2. Slide 2: Disclaimer

    DISCLAIMER The following disclaimer applies to this investor presentation (Presentation). You should read this disclaimer carefully before reading or making any other use of this Presentation or any information contained in this Presentation. By accepting this Presentation, you represent and warrant

  3. Slide 3: Why Platinum Group Metals?

    WHY PLATINUM GROUP METALS? CRITICAL MINERALS TO POWER MAJOR INDUSTRIES Strategic Relevance: PGMs (platinum, palladium, rhodium, ruthenium, iridium, osmium) are classified by all major economies as critical minerals due to their essential role in clean energy, automotive, and electronic industries. D

  4. Slide 4: Global PGM Markets: Structural Deficit Developing

    GLOBAL PGM MARKETS STRUCTURAL DEFICIT DEVELOPING Bengwenyama Prill Split and Revenue Split based on PFS Platinum: 40 m Waterberg Deposit 13 story stopes • Significantly deeper platinum market deficit than previously forecast.1 • Weaker recycling supply • Primary supply fell by 13% in the March quart

  5. Slide 5: Tier-1 PGM Asset Ideally Located in Prime PGM Mining Real Estate

    TIER-1 PLATINUM GROUP METAL (PGM) ASSET: IDEALLY LOCATED IN PRIME PGM MINING REAL ESTATE - AMONG WELL- ESTABLISHED MINING OPERATIONS WITH EXISTING SERVICES, SKILLS & INFRASTRUCTURE EASTERN LIMB + Ni+Cu+Cr2O3 / Bengwenyama Project / 300 km Pretoria Johannesburg PAGE 4

  6. Slide 6: Corporate Overview

    CORPORATE OVERVIEW Bengwenyama Share Price ASX/JSE A$0.59 ZAc636 Community A$ ZAR Total number of shares issued 106.95m Southern Nurinox Market cap 1 63m 721m 8% Palladium Investments Cash at Bank 2 9.1m 103.7m Limited (Pty) Ltd Enterprise Value 53.6m 617m Options with exercise price of A$0.875 expi

  7. Slide 7: The Creation of a Tier 1 Project

    THE CREATION OF A TIER 1 PROJECT ONE OF THE LARGEST REMAINING UNDEVELOPED PGM RESOURCES 82 drillholes SPD EV/oz : were completed 30,746m USD1.46/oz1 Mineral Resource The UG2 (M&l) Mineral ounces (M,I&I) Resource ounces 40.25Moz2 8.17Moz at a UG2 and grade of 9.89 g/t over Merensky Reef 73cm ENVIRONM

  8. Slide 8: Maiden JORC Reserve of 6.29Moz (6E)

    THE CREATION OF A TIER 1 PROJECT MAIDEN JORC RESERVE OF 6.29MOZ (6E) EV/oz Attributable Reserve (4E) - Listed South Maiden Ore Reserve of African PGM Developers and Producers 6.29 Moz1,2 on 23 October 2024 Developers 158.44 Producers 141.14 31.72Mt @ 6.17g/t 6E plus USD/oz Reserve Cr2O3 @19.03% over

  9. Slide 9: Optimised Prefeasibility Study: Bengwenyama Key Project Results

    OPTIMISED PREFEASIBILITY STUDY BENGWENYAMA KEY PROJECT RESULTS UG2 Reef OPFS based on the weighted basket PGM price used in the original PFS, which is now ~13% lower than Stage 1 1.2Mtpa current spot prices. Every 15% move in the PGM price Stage 2 2.4Mtpa basket equates to an approximate US$200 mill

  10. Slide 10: Optimised Prefeasibility Study: Staged Process

    OPTIMISED PREFEASIBILITY STUDY STAGED PROCESS • 2024 PFS confirmed that SPD can establish a Tier 1 project on the UG2 with a LoM of more than 20 years. • Next logical step was to align the base case with alternative funding options • Strong focus on achieving full production capacity as quickly as p

  11. Slide 11: Optimised Prefeasibility Study: Highly Attractive Option

    OPTIMISED PREFEASIBILITY STUDY HIGHLY ATTRACTIVE OPTION • Stage 1: Peak funding requirement of US$279m – representing a 38% reduction (US$173m) to the peak funding total set out in the PFS (US$450m) • Stage 2: expansion capital to be funded through cashflow Stage 1 Stage 1 & Stage 2 Peak Funding: US

  12. Slide 12: Optimised Prefeasibility Study: Ore Production Ramp Up

    OPTIMISED PREFEASIBILITY STUDY ORE PRODUCTION RAMP UP Stage 1 Stage 2 Construction and Ramp-up North Decline South Decline PAGE12

  13. Slide 13: Optimised Prefeasibility Study: Production Profile

    OPTIMISED PREFEASIBILITY STUDY PRODUCTION PROFILE Stage 1: Initially from South Decline Stage 2: South and North Decline 100ktpm,@5.97g/t Head Grade 200ktpm,@6.54g/t Head Grade 85% Recovery > 200 000 oz pa 85% Recovery > 400 000 oz pa PAGE13

  14. Slide 14: Pathway to Development: Key Near-Term Milestones

    PATHWAY TO DEVELOPMENT KEY NEAR-TERM MILESTONES TO UNLOCK VALUE FID Mining Right Granting 2026/Jun Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Options Studies 100% Optimised PFS 100% Pitting for surface Geotech studies Drilling for detailed Met, Geotech Studies and Resources infill DFS DFS Study work Independent Tec

  15. Slide 15: Why Invest in Southern Palladium?

    WHY INVEST IN SOUTHERN PALLADIUM? BENGWENYAMA IS A TIER-1 PGM PROJECT IN A PREMIER MINING JURISDICTION WORLD-CLASS MINERALISATION CORPORATE AND SOCIAL RESPONSIBILITY • Large resource / reserve base (40Moz/6.3Moz 6E) • Long standing relationship with a single • High grade reserve (6.2g/t) of the UG2

  16. Slide 16: Contact Us

    CONTACT US Johannesburg, South Africa Coldstream Office Park, Suite 6 2 Coldstream Street Little Falls Roodepoort Johannesburg Sydney, Australia Level 1, 283 George Street, Sydney, NSW 2000 Email: info@southernpalladium.com The information in this presentation relating of Resources and Reserves is e

  17. Slide 17: Platinum Group Metals Resources - Projects

    PLATINUM GROUP METALS RESOURCES - PROJECTS Name and Ticker - Project Exchange Project Sources Status FY2024 Annual Report, Dec 2024 Quarterly Activities Report Scoping Study Podium Minerals Limited (POD) ASX Parks Reef Scoping Study, PreFeasibility Study (PFS) targeted for completion in 2024 Annual

Southern Palladium — Africa Down Under (September 2025) on 6ix