SSE PLC · LSE:SSE

SSE — Siemens Wind Power — Investor Presentation (September 2015)

15 slides from SSE's investor presentation, September 2015

  1. Slide 1: Siemens Wind Power – Beatrice Supplier Day

    Beatrice Supplier Day – Elgin & Wick September 2015 Siemens Wind Power Restricted © Siemens AG 2015 All rights reserved. siemens.com/answers

  2. Slide 2: Presentation topics

    Presentation topics • Beatrice project • Supply Chain Requirements • Registration process Restricted © Siemens AG 2015 All rights reserved. Page 2

  3. Slide 3: Siemens Wind Power – Beatrice Project scope

    Siemens Wind Power – Beatrice Project scope Siemens Wind Power awarded preferred supplier of the turbine contract . Scope of our contract includes; • Engineering • Procurement • Installation • Vessels • Offshore Commissioning • Warranty and Service period Of 83/4 Siemens 7.0 - 154 Wind Turbines Rest

  4. Slide 4: Individual blades are 75m long

    Individual blades are 75m long Restricted © Siemens AG 2015 All rights reserved. Page 4

  5. Slide 5: Quayside – Pre-Assembly operations

    Quayside – Pre-Assembly operations Restricted © Siemens AG 2015 All rights reserved. Page 5

  6. Slide 6: Offshore Installation of Siemens 6MW (Gunfleet Sands III)

    Offshore Installation of Siemens 6MW (Gunfleet Sands III) Restricted © Siemens AG 2015 All rights reserved. Page 6

  7. Slide 7: Siemens investment in Green Port Hull

    Siemens investment in Green Port Hull – A world-class offshore wind manufacturing and assembly facility Siemens will invest around £160m in the Green Port Hull facility (£310m combined investment with ABP). These investments will create 1,000 jobs in the UK There are three significant elements: 1 A

  8. Slide 8: Siemens plc – supplier selection criteria

    Siemens plc – supplier selection criteria • Environment, Health & Safety • Competence • Delivery • Value for money Above all suppliers need to bring a competitive advantage Restricted © Siemens AG 2015 All rights reserved. Page 8

  9. Slide 9: Local and National Supply Opportunities

    Local and National Supply Opportunities Facilities Management Temporary Site Off site Buildings Accommodation Ground Small Plant transport Hire Existing ‘Frame’ Agreements in place Tools & - Bottled Water Consumables Supply Opportunities Communication Hardware Office Supplies Marine Coordination Mar

  10. Slide 10: Example - Machined Parts

    Example - Machined Parts Milled Parts Turned Parts Size: up to 50-800mm Size: up to 5-3000mm Material: Alu, steel Material: Alu, steel Surface treatment: Galvanized, Surface treatment: Galvanized, painted, spay metalized, electro painted, spay metalized, electro galvanized galvanized Restricted © Si

  11. Slide 11: Supply Chain Approach – Industry Engagement

    Supply Chain Approach Industry Engagement Working with key intermediaries; • H & I Enterprise • Scottish Enterprise • Scottish Renewables • Renewable UK • Offshore Renewable Energy Catapult • The Crown Estate • Other Intermediaries Restricted © Siemens AG 2015 All rights reserved. Page 11

  12. Slide 12: How to engage and advice for potential suppliers

    How to engage and advice for potential suppliers; Understand the market • Who’s your customer? • Recognise that component supply may be 2nd or 3rd tier Understand what you offer • LCOE Reduction • Logistics advantage Lever Support networks • Enterprise Agencies • Scottish Renewables and R-UK • Other

  13. Slide 13: Supplier Qualification

    Supplier Qualification Siemens are committed to using local suppliers wherever possible. It makes sense commercially and technically. These are the criteria which would qualify “ready for business” (R4B): Approach to Health, Safety and Reliable Delivery the Environment Competence & Value for money Q

  14. Slide 14: Summary of Qualification Processes

    Summary of Qualification Processes For contracts > £40,000 p.a. Decision Decision Supplier Product / Service Gate Gate Qualification Qualification R4B R2O Ready for Business Ready to Order • Business Performance • Product & Process Analysis Verification • NDA & CoC signed • Process Audit • QMS Audit

  15. Slide 15: Contact details

    Contact details Paul Savvides Procurement Manager – Onshore and Offshore Phone: +44 (0) 7808 826004 paul.savvides@siemens.com Cherie Orr (MCIPS) Procurement Operations Manager Power Generation Services, Wind Power Mobile +44 (0) 7921 247110 cherie.orr@siemens.com siemens.co.uk Restricted © Siemens A

Siemens Wind Power — Investor Presentation (September 2015) on 6ix